Tender Overview
Organization: Indian Coast Guard (Department of Defence) | Product/Service: Fabrication of Tool Control tally box with tallies for centralised Tool control | Location: Port Blair, South Andaman, Andaman & Nicobar 744101 | Quantity/Value: 1 unit fabrication, inclusive delivery charges; scope includes wood packing and freight | Context: Tender calls for on-site fabrication and supply at CG Air Enclave (Port Blair) with all-cost-inclusive pricing | Differentiator: Centralised tool control integration with tallies; option clause permits ±25% quantity variation during contract term | Unique Clause: Delivery period linked to last delivery order date; extended time calculations apply with minimum 30 days; option to adjust quantities within contracted rates
Technical Specifications & Requirements
- No explicit product specifications or BOQ items provided; scope covers fabrication of a single Tool Control tally box with tallies for centralised tool control at CGAE (PBR) and delivery to Coast Guard Air Enclave, Port Blair
- Inclusions: delivery, freight, wooden packing, and all supply charges within bid price; transportation charges for round trip included
- Delivery location: Coast Guard Air Enclave (Port Blair); supplier must meet on-site fabrication and delivery responsibilities
- Compliance considerations: If specs exist, bidders should assume standard fabrication quality controls and align with centralised tool control requirements; verify compatibility with existing tallies and centralised control systems
- Experience emphasis: bidders should demonstrate capability in secure fabrication and safe packing for coastal/remote locations
- Delivery timeline: governed by option clause; minimum 30 days extension if quantity increases; final delivery aligns with consecutive delivery orders
Terms, Conditions & Eligibility
- EMD/Deposit: Not specified in available data; bidders should verify in tender documents
- Delivery Terms: Inclusive of freight and wooden packing; round-trip transport charges included
- Quantity Flexibility: Up to ±25% of bid/contract quantity during placement and currency; calculate time extension as (Increase/Original) × Original delivery period with minimum 30 days
- Payment Terms: Not specified; supplier should confirm payment terms in official bid documents
- Documentation: Likely require GST, PAN, experience certificates, financials, technical compliance; OEM/authorization may be required depending on fabrication specifics
- Warranty/Penalties: Not detailed; bidders should seek explicit terms in the contract package
- Jurisdiction/Location: Port Blair, South Andaman, Andaman & Nicobar; all logistics must address coastal access and remote delivery considerations