GEM

Greyhounds Andhra Pradesh polyurethane athletic track sub base tender Andhra Pradesh 2025

Posted

29 Oct 2025, 04:12 pm

Deadline

13 Nov 2025, 05:00 pm

Progress

Issue29 Oct 2025, 04:12 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Key Highlights

  • Brand/OEM requirement: 3-year govt/PSU supply experience required
  • Technical standards: IS or ISO standards not specified in data, but invoicing to GSTIN essential
  • Special clauses: 25% quantity option during and after contract; delivery period rules specified
  • Eligibility: Govt procurement experience in similar category highly emphasized
  • Warranty/AMC: Not specified in data; termination rights for non-performance implied
  • Penalties: Termination rights for late delivery or non-compliance
  • Delivery: Option-driven quantity adjustments and delivery period linkage to original order date
  • Installation scope: Sub base material and installation for polyurethane track surfaces
  • No BOQ: Future orders will define concrete quantities and technical specs

Categories 1

Tender Overview

The procurement is issued by Greyhounds Andhra Pradesh under the Home Department Andhra Pradesh for the supply and installation of polyurethane athletic track sub base material. The scope centers on procuring track sub base components and installing them to meet field performance needs within Andhra Pradesh. Although the BOQ shows no items, the contract governs quantity adjustment up to 25% during order placement and currency, with delivery periods tied to the original order date. Bidders should align with the stated option clause and the overall contract framework to manage variations in demand and delivery timelines. The emphasis on government-grade procurement signals compliance, traceability, and auditability for the selected vendor.

This tender highlights the need for suppliers capable of delivering material and installation services in a public-sector framework, with emphasis on reliability, timely delivery, and adherence to contract terms. The absence of explicit BOQ items suggests a framework or master agreement model, where subsequent purchase orders will specify exact quantities. Unique aspects include the option to scale quantities by up to 25% and the necessity to maintain compliance with invoicing in the consignee’s GSTIN. The procurement targets vendors with demonstrated capability in government projects and a track record of timely execution in related track or sports infrastructure projects.

Technical Specifications & Requirements

There are no detailed technical specifications in the provided data. Key information available includes the procurement category (polyurethane athletic track sub base material and installation) and the option clause allowing quantity variation up to 25%. The terms require the supplier to submit contracts proving 3 years of regular supply to Central/State Govt Organizations or PSUs, and to ensure invoicing is issued in the consignee’s GSTIN. Sub-contracting and assignment rules, as well as termination rights for non-compliance or delivery failure, are clearly outlined. The absence of a BOQ means that future orders will define technical and installation requirements. Compliance with the general terms, and demonstrated government project experience, becomes pivotal for qualification.

Terms, Conditions & Eligibility

  • Option Clause: Quantity may be increased/decreased by up to 25% during contract and currency, with delivery extension rules.
  • Experience Criteria: Bidder or OEM must have 3 years of regular supply to Central/State Govt Organizations or PSUs; provide contract copies as evidence.
  • Invoice Condition: Invoices must be raised in the name of the Consignee with the Consignee’s GSTIN.
  • Assignment/Sub-contracting: No assignment or sub-contracting without prior written consent; joint liability remains with seller.
  • Termination Triggers: Non-compliance, delivery failure, insolvency, or assignment events may lead to contract termination.

Key Specifications

  • Product/service names: polyurethane athletic track sub base material and installation

  • Quantities: Not specified (to be defined in future purchase orders under 25% variation)

  • EMD/Estimated value: Not specified

  • Experience: 3 years govt/PSU supply in related category

  • Quality/standards: Not explicitly specified in tender data

  • Delivery/Installation: Based on original order date; extension rules apply per option clause

Terms & Conditions

  • Option Clause allows ±25% quantity change during contract and currency

  • 3 years govt/PSU supply experience required with contract evidence

  • Invoices must be issued in consignee name with GSTIN

  • No assignment/sub-contracting without buyer’s written consent

  • Termination rights for non-compliance or delivery failure

Important Clauses

Payment Terms

Invoices must be raised in the consignee's name with the consignee's GSTIN; no explicit payment schedule provided in data.

Delivery Schedule

Delivery period tied to the last date of the original delivery order; additional time computed as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.

Penalties/Liquidated Damages

Buyer may terminate for non-compliance, failure to deliver, or insolvency; specific LD rate not provided in data.

Bidder Eligibility

  • 3 years of regular govt/PSU-supplied experience in polyurethane track or related infrastructure

  • Evidence through contract copies for each year of the last three years

  • GSTIN-compatible invoicing and financial capability documentation

AI-Powered Bidder Prediction

Companies most likely to bid

Unlock Bidder Insights

AI predictions on likely bidders

Required Documents

1

GST registration certificate of bidder and, if applicable, OEM

2

PAN card of bidder

3

Experience certificates showing 3 years of govt/PSU supply in similar category

4

Contracts/PO copies from Central or State Govt Organizations or PSUs

5

Financial statements or turnover evidence demonstrating financial capability

6

Technical compliance certificates or prior installation work related to polyurethane track

7

OEM authorizations or reseller agreements (if bidding through an OEM)

Frequently Asked Questions

How to bid on polyurethane track sub base tender in Andhra Pradesh 2025?

Submit GSTIN-based invoicing, confirm 3 years of govt/PSU supply experience with contract copies, provide OEM authorizations if applicable, and ensure compliance with the 25% quantity option during contract. Include evidence of past installation work and financial capability; follow the terms on assignment and termination clearly.

What documents are required for the Andhra Pradesh track tender bid 2025?

Prepare GST registration certificate, PAN card, 3-year govt/PSU supply contracts with copies, turnover/financial statements, OEM authorizations, and any polyurethane track installation certifications. Ensure all documents demonstrate ability to meet consignee GSTIN invoicing and contract compliance.

What are the delivery terms for the AP polyurethane track project?

Delivery timing aligns with the last date of the original delivery order; additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Extensions may apply to meet the overall contract period.

What is required to prove govt procurement experience for this AP tender?

Provide contract copies showing supply to Central/State Govt Organizations or PSUs for three consecutive years, with the primary product value meeting the criterion in bunch bids. These documents establish eligibility for the track sub base procurement.

What is the invoicing requirement for this track installation tender?

Invoices must be raised in the name of the Consignee and include the Consignee’s GSTIN. This ensures proper tax compliance and payment processing under govt procurement terms.

What happens if a bidder fails to deliver track materials on time?

The buyer can terminate the contract for non-delivery, non-compliance, or insolvency. The terms allow remedies including price adjustments or contract termination, so bidders must maintain timely delivery and replacement of defective materials.

Are subcontracting and assignment allowed in the AP track tender?

Sub-contracting or assignment requires prior written consent from the buyer. Even with consent, the original seller remains jointly and severally liable for performance and obligations under the contract.

What performance or quality standards are specified for this track project?

The tender data does not specify concrete standards; bidders should demonstrate prior govt installation in similar track sub base projects and ensure compliance with general procurement terms, GST invoicing, and reliable delivery, leveraging 3-year govt experience as evidence.