Tender Overview
The Bhilai Steel Plant (BSP), part of Steel Authority of India Limited, invites bids for the TOTAL LADLE MANAGEMENT (TLM) steel ladle refractory set for SMS-2. The procurement comprises 15 sets on a performance guarantee basis, including ladle lining refractories (bricks, castables, mortar), working and backup casting, lining tools, and functional refractories with slide gate and purging mechanisms, plus 15 ACT application charges. The estimated delivery window is until 31.03.2026, with a minimum quote requirement of 3 sets per bidder. The procurement is conducted under options with performance guarantees and GC/TC-based acceptance. The total tender quantity is 15 sets, and evaluation is per set. The process requires compliance with attached T&C, GEM terms, and vendor ATC clauses.
Technical Specifications & Requirements
- Item codes: 7151100000000 (Ladle refractories, total ladle management basis) and 7151030008000 (application charges).
- Qty: 15 SETS of SMS-2 steel ladle refractories + 15 ACT application charges.
- Delivery period: until 31.03.2026.
- Materials include ladle lining refractories (bricks, castables, mortar) for working, safety lining, and backup casting; plus functional refractories with machine/mechanism for slide gate and purging refractories.
- Inspection/QA: material accepted against vendor GC/TC; procurement on performance guarantee; evaluated on an overall per-set basis.
- Weight and exact unit specifications are indicative; price should cover total ladle management on paid trial basis.
Terms, Conditions & Eligibility
- EMD: ₹5,00,000 (to be submitted as per tender terms).
- Eligibility: Indian manufacturer of refractories (Class-I/II local supplier per DPIIT Order P-45021/2/2017); provide GST registration, business license, ISO or govt. certification, and value addition certificate in India.
- Experience: PO experience in last five years for magnesia carbon bricks or alumina magnesia carbon bricks for steel ladles; proof via PO copies.
- Delivery terms: paid trial basis with performance guarantee; delivery as per item schedule; acceptance via GC/TC.
- Documentation: GST, PAN, experience certificates, financial statements, OEM authorizations if applicable, and technical compliance certificates.
- Penalties and warranties: as per detailed terms attached; per-set evaluation and performance guarantees apply.
- Other: minimum 3 sets must be quoted; unit weight is indicative and not a technical spec; all terms per GEM and ATC clauses.