Tender Overview
Organization: Instrumentation Limited (Department of Heavy Industry) seeks procurement of End Mill HSS Short Rough Diameter: 16 MM 8% COBALT. Eligible make options include ADDISON / YG1 / TOTEM. No BOQ items or quantity data are provided in the available tender data. The opportunity references a standard option clause for quantity variation and extension, with a flexible delivery timeline tied to the original delivery period. The procurement scope appears to cover high-speed steel roughing end mills with cobalt content, aimed at precision machining applications. The tender data emphasizes brand options and delivery mechanics rather than a fixed quantity, signaling a flexible supply contract subject to order variation.
Technical Specifications & Requirements
- Product category/name: End Mill HSS Short Rough, diameter 16 MM, cobalt content 8%.
- Make/brands accepted: ADDISON, YG1, TOTEM.
- Key data points: high-speed steel end mills with 8% cobalt for enhanced wear resistance; no explicit length, flute count, coating, or shank size specified in the available data.
- Standards/quality: no specific standards listed; bidders should anticipate standard HSS tooling specs and OEM approvals.
- Terms affecting delivery: option clause allows up to 25% quantity variation; delivery period must align with last delivery order date and minimum 30 days extension rules.
- Delivery/installation scope: data not provided; bidders should prepare for standard surface machining tools supply and potential field delivery.
Terms & Eligibility
- EMD/security: Amount not disclosed in the provided tender data.
- Delivery timelines: extension rules trigger from the last date of the original (or extended) delivery period with a minimum of 30 days.
- Quantitative flexibility: purchaser may increase quantity up to 25% during contract; rates remain contracted.
- Submission requirements: bidders must comply with the option clause and provide OEM authorizations and typical bid documents (GST, PAN, financials, experience).
- Data gaps: lack of BOQ, start/end dates; bidders should seek clarification for precise quantities and delivery windows.