kjeldahl digestion cum distillation assembly unit with fume hood
Director,agriculture & Food Production, Bhubaneswar
Progress
Quantity
1
Bid Type
Two Packet Bid
Kamdhenu University, under the Agriculture And Co-operation Department Gujarat, calls for a Kjeldahl Digestion Cum Distillation Assembly Unit (Classic Type) in Jamnagar, Gujarat (360510). Estimated value: ₹150,000. The procurement scope includes a complete digestion/distillation setup with required stands, fume hood, essential and optional accessories, and a warranty for the complete unit and accessories. The tender allows a quantity variation up to 25% during contract placement and currency at contracted rates, with delivery timeline adjustments based on the option clause. The policy also provides MSE purchase preference for eligible state-based manufacturers with online verified Udyam registration. This opportunity targets suppliers capable of delivering a compliant, turnkey laboratory digestion/distillation system. Unique aspects include a buyer-specified need for test reports and conformity documentation to be provided at bidding or on demand.
Kjeldahl digestion/distillation assembly with suitable digestion/distillation stand
Heating system for digestion unit and separate heating system for distillation unit
Total heating places capacity for both units
Flask accommodation capacity (in ml) for digestion and distillation units
Maximum heating temperature for digestion unit
Condenser duct material specification
Fume hood type and suitability
Essential and optional accessories list
Warranty coverage for complete unit and accessories
Laboratory test reports validating conformity to specifications
Option clause allows ±25% quantity variation with proportional delivery extension
MSE preference for eligible state-based manufacturers with online Udyam verification
Delivery schedule depends on original vs extended delivery period and calculation method
EMD amount and exact payment method to be clarified in tender; ensure timely payments per GeM terms
Delivery period adjusted per option clause; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Standard penalties may apply for late delivery or non-conformity; refer to buyer terms and contract specifics
Manufacturer/OEM of Kjeldahl digestion/distillation equipment with online Udyam verification
GST and PAN compliant bidder with prior supply experience of lab digestion equipment
Financial capability demonstrated via audited statements or equivalent
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Kjeldahl Digestion Cum Distillation Assembly Unit (Classical Type) (Q2)
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Director,agriculture & Food Production, Bhubaneswar
Central University Of Himachal Pradesh
Council Of Scientific And Industrial Research (csir)
North Central Railway
ALLAHABAD, UTTAR PRADESH
Bihar Rural Livelihoods Promotion Society
SITAMARHI, BIHAR
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Generic | System Consists of | Digestion Unit, Distillation Unit |
| Generic | Suitable Digestion/Distillation stand provided | Yes (Provided) |
| Generic | Digestion/Distillation unit stand base material | Powder Coated Mild Steel |
| Performance Parameter of Kjeldahl Digestion Unit | Heating System (Digestion Unit) Type | Heating Mantle |
| Performance Parameter of Kjeldahl Digestion Unit | Total Heating Places (Digestion Unit) | 6 |
| Performance Parameter of Kjeldahl Digestion Unit | Capacity of Flask can be accommodated (Digestion Unit) (in ml) | 250, 500 |
| Performance Parameter of Kjeldahl Digestion Unit | Maximum Heating Temperature (Digestion Unit) | 200 Deg C or better |
| Performance Parameter of Kjeldahl Distillation Unit | Heating System (Distillation Unit) | Heating Mantle |
| Performance Parameter of Kjeldahl Distillation Unit | Total Heating Places (Distillation Unit) | 6 |
| Performance Parameter of Kjeldahl Distillation Unit | Capacity of Flask can be accommodated(Distillation Unit) (in ml) | 250, 500 |
| Performance Parameter of Kjeldahl Distillation Unit | Condenser Duct Material | Chemical-resistant CPVC fume manifold with heat-resistant PTFE nipples |
| Performance Parameter of Fume Hood | Suitable Fume Hood Provided | Yes, No |
| Performance Parameter of Fume Hood | Type of Fume Hood | NA (Fume Hood not Provided) |
| Buyer Specific Requirement & Features | Essential Accessories | All Connecting Hoses, Vertical & Horizontal Rods |
| Buyer Specific Requirement & Features | Optional Accessories | Clamps |
| Buyer Specific Requirement & Features | Features | Separate Temperature controller for each heating place, Each heater can be adjusted individually, Light Indicator for each heating Place |
| Warranty | Warranty (Complete Unit) | 1 Year, 2 Year Or higher |
| Warranty | Warranty (Accessories) | 1 Year |
| Test Report | Type of lab which carried out Test of Complete Product to prove the conformity of product as per specification | OEM |
| Test Report | Agree to provide all relevant documents Test Report/supporting document /reports etc to the buyer at the time of bidding or on demand | Yes |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar Kjeldahl equipment supply
Financial statements (audited if available)
EMD documents (as per tender terms)
Technical bid documents showing compliance with specifications
OEM authorization or manufacturer proof of ownership
Test reports or conformity certificates from recognized labs
Extended Deadline
20-Jan-2026, 12:00 pm
Opening Date
20-Jan-2026, 12:30 pm
Key insights about GUJARAT tender market
Bidders must submit GST, PAN, experience certificates, financials, EMD as specified, OEM authorizations, and test reports. Ensure the equipment conforms to the listed specifications and provides conformity documentation at bid or on demand. The process follows Kamdhenu University GeM procurement rules.
Required documents include GST registration, PAN card, experience certificates for similar equipment, audited financial statements, EMD submission, technical bid detailing conformity to specifications, OEM authorization, and lab test reports validating performance and safety of the digestion/distillation assembly.
The contract allows up to a 25% increase or decrease in quantity, with extended delivery time calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days. Delivery schedule aligns with bid terms and may adjust during currency of contract.
MSE preference is available to state-based manufacturers with valid Udyam Registration online. Bidder must be the OEM/manufacturer of the offered product to qualify, otherwise resellers are ineligible for preference under the policy.
Key specs include digestion/distillation stands, heating systems for both units, flask capacity in ml, maximum digestion temperature, condenser duct material, and a suitable fume hood. The bid requires essential and optional accessories and a complete unit warranty with conformity test reports.
Warranty covers the complete unit and all accessories; bidders must provide warranty terms and confirm availability of after-sales support and required spares. Test reports and conformity proofs must be provided with bid and upon demand.
Agreed test reports from an approved laboratory validating conformance to listed specifications are mandatory. The bidder must provide these reports at bidding or on demand to demonstrate compliance with performance and safety standards.
Conformity requirements are stated in the tender's technical specifications: digestion/distillation assembly, heating systems, flask capacities, condenser material, fume hood type, accessories, and warranty. Ensure all reports and documentation reflect these exact parameters before submission.
Bhagalpur District Panchayats
📍 BHAGALPUR, BIHAR
Bhagalpur District Panchayats
📍 BHAGALPUR, BIHAR
Bhagalpur District Panchayats
📍 BHAGALPUR, BIHAR
Deputy Conservator Of Forests Sf Division Rajkot
📍 RAJKOT, GUJARAT
Chief Conservator Of Forest Kachchh Circle
📍 KACHCHH, GUJARAT
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS