Tender Overview
Rourkela Steel Plant, part of Steel Authority of India Limited, seeks supply of complete gear and pinion assemblies, spiral bevel, helical gears, and differential box components for the Lance differential drive gearboxes in Conv 1&2 Lances. The scope includes multiple pinion shafts, helical gears, and output shafts as per DRAWING NO PD/R-227424. No explicit quantity or estimated value is stated, but the scope is tied to single-source, L-1 award with option to increase up to 25% during contract. Location is Sundergarh, Odisha. Key differentiator includes strict material conformity, third-party inspection, and bearing brand controls. Tender demands BOM alignment with drawings and manufacturing in assembled condition, with on-site technical clarifications within 15 days of PO. Overall emphasis on OEM-quality, precise heat treatment, and alignment with the indented department approvals.
Technical Specifications & Requirements
- Product categories: gear and pinion sets, spiral bevel gears, helical gears, complete output shaft assemblies for Lance differential gearboxes.
- Standards & certifications: required heat treatment and UST per drawings; third-party inspection before dispatch; materials to be SKF/ FAG/ NTN/ TIMKEN/ NSK bearings only; MOC to match drawings; guarantee and material test certificates.
- Inspection: third-party at supplier premises; LLoyds/A.H.Knight/ Griffith/ SGS/TUV inspections cost borne by supplier; site visit within 15 days of PO for clarifications; delivery within 120 days after PO; drawings and QAP approvals due within 40 days of PO.
- Delivery & quality: assembled condition delivery; verify bearings with SMS-II/RSP clearance; ensure MOC per specifications.
- Other: option clause allows up to 25% quantity variation; GST as applicable; single-source order on L-1 basis.
Terms, Conditions & Eligibility
- EMD/GST: Bidder to verify GST applicability; reimbursement as per actuals; no explicit EMD amount stated.
- Delivery timeline: material supply within 120 days of PO; delivery period extensions governed by 25% quantity option with minimum 30 days.
- Documentation: guarantee certificate, material test certificate, bearing procurement evidence; QAP and drawings to be approved within 40 days; third-party inspection certificates required.
- Acceptance: only OEM bearings; inspection by third-party agencies named; on-site technical discussions within 15 days of PO; single-source order on overall L-1 basis.