Tender Overview
The Indian Army, Department Of Military Affairs, seeks procurement of engine component sets including Connecting Rod Bearing, Thermos Washer, Crank Shaft, Oil Pump Assembly, and Oil Seal under a single tender framework. Estimated value is ₹103,925.00 with 5 items listed in the BOQ, though explicit quantities are not disclosed. Tender terms authorize a 25% quantity variation at contract award and during the contract currency at the contracted rates. A key differentiator is the mandatory establishment of a Functional Service Centre within the consignee state within 30 days of contract award, or proof of existing capability, to enable on-site/ carry-in warranty support. The tender emphasizes delivery timing tied to the original delivery order and extended periods, with a minimum extension policy. This is a government procurement opportunity with strict compliance requirements and post-award service obligations.
Technical Specifications & Requirements
- Product group: Connecting Rod Bearing, Thermos Washer, Crank Shaft, Oil Pump Assembly, Oil Seal (5 items) as per BOQ.
- Estimated contract value: ₹103,925.00; EMD details not specified.
- Delivery/extension: Option to increase quantity up to 25% of contracted quantity; extension calculations: (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
- Warranty/Service: If carry-in warranty, bidder must have a functional service centre in the state of each consignee location; if not present, centre must be established within 30 days of award; payment release contingent on documentary evidence of service capability.
- Delivery timeline: Delivery period tied to last date of the original delivery order; extended period calculations apply per option clause.
- Compliance: Bidders must strictly comply with the option clause terms and provide evidence of service coverage.
Terms, Conditions & Eligibility
- EMD: Not specified in available data.
- Service Centre: Mandatory functional service centre in consignee state; if absent, establish within 30 days post-award; payment released after submission of service centre evidence.
- Quantity variation: Up to 25% increase in order quantity during contract; delivery period adjustments consistent with original delivery time, subject to a minimum of 30 days.
- Purpose: Government defence procurement with stringent post-sale support requirements; bidders must comply with ATC terms and maintain serviceability across consignee locations.