Bus Stop Shelter
Urban Development And Housing Department
NALANDA, BIHAR
Progress
Quantity
10
Bid Type
Two Packet Bid
The procuring organization is the Urban Development and Housing Department Bihar. The tender seeks procurement and deployment of Bus Stop Shelter solutions under the department’s urban infrastructure program. The bid includes Supply, Installation, Testing and Commissioning of the shelters, with an EMD of ₹100,000. A key feature is the option to increase or decrease quantity by up to 25%, with extended delivery timelines calculated relative to the original order. The contract emphasizes design conformity via approved Detailed Design Drawings and notes a potential schedule shift if drawing approvals are delayed. This opportunity targets vendors capable of turnkey delivery and robust project rollout within municipal settings, with bid eligibility anchored to financial health and non-liquidation status. Unique elements include the option clause on quantity, mandatory drawing approvals, and a three-year turnover consideration for both bidder and OEM.
Scope: Bus stop shelters with supply, installation, testing and commissioning
EMD: ₹100,000
Quantity variation: ±25% at time of placement and during currency
Design approvals: Detailed Design Drawings due within 5 days of award; approval or modification list within 5 days
Delivery: Calculated extension formula with minimum 30 days
Turnover: Three-year average turnover required for bidder and OEM
Quantity may vary up to 25% during contract; delivery adjusts accordingly
Drawings approval required within 5 days of award; delays shift delivery without LD
Bidder and OEM turnover must meet minimum three-year average thresholds
Not specified in provided data
Delivery period adjusts with option quantity; minimum 30 days for extension
Not specified in provided data
Not under liquidation, court receivership, or similar proceedings
Demonstrated turnover (last 3 years) for bidder and OEM
Capability to supply, install, test and commission bus stop shelters
Urban Development And Housing Department
NALANDA, BIHAR
Urban Development And Housing Department
BUXAR, BIHAR
Urban Development And Housing Department
MADHEPURA, BIHAR
Urban Development And Housing Department
KATIHAR, BIHAR
Urban Development And Housing Department
PURNIA, BIHAR
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited financial statements for three years or CA/Cost Accountant certificate showing turnover
Turnover certification for OEM if applicable
Undertaking of non-liquidation or similar proceeding
Detailed Design Drawings submission within 5 days of award
Proof of capability for supply, installation, testing and commissioning
Any OEM authorization or manufacturer certification (if applicable)
Key insights about BIHAR tender market
Bidders must provide GST, PAN, and turnover evidence for three years, along with EMD ₹100,000. Submit Detailed Design Drawings within 5 days of award and await buyer approval within 5 days. Ensure non-liquidation status and compliance with required scope: supply, installation, testing, and commissioning.
Required documents include GST certificate, PAN, three-year turnover evidence (audited or CA certificate), non-liquidation undertaking, OEM authorizations if applicable, and Detailed Design Drawings. Attach EMD receipt and proof of capability for supply, installation, testing, and commissioning.
The bid requires an EMD of ₹100,000 to participate. Ensure the payment method aligns with tender terms and attach the EMD proof with the technical bid for eligibility.
The purchaser may modify quantity by up to ±25% at award and during the contract, with delivery time adjusted by the formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Submit Detailed Design Drawings within 5 days of award. The buyer will approve or list modifications within another 5 days. Deliveries must align with approved drawings; delays by the buyer may shift delivery without LD.
Bidders must show minimum average annual turnover over the last three years ending 31st March; provide audited balance sheets or CA/Cost Accountant certificate. OEM turnover must meet the specified threshold for the offered product.
The scope includes Supply, Installation, Testing and Commissioning of bus stop shelters, ensuring turnkey delivery from design to operation under the contract.
Penalties or LD terms are not detailed in the provided data; the option clause and drawing approval delays imply risk of schedule shifts. Bidders should seek explicit LD or performance bond terms during clarification.
Access all tender documents at no cost
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS