ARMATURE ASSY,SELF PINOIN,ARMATURE ASSY 24V,FIELD COIL ASSY,SOLENOID SWITCH,SELF PINION,BRUSH PLATE
Indian Army
LEH, JAMMU & KASHMIR
Progress
Quantity
140
Category
Field Coil
Bid Type
Two Packet Bid
Product/service: 28 item BOQ scope for field components
Quantities: Not explicitly provided for each item; total items 28
Estimated value: ₹115,000
Experience: Local dealer performance emphasized
Quality/Compliance: Original Item requirement; on-site installation
Warranty: 3 years minimum
Option clause allows up to 25% quantity variation during contract
Minimum warranty period of 3 years required
Original item mandated; items to be installed on site
Local dealer performance is a critical eligibility criterion
EMD and payment terms require confirmation from procurement
Not explicitly detailed; bidders should obtain clarity on advance and milestone payments per contract
Delivery period tied to option clause; final timelines defined at contract award with minimum delivery extensions
Not specified in data; verify LD terms during bid clarification
Must meet original item requirement and on-site installation capability
Must demonstrate local dealer performance in BID
Must have financial capacity to support ₹115,000 estimated value
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
DARJEELING, WEST BENGAL
Indian Army
LUCKNOW, UTTAR PRADESH
Indian Army
SONITPUR, ASSAM
Indian Army
DARJEELING, WEST BENGAL
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Field Coil | Field Coil | 1 | nos | [email protected] | 15 |
| 2 | Self Armature | Self Armature | 1 | nos | [email protected] | 15 |
| 3 | Self Pinion | Self Pinion | 1 | nos | [email protected] | 15 |
| 4 | Self Solenoid | Self Solenoid | 3 | nos | [email protected] | 15 |
| 5 | Brush Carrier Plate | Brush Carrier Plate | 1 | nos | [email protected] | 15 |
| 6 | Plunger | Plunger | 1 | nos | [email protected] | 15 |
| 7 | Speed Sensor | Speed Sensor | 1 | nos | [email protected] | 15 |
| 8 | Clutch Cyl Assy | Clutch Cyl Assy | 1 | nos | [email protected] | 15 |
| 9 | Hose | Hose | 5 | nos | [email protected] | 15 |
| 10 | Clutch Plate | Clutch Plate | 1 | nos | [email protected] | 15 |
| 11 | Pressure Plate | Pressure Plate | 1 | nos | [email protected] | 15 |
| 12 | Clutch Bearing | Clutch Bearing | 1 | nos | [email protected] | 15 |
| 13 | Air CleanerHose | Air CleanerHose | 1 | nos | [email protected] | 15 |
| 14 | Door Lock Assy | Door Lock Assy | 1 | nos | [email protected] | 15 |
| 15 | Bearing | Bearing | 1 | nos | [email protected] | 15 |
| 16 | Acc Cable | Acc Cable | 1 | nos | [email protected] | 15 |
| 17 | System Protection Valve Rep Kit | System Protection Valve Rep Kit | 1 | nos | [email protected] | 15 |
| 18 | Fan Belt | Fan Belt | 4 | nos | [email protected] | 15 |
| 19 | Top Light Assy | Top Light Assy | 1 | nos | [email protected] | 15 |
| 20 | Rectifire Plate | Rectifire Plate | 1 | nos | [email protected] | 15 |
| 21 | Fuse | Fuse | 100 | nos | [email protected] | 15 |
| 22 | Regulator | Regulator | 1 | nos | [email protected] | 15 |
| 23 | Solenoid Switch | Solenoid Switch | 1 | nos | [email protected] | 15 |
| 24 | Self Pinion | Self Pinion | 2 | nos | [email protected] | 15 |
| 25 | Self Armature | Self Armature | 1 | nos | [email protected] | 15 |
| 26 | Field Coil | Field Coil | 2 | nos | [email protected] | 15 |
| 27 | Self Armature Cap | Self Armature Cap | 1 | nos | [email protected] | 15 |
| 28 | Air Cleaner Hose | Air Cleaner Hose | 3 | nos | [email protected] | 15 |
Discover companies most likely to bid on this tender
- GST certificate
- PAN card
- Experience certificates (related to field components or military procurement)
- Financial statements illustrating capability to support ₹115,000 estimated value
- EMD/Security deposit details (not specified—confirm in T&C)
- Technical bid documents showing compliance with 'Original Item' requirement
- OEM authorizations or import certifications if applicable
- On-site installation capability proof or deployment plan
Key insights about RAJASTHAN tender market
Bidders must submit documents confirming Original Item compliance, on-site installation capabilities, and local dealer performance. The tender has an estimated value of ₹115,000 with a 28-item BOQ. Ensure warranty is at least 3 years and verify EMD details in the terms; prepare installation plan and logistics for site delivery.
Required submissions include GST certificate, PAN card, experience certificates, financial statements, and OEM authorization if applicable. Also provide technical bid demonstrating Original Item compliance, and proof of on-site installation capability with a deployment plan for the Bikaner site.
The tender lists 28 items with many entries N/A; emphasis is on Original Item and on-site installation. The estimated value is ₹115,000; bidders should prepare for a range of mechanical and electrical components with strict OEM authenticity and site installation requirements.
Delivery schedule is governed by the option clause allowing up to 25% quantity variation. Final delivery timelines will be confirmed at contract award; minimum delivery extensions consider a standard extension approach, ensuring on-site installation at the Indian Army facility.
Payment terms are not explicitly stated in the data; bidders should seek clarification. Typical terms may involve milestone or post-delivery payment after on-site installation, with allowances for contingencies tied to the 28-item BOQ and adherence to Original Item requirements.
EMD details are not specified in the provided data; verify with the procuring authority. Eligibility hinges on Original Item compliance, on-site installation capability, and demonstrable local dealer performance in the Rajasthan region.
Provide a deployment plan and resources for on-site installation at the Bikaner facility, including technician qualifications, equipment, and timelines. Demonstrate prior on-site installation experience for field components and ensure all 28 items can be integrated at the site.
The option clause permits increasing order quantity by up to 25% during contract execution, with adjusted delivery time calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days. This affects pricing, supply planning, and storage readiness.
Access all tender documents at no cost
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS