Tender Overview
The Indian Air Force, Department Of Military Affairs, invites bids for Reciprocating Air Compressors - Electric Motor Driven (Q2) in CHANDIGARH, CHANDIGARH 160001. Tender involves procurement of compressor units with ISI marking, star rating, specified duty cycle, and multiple pressure/purity metrics. The BOQ shows no items listed, and estimated value/EMD are not disclosed in the available data. A key differentiator is alignment with IS 550/IS standards and warranty expectations for the complete compressor system. The buyerβs option clause allows quantity adjustments up to Β±25% during and after contract award, with delivery timing linked to the last order date. Unique terms include extended delivery calculations and minimum 30-day additional time, if applicable.
Technical Specifications & Requirements
- Category: STANDARD β Type of Compressor; Category: GENERIC β ISI Marked status; Availability of Star Rating; Duty Cycle; Number of Stages; Prime Mover power supply and type; Rated Discharge Pressure; Guaranteed FAD at rated pressure (CFM); Air purity classes for particles, humidity/liquid water, and total oil; Air Receiver layout and minimum capacity (Liters); Provision of cooler; Operating temperature range; Warranty duration for complete compressor system.
- Certifications/Standards: ISI marking verification; IS 550 compliance expectations; warranty terms to be specified.
- Performance/Dimensions: FAD and pressure ratings to be provided by bidder; air receiver and cooler configuration to meet system purity and reliability requirements.
- Operating environment: Minimum/Maximum operating temperatures to be observed; ensure compatibility with field conditions at CHANDIGARH site.
Terms, Conditions & Eligibility
- Delivery-time flexibility: Quantity can adjust Β±25%; extended delivery period rules apply with calculated additional time based on proportion of quantity.
- Payment/EMD: EMD not disclosed in available data; bidders should anticipate standard government tender practices and prepare accordingly.
- Documentation: ATC file uploaded by buyer; verify GST, PAN, prior experience, and OEM authorizations per T&C.
- Warranty: Warranty on complete compressor system expected; exact years to be confirmed in ATC.
- Compliance: Bidders must comply with all Buyer Added Terms and potential delivery-extension provisions; ensure ability to meet expanded quantity and extended timelines if invoked.