Tender Overview
NHDC Limited, Hydro Power division, invites tenders for the supply of a 420 KV Capacitive Voltage Transformer (CVT) of the CGPISL make. The scope is limited to the supply of goods, with an EMD of ₹68,714 and location at East Nimar, Madhya Pradesh (450001). The tender contemplates quantity fluctuations up to 25% during contract execution and requires bidders to ensure product obsolescence risk is low with a minimum 3 years residual market life. The procurement emphasizes OEM/authorized distributor compliance, GST considerations, and mandatory bidder documentation, highlighting the importance of timely delivery aligned to contract terms. Unique elements include the option clause on quantity and the requirement to maintain product lifecycle integrity over the contract period.
Technical Specifications & Requirements
- Product: 420 KV Capacitive Voltage Transformer (CVT), CGPISL make.
- Scope: Supply of Goods; delivery terms align with option clause for quantity adjustments up to 25%.
- Evaluation/obsolescence: product must have at least 3 years residual market life; not declared end-of-life by OEM.
- Documentation: bidders must attach PAN, GSTIN, Cancelled Cheque, and EFT Mandate; OEM authorization required for distributors.
- Certifications: upload required certificates/documents as per ATC/Corrigendum; GST applicability to be determined by bidder.
- EMD: ₹68,714 to accompany bid; no explicit payment terms disclosed.
- Scope of supply: Only supply of goods; no installation or after-sales specified.
- Compliance: bidders must ensure non-obsolescence and maintain standard market life during contract.
Terms & Eligibility
- Delivery: delivery period as per original order with potential extension via option clause; minimum extension baseline 30 days.
- Payment: GST handling to be finalized by bidder; reimbursement as per actuals or applicable rates (whichever lower).
- Documentation: bid must include PAN, GSTIN, Cancelled Cheque, EFT Mandate; Manufacturer Authorization for OEMs.
- Compliance: ensure product is not obsolete; provide evidence of active OEM support and residual market life.
- Penalties: terms allow quantity changes and delivery time recalculation; adherence to ATC and corrigendum mandatory.