Self - Contained Drinking Water Coolers (V3) as per IS 1475
Rail Coach Factory Kapurthala
KAPURTHALA, PUNJAB
Progress
Quantity
1
Bid Type
Two Packet Bid
Rural Development Department Bihar seeks supply of Self-Contained Drinking Water Coolers (V3) as per IS 1475 in 2025. Tender scope references a variable quantity with a permissible fluctuation of up to 25% at contract award and during the contract period at the contracted rates. The tender emphasizes complete cooler sets, and requires documentation listed in ATC. Location: Bihar, India with no explicit start/end dates published. The procurement emphasizes compliance with approved standards and brand/warranty declarations, plus local content considerations. The unique clause supports scalable ordering and extended delivery windows, ensuring continuity of water supply across rural applications. The tender includes mandatory technical and commercial documentation as part of bid submission and mandates ISO/IS standards compliance.
Product/service names: Self-Contained Drinking Water Coolers (V3) as per IS 1475
Standards: IS 1475, ISO 9001:2015, UDYAM, GST compliance
Quantities: Quantity may vary up to 25% at contract award and during currency
Delivery: Extended delivery period calculations; minimum 30 days for added time
Warranty/Support: Brand and warranty declaration required; service support details
Documentation: Full ATC list including bank letter, turnover, GST returns, GST clearance, PAN, declarations
OEM/Brand: OEM authorizations and brand declarations to be submitted
Quantity fluctuation up to 25% at contract sign and during contract
Delivery period adjustments based on added quantity with minimum 30 days
Mandatory IS 1475 compliance with IS 9001:2015 and UDYAM/GST requirements
Payment terms are not disclosed in the tender data; bidders should await contractual terms in the main agreement.
Delivery period starts from the last date of original delivery order; extended period applies with calculated time.
New time = (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Penalties not explicitly stated; standard procurement penalties may apply per contract terms.
Experience in supplying drinking water cooling equipment
Compliance with IS 1475 and ISO 9001:2015
GST registration and filing history (last 3 GST returns)
Rail Coach Factory Kapurthala
KAPURTHALA, PUNJAB
Odisha Power Generation Corporation Limited
JHARSUGUDA, ODISHA
Konkan Railway Corporation Limited
MUMBAI, MAHARASHTRA
Food Corporation Of India (fci)
GAUTAM BUDDHA NAGAR, UTTAR PRADESH
Southern Railway
THIRUVANANTHAPURAM, KERALA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates (last 3 years)
Balance sheet and Profit & Loss statement
GST returns (last 3)
Non-liquidation letter from bank
Service support telephonic number
ISO 9001:2015 certificate
UDYAM registration
GST clearance certificate
Brand and warranty declaration
Turnover certificate approved by CA
Self declaration for tender specifications
Local content declaration
Same work order copy in GEM (3 year)
Key insights about BIHAR tender market
To bid, ensure IS 1475 compliance, ISO 9001:2015, UDYAM, and GST certificates are ready. Prepare bank letter, turnover statements, P&L, GST returns, GST clearance, PAN, and local content declarations. Include OEM authorization and brand/warranty declarations, plus self-declaration confirming tender specifications.
Submit GST certificate, last 3 GST returns, GST clearance, PAN card, turnover certificates, bank non-liquidation letter, balance sheet, P&L, ISO 9001:2015, UDYAM, service support contact, brand/warranty declaration, and local content declarations along with work order copies.
Mandatory standards include IS 1475 for V3 coolers, ISO 9001:2015, UDYAM registration, GST compliance, and brand/warranty declarations. OEM authorizations may be required to prove product authenticity and warranty coverage.
The purchaser may increase or decrease quantity up to 25% of bid/contract quantity. Extended delivery is calculated as ((Increased quantity ÷ Original quantity) × Original delivery period) with a minimum of 30 days.
Delivery timelines shift from the last date of the original delivery order; if extended, use the formula above, ensuring a minimum 30 days for added time and possible extension up to original delivery period.
Bidders must submit declarations confirming local content compliance and brand/warranty terms, including the OEM/brand authorization and warranty period as per IS 1475 compliant cooling units.
Provide CA-approved turnover certificates, Balance Sheet, P&L statements for the last three years, bank letters, and GST compliance documents to demonstrate financial viability and bidding capability.
ATC details are located in the tender terms; bidders should prepare all documents listed (bank letter, turnover, GST, declarations) and ensure ISO 9001 and IS 1475 compliance before submission via the GEM portal.
Rail Coach Factory Kapurthala
📍 KAPURTHALA, PUNJAB
Rail Coach Factory Kapurthala
📍 KAPURTHALA, PUNJAB
Kandla Port Trust
📍 KACHCHH, GUJARAT
Rourkela Steel Plant
📍 SUNDERGARH, ODISHA
N/a
📍 HARDOI, UTTAR PRADESH
Access all tender documents at no cost
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS