COMPLETE OVERHAULING OF ROTARY PUMP ASSY
Indian Army
UDHAMPUR, JAMMU & KASHMIR
Bid Publish Date
20-Nov-2025, 10:15 am
Bid End Date
01-Dec-2025, 11:00 am
Bid Opening Date
01-Dec-2025, 11:30 am
Location
Progress
Quantity
3
Category
Overhauling of Rotary Pump
Bid Type
Two Packet Bid
The Indian Army, Department of Military Affairs, invites bids for the Overhauling of Rotary Pump. The tender is managed under centralized Army procurement procedures with specific ATC clauses. Proposals should reflect the option clause allowing ±25% quantity variation and extended delivery timelines. A pre-bid meeting is mandated 72 hours before bid opening, and an advance sample of contracted items must be provided within 48 hours of Technical Bid opening. Past performance documentation is required to substantiate capability. MSE preferences are available for eligible bidders who are manufacturers, with the caveat that traders are excluded. This procurement targets qualified service providers capable of delivering rotary pump overhauling services in compliance with purchaser requirements and delivery terms.
Overhauling of Rotary Pump (scope undefined in data)
Advance sample requirement: at least one quantity per contracted item within 48 hours of Technical Bid opening
Past performance documents: evidence of supply of same/similar items
Pre-bid meeting: required within 72 hours of bid opening
Option clause: quantity can vary by ±25% during and after contract with calculative delivery extension
MSE preference: available to manufacturers; traders excluded
GST: bidder bears GST; reimbursement per actuals or applicable rates, whichever lower
Option Clause permits ±25% quantity change with extended delivery calculations
Advance sample delivery within 48 hours after Technical Bid opening
Pre-bid meeting required within 72 hours; past performance documentation mandatory
GST reimbursement governed by actuals or applicable lower rate; bidder bears GST obligations
Delivery period linked to original order with possible extension; additional time = (extra qty/original qty) × original period; minimum 30 days
Not specified in data; bidders should seek clarification during pre-bid
Not in liquidation, not under court receivership or bankruptcy; must upload undertaking
Manufacturer status required to claim MSE purchase preference
Past performance evidence for similar rotary pump overhauling work
Indian Army
UDHAMPUR, JAMMU & KASHMIR
Indian Army
KARGIL, JAMMU & KASHMIR
Indian Army
Indian Army
Indian Army
RAJAURI, JAMMU & KASHMIR
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Past experience certificates for similar rotary pump overhauling work
Financial statements or evidence of financial stability
Advance sample plan for contracted items (within 48 hours of Technical Bid opening)
Bidder undertaking stating not under liquidation or bankruptcy
Manufacturer authorization (for MSE preference eligibility)
Pre-bid meeting acknowledgment and any issued clarifications
Key insights about JAMMU AND KASHMIR tender market
To bid, ensure you are a registered manufacturer eligible for MSE preference, submit past performance for similar overhauling work, provide an undertaking about financial standing, and attach GST details. Include a plan for the required advance sample within 48 hours of Technical Bid opening and attend the mandatory pre-bid meeting within 72 hours of bid opening.
Required documents include GST registration, PAN, past performance certificates for similar overhauling work, financial statements, an undertaking confirming no liquidation, manufacturing authorization for MSE preference, and advance sample submission plan for contracted items within 48 hours after Technical Bid opening.
Bidder must provide at least one quantity of each contracted item as an advance sample within 48 hours of Technical Bid opening; failure to provide may lead to bid rejection per ATC conditions.
The purchaser may increase or decrease bid quantity up to 25% at contract placement and during the contract period. Delivery extension is calculated as (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
MSE preference is available to manufacturers offering the contracted rotary pump overhaul; traders are excluded. Documented evidence of manufacturing status and eligibility must be uploaded with the bid.
A mandatory pre-bid meeting must be attended within 72 hours of bid opening. Any clarifications issued during the meeting become part of the procurement terms.
Bidders must verify applicable GST; the department will reimburse GST at actuals or the applicable rate, whichever is lower, subject to the quoted GST percentage.
Delivery must align with the original delivery period; extended periods apply based on the option clause. If extended, compute time using the stated formula with a minimum 30 days, ensuring timely performance.
Access all tender documents at no cost
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS