Bearing Frt Wheel,Cable Assy Clutch,Brush Starter,Switch Heater Fan,Gasket Oil Pump,Gasket Oil Seal
Indian Army
DARJEELING, WEST BENGAL
Bid Publish Date
26-Nov-2025, 1:30 pm
Bid End Date
06-Dec-2025, 2:00 pm
Location
Progress
Quantity
56
Category
OIL SEAL
Bid Type
Single Packet Bid
The Indian Army (Department Of Military Affairs) invites bids for a bundle of OIL SEAL, MAJOR REPAIR KIT AIR COMPRESSOR, VANE PUMP, SET OF MAIN BEARING, PUMP FUEL TRANSFER, AIR COMPRESSOR REPAIR KIT, SPIDER BEARING, and CLUTCH RELEASE BEARING. The BOQ lists 8 items with unspecified quantities and an estimated value not disclosed. Key differentiator is the option clause allowing ±25% quantity adjustments at contract award and during the currency of the contract, with delivery calculations tied to original quantities. The bidder must align with mandatory BIS/type test certificates and other product-specific approvals, as per the bid document. The procurement aims to ensure availability of critical air and fuel-handling components for military vehicles and equipment, with compliance to required standards.
Product names: OIL SEAL, MAJOR REPAIR KIT AIR COMPRESSOR, VANE PUMP, SET OF MAIN BEARING, PUMP FUEL TRANSFER, AIR COMPRESSOR REPAIR KIT, SPIDER BEARING, CLUTCH RELEASE BEARING
Quantities: 8 items in BOQ; exact quantities not disclosed
Estimated value: Not disclosed
Standards/Certification: BIS licence, type test certificate, other approvals per product spec
Delivery: Option clause allows ±25% quantity; delivery period formula: (Increased quantity ÷ Original quantity) × Original delivery period; minimum 30 days
GST: Bidder responsible for applicable GST; reimbursement as actuals or as per applicable rates, whichever is lower, within quoted GST
Eligibility: Upload mandatory certificates; no liquidation or bankruptcy; financial undertaking required
Option to adjust quantity by up to 25% during contract
Mandatory BIS licence and type test certificates required
GST applicable as per actuals and rates; bidder to determine and claim appropriately
GST handling per actuals or applicable rate; no fixed percentage stated here; ensure GST compliance and documentation
Delivery period linked to original schedule; extended time computed as (Increased quantity ÷ Original quantity) × Original delivery period with a minimum 30 days
Not specified in the provided data; verify in the main bid document and ATC for LD provisions
Not under liquidation, court receivership, or bankruptcy
Must upload financial undertaking asserting sound financial standing
Must provide BIS licence and type test certificates with bid
Indian Army
DARJEELING, WEST BENGAL
Indian Army
AMBALA, HARYANA
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Army
Indian Army
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | OIL SEAL | OIL SEAL TATA 713TC | 10 | pieces | plateaubuyer@214 | 15 |
| 2 | MAJOR REPAIR KIT AIR COMPRESSOR | MAJOR REPAIR KIT AIR COMPRESSOR TATA 713TC | 10 | pieces | plateaubuyer@214 | 15 |
| 3 | VANE PUMP | VANE PUMP TATA 713 TC | 8 | pieces | plateaubuyer@214 | 15 |
| 4 | SET OF MAIN BEARING | SET OF MAIN BEARING TATA 713 TC | 10 | pieces | plateaubuyer@214 | 15 |
| 5 | PUMP FUEL TRANSFER | PUMP FUEL TRANSFER TATA 713 TC | 2 | pieces | plateaubuyer@214 | 15 |
| 6 | AIR COMPRESSOR REPAIR KIT | AIR COMPRESSOR REPAIR KIT ALS | 4 | pieces | plateaubuyer@214 | 15 |
| 7 | SPIDER BEARING | SPIDER BEARING ALS | 6 | pieces | plateaubuyer@214 | 15 |
| 8 | CLUTCH RELEASE BEARING | CLUTCH RELEASE BEARING ALS | 6 | pieces | plateaubuyer@214 | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates (relevant to oil seals and repair kits for air compressors)
Financial statements
EMD / security deposit (as applicable per bid documents)
Technical bid documents
BIS licence
Type test certificate
OEM authorizations (if required by product specification)
Other certificates prescribed in Product Specification
Key insights about SIKKIM tender market
Bidders must submit GST, PAN, experience certificates, financial statements, EMD (if required), BIS licence, type test certificate, and OEM authorizations as prescribed. Ensure compliance with the option clause allowing ±25% quantity changes and delivery-time calculations. Follow all ATC instructions and upload required technical bid documents to participate.
Required documents include GST certificate, PAN card, experience certificates relevant to oil seals and repair kits, financial statements, EMD/security deposit, BIS licence, type test certificates, OEM authorizations, and any product-specific approvals as per the bid document.
Mandatory BIS licence and type test certificates; additional product approvals as prescribed in the Product Specification. Bidders must upload these with the bid, ensuring compliance with ISI/BIS and any project-specific standards noted in ATC.
The contract allows ±25% quantity adjustments at award and during the contract. Extended delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extensions can apply within the contract term.
Bidder pays applicable GST; the procuring agency reimburses GST as actuals or at the prevailing rate, whichever is lower, subject to the quoted GST percentage. Bidder must self-assess GST and include it in the bid price accordingly.
Suppliers must avoid liquidation or bankruptcy, provide a financial undertaking, and upload BIS/type test certificates and OEM authorizations as specified. Demonstrated capability in supplying air compressor components to defense or similar sectors is preferred.
The BOQ lists 8 items but does not disclose exact quantities in the provided data. Refer to the official bid document and annexures for precise item quantities, unit measurements, and total estimated value before submission.
The tender data notes GST handling but does not specify exact payment milestones. Check the main bid document for payment schedule (e.g., advance, milestones, or post-delivery payment) and any penalties or LD clauses.
Access all tender documents at no cost
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS