Hot Rolled Steel Beam, Column, Channel and Angle Sections (V2) conforming to IS 808,Hot Rolled Stee
Munitions India Limited
BALANGIR, ODISHA
Bid Publish Date
21-Nov-2025, 9:24 am
Bid End Date
01-Dec-2025, 12:00 pm
Bid Opening Date
01-Dec-2025, 12:30 pm
Location
Progress
Quantity
75
Category
Hot Rolled Steel Beam, Column, Channel and Angle Sections (V2) conforming to IS 808
Bid Type
Two Packet Bid
Bharat Heavy Electricals Limited (BHEL) invites bids for the procurement of Hot Rolled Steel Beam, Column, Channel and Angle Sections conforming to IS 808 (Q3). The scope is supply-only, with an estimated contract value not disclosed and no BOQ items listed. BHEL requires inclusion of a Material Test Certificate and stresses that GST will be applied per applicable rates. The event includes an option clause for quantity adjustments up to 25%, with procurement at contracted rates and delivery timing tied to the last delivery order date. A strong emphasis on compliance, transportation, and site delivery is noted.
Product: Hot Rolled Steel Beam, Column, Channel and Angle Sections
Standard: IS 808 (Q3) compliant
Delivery: Site delivery included; unloading by vendor
Certification: Material Test Certificate mandatory with supply
Payment: 60 days usance LC from document submission
LD: 0.5% per week, max 5% of contract value
Quantity adjustment up to 25% during/after contract
Materials must include Material Test Certificate
60-day LC payment terms; GST as applicable
Delivery to site; unloading by vendor; transit insurance
LD 0.5% weekly for delays; max 5%
60 days of usance LC from date of submission of documents at beneficiary bank
Delivery aligned to original delivery order date; option-based quantity adjustments up to 25%
0.5% of contract value per week for delayed quantity, capped at 5%
Proven experience in supplying hot rolled steel sections conforming to IS 808
Financial capacity to sustain LC-based payments
Ability to provide Material Test Certificate with each supply and unload at site
Munitions India Limited
BALANGIR, ODISHA
Nuclear Power Corporation Of India Limited
THANE, MAHARASHTRA
Bharat Heavy Electricals Limited (bhel)
JHANSI, UTTAR PRADESH
Nuclear Power Corporation Of India Limited
CHITTORGARH, RAJASTHAN
Tripura State Electricity Corporation Limited
WEST TRIPURA, TRIPURA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for steel sections supply
Financial statements or bankers' certificate
Material Test Certificate for supplied steel
OEM/Manufacturer authorization (if applicable)
Technical bid documents and any ATC/Corrigendum certificates
Transit insurance proof and GST compliance documents
Key insights about TAMIL NADU tender market
Bidders must meet IS 808 (Q3) compliance, submit Material Test Certificate, GST details, PAN/GST, and financials, and arrange LC-based payment terms. Ensure unloading responsibility and site delivery are addressed, with LD terms of 0.5% weekly up to 5%. Include OEM authorizations if applicable.
Required documents include GST registration, PAN, financial statements, experience certificates for steel supply, Material Test Certificate, OEM authorization if needed, and technical bid documents plus ATC/Corrigendum certificates. Ensure certificates accompany bid submission as per terms.
Delivery is site-based with unloading by vendor. Payment terms are 60 days LC from document submission. Quantity may increase up to 25% during contract; LD applies for delays at 0.5% per week, capped at 5% of contract value.
The procurement requires IS 808 (Q3) compliant hot rolled steel beams, columns, channels and angles. Vendors must supply Material Test Certificates and ensure conformity to IS 808 specifications, with site delivery and proper transit insurance managed by the vendor.
Bidders should expect 60 days of usance LC starting from document submission at the beneficiary bank. Ensure that relevant GST treatment is calculated per actuals or the lower applicable rate, and include transit and unloading costs in the bid price as specified.
Late delivery incurs 0.5% of contract value per week or part thereof, with a maximum of 5% of contract value. The LD applies to the delayed quantity, ensuring penalties are calculated from contract value and weeks of delay.
No. Unloading is explicitly stated to be under BHEL scope, while the price quoted by the vendor must be exclusive of unloading charges. Vendors must quote separate unloading costs in their financial bid where required.
Directorate Of Purchase And Stores
📍 KHAMMAM, TELANGANA
Northern Railway
📍 GHAZIABAD, UTTAR PRADESH
Access all tender documents at no cost
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS