MDF board Screen,Iron Stage Floor,Wooden Screen,Wooden Screen made with material green panel,Rubbin
Indian Air Force
AMBALA, HARYANA
Bid Publish Date
16-Nov-2025, 6:54 pm
Bid End Date
01-Dec-2025, 7:00 pm
Bid Opening Date
01-Dec-2025, 7:30 pm
Location
Progress
Quantity
432
Category
Workstation with fabric pin up notice boards
Bid Type
Two Packet Bid
The Indian Army (Department Of Military Affairs) invites bids for a Workstation with fabric pin up notice boards, including Aluminium frame with MDF metallic panels and Wooden finish MDF wall panelling. The BOQ lists 0 items currently, with no explicit estimated value or location details provided. The tender page notes an option clause allowing quantity adjustments up to 25%, both at bid and during contract execution, with delivery timelines derived from the original order. Bidder submission requires core documents such as PAN Card, GSTIN, Cancelled Cheque, and an EFT Mandate. An Optional Site Visit is offered to assess installation needs before bid submission. A Non-Disclosure Declaration is mandatory, ensuring confidentiality of contract specifics. This tender emphasizes potential volume flexibility and site assessment prior to commitment, shaping the bid strategy around modular wall fittings and fabric-panel components.
Keywords: tender in India, Indian Army procurement, workstation with notice boards, aluminium frame MDF panels, site visit, NDA.
Product/service: Workstation with fabric pin-up boards; aluminium frame; MDF metallic panels; wooden finish MDF wall panelling
No explicit measurements or standards provided
3-year govt/PSU supply experience requirement
EMD not specified in data
25% quantity variation right during contract
Optional site visit including risk indemnity
NDA and EFT mandate documentation required
Material quantity may vary by up to 25% during contract
3 years govt/PSU supply experience required with contract copies
Mandatory PAN, GSTIN, cancelled cheque and EFT mandate
Not specified in data; bidders should obtain terms at bid submission and confirm with procurement.
Delivery period starts from last date of original delivery order; extra time based on (increased quantity / original quantity) × original period, min 30 days.
Not specified in data; verify during bid and in contract terms.
3 years govt/ PSU supply experience for similar products
Ability to satisfy documentation requirements (PAN, GSTIN, EFT Mandate)
Compliance with NDA and site visit obligations
Indian Air Force
AMBALA, HARYANA
Indian Army
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
Indian Navy
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate certified by bank
Non-Disclosure Declaration on bidder letterhead
Experience contracts/copies proving 3-year govt/PSU supply
Site visit reports (if conducted) and installation feasibility notes
OEM authorization (if applicable)
Key insights about MANIPUR tender market
Bidders must meet eligibility by proving 3 years govt/PSU supply for similar products, submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate. Upload NDA and mandatory site-visit details if required. Ensure compliance with the 25% quantity variation clause and provide installation feasibility information.
Required documents include PAN Card, GSTIN, Cancelled Cheque, EFT Mandate certified by bank, Non-Disclosure Declaration, and evidence of 3 years govt/PSU supply contracts. Include OEM authorizations if applicable and site-visit reports or feasibility notes.
Delivery is governed by the original delivery order date; option to extend for increased quantity using the formula (Increased quantity / Original quantity) × Original delivery period, with a minimum of 30 days. Ensure alignment with installation site readiness and BOM confirmation.
Suppliers must demonstrate 3 years govt/PSU supply experience for similar products, with contract copies for each year. OEM or reseller through channels acceptable; primary product value should meet the criterion in bunch bids.
Yes, bidders must submit a Non-Disclosure Declaration on their letterhead, committing not to share contract details or specifications and accepting legal action for violations per governing rules.
Site visits are optional; bidders bear the costs and must provide indemnity against liabilities during visits. Visits help validate installation space for fabric pin-up boards, aluminium frame, MDF panels, and wooden finish panelling installation.
Key components include fabric pin-up notice boards, aluminium frame, MDF metallic panels, and wooden finish MDF wall panelling. No explicit dimensional specs are provided; bidders should confirm sizes, mounting methods, and finish tolerances during site assessment.
The tender data does not specify formal standards; bidders should verify compatibility with site requirements and any applicable internal standards, and confirm whether IS/I S 550-like specifications are needed through the procurement cell prior to bid submission.
Access all tender documents at no cost
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS