Tender Overview
The Indian Army, Department of Military Affairs, invites bids for multiple electrical and mechanical components listed under the CATEGORY including FUSE LINK 100 AMPS, 160 AMP MAGNETIC SWITCH, BARREL CYLINDER, BRAKE HOSE PIPE TOWING, HOSE PIPE, NUT SET BOLT, MOUNTING RESILIENT, PAD MOUNTING RUBBER, FUEL FLEXIBLE PIPE, SOLENOID, MCB CONTRACTOR, and AIR FILTER ELEMENT. Procurement location is Murshidabad, West Bengal 731128. The tender encompasses the supply of 12 item categories with unspecified quantities, and there is an option clause allowing up to 25% quantity variation during contract execution. The absence of explicit estimated value or EMD details requires bidders to prepare flexible pricing and confirm quantities post-clarification. Unique bid terms emphasize delivery sequencing from the last date of the original delivery order, with adjusted timelines if options are exercised. This tender targets defense-grade spares and requires bidders to align with statutory bid terms while accommodating potential scale adjustments.
Technical Specifications & Requirements
- Item scope includes: FUSE LINK 100 AMPS, 160 AMP MAGNETIC SWITCH, BARREL CYLINDER, BRAKE HOSE PIPE TOWING, HOSE PIPE, NUT SET BOLT, MOUNTING RESILIENT, PAD MOUNTING RUBBER, FUEL FLEXIBLE PIPE, SOLENOID, MCB CONTRACTOR, AIR FILTER ELEMENT
- No explicit technical specifications provided in data; bidders should seek clarification on exact part numbers, tolerances, materials, and finish
- Bid terms include a 25% quantity option and extended delivery timelines calculated as (Increased quantity Ă· Original quantity) Ă— Original delivery period, minimum 30 days
- Delivery schedule to be coordinated with last-date-of-original delivery order; extended delivery may be requested under option clause
- No EMD or estimated value disclosed; bidders should request exact figures during due diligence
- Emphasis on defense-grade spares suitable for Indian Army requirements; ensure compatibility with listed components
Terms, Conditions & Eligibility
- Quantity variation right: up to 25% increase during contract and currency of contract
- Delivery period adjustments depend on option clause; minimum additional time 30 days
- EMD amount and payment terms not disclosed; confirm through bidder inquiry
- Tender requires compliance with buyer-added terms; ensure adherence to delivery sequencing and extension calculations
- 12 item categories to be supplied; ensure correct part numbers and specs at submission
- No explicit warranty or penalty details provided; bidders should seek clarification on after-sales support and LD clauses