Tender Overview
Central Railway invites bids for a Self Priming Centrifugal Pump conforming to IS 5120 under the Q3 category for delivery in Thane, Maharashtra. The procurement scope is the supply of goods (pump units) with an adaptable quantity framework allowing a 25% up/down variation. The contract emphasizes post-receipt inspection at the consignee site, and invoicing must reflect the consignee’s GSTIN. The BOQ shows no items yet, signaling a streamlined supply contract focused on a defined pump model family and associated accessories. A key differentiator is the option clause enabling quantity adjustments at contracted rates, enabling procurement flexibility within the project window. Supplier’s attention to GST treatment and pre-confirmation of delivery readiness is essential.
Technical Specifications & Requirements
- Pump Type, Size (Dia) of solids in liquid, Suction Pipe size (Nominal), Delivery pipe size (Nominal) mapped to generic pump data
- Pump Shaft, Impeller Material, Motor Body, Motor Type, Motor Enclosure, and Degree of Protection as construction-oriented requirements
- Compliance with IS 5120 for self priming centrifugal pumps; ensure components align with IS norms where applicable
- Diverse material and enclosure configurations may be required to match site installation constraints; confirm compatibility with existing piping and electrical feed
- Tender expects installation-ready pump assemblies with appropriate electrical and mechanical interfaces
Terms, Conditions & Eligibility
- Option Clause: Purchaser may vary quantity by up to 25% at contract delivery, with proportional delivery time adjustments
- GST: Bidder to verify GST; reimbursement as per actuals or applicable rate, whichever is lower, up to quoted GST%
- Invoicing: Invoice must be raised in the name of the consignee with the consignee GSTIN
- Scope: Bid price must include all costs for the supply of goods only
- Inspection: Post-receipt inspection at consignee site; pre-dispatch inspection not specified unless ATC indicates otherwise
- Additional terms and compliance requirements are to be adhered to as per buyer ATC and Central Railway procurement norms