BEARING ASSY FRONT,GLASS WIND SHIELD,OIL SEAL,SPEEDO SENSOR,AIR FILTER ELEMENT,KIT FUEL PRE FILTER,
Indian Army
Progress
Quantity
18
Category
VANE PUMP
Bid Type
Two Packet Bid
The opportunity is with the Indian Army under the Department Of Military Affairs for the procurement of a broad range of vehicle spare parts and components, including items such as steering vane pump, hydraulic head, vane pump, roller pin set, weather strip windshield glass, seal kit, roller bearing, clutch plate, wheel bearing rear, fuel pump assembly, timing belt, and fuel filter. The BOQ lists 12 items, but exact quantities and unit measures are not disclosed. The contract allows a quantity variation of up to 25% at the time of order and during the currency of the contract, with rates kept contracted. Key differentiator is the option-driven quantity flex and extended delivery timing formula. Bidders should anticipate a procedural emphasis on vendor code creation and bank-related documentation. The procurement context centers on mandatory supplier registration and standard compliance for defense equipment maintenance parts. Unique aspects include the explicit 25% option clause and the need to align with the purchaser’s delivery window starting from the last date of the original delivery order.
Product/service names: Steering Vane Pump, Hydraulic Head, Vane Pump, Roller Pin Set, Weather Strip Wind Shield Glass, Seal KI, Roller Bearing, Clutch Plate, Wheel Bearing Rear, Fuel Pump Assembly, Timing Belt, Fuel Filter
Quantities: 12 items listed; exact quantities not disclosed
EMD/Estimated value: Not specified in available data
Experience: Not specified
Quality/standards: Not specified; references to ISI/ISO are not provided in data
Option Clause: 25% quantity variation at contract initiation and during currency
Vendor Code Creation: required PAN, GSTIN, cancelled cheque, EFT mandate
Delivery: calculated based on last delivery order date with minimum 30 days
Documentation: upload all bid documents per Bid Document, ATC, Corrigendum
BOQ: 12 items, quantities not disclosed; no explicit standards provided
Not specified in excerpt; ensure compliance with standard government procurement terms and any contract-specific payment conditions
Delivery window begins after last date of original delivery order; option-based extension uses (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days
No explicit LD details provided in data; bidders should review Bid Document for penalties or performance bonds
Must submit PAN, GSTIN, cancelled cheque, and EFT mandate
Compliance with Vendor Code creation process
Fulfill standard bid-document upload requirements per ATC/Corrigendum
Indian Army
Indian Army
Sri Ganganagar, RAJASTHAN
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
PITHORAGARH, UTTARAKHAND
Indian Army
ALWAR, RAJASTHAN
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | STEERING VANE PUMP | X-8834800 | 1 | nos | wkspoffr870 | 15 |
| 2 | HYD HEAD | 1468-376-174AR | 1 | nos | wkspoffr870 | 15 |
| 3 | VANE PUMP | 1467-030-3084 | 1 | nos | wkspoffr870 | 15 |
| 4 | ROLLER PIN SET | 1460-232-950 | 1 | nos | wkspoffr870 | 15 |
| 5 | WEATHER STRIP WIND SHIELD GLASS | F-0102050 | 1 | nos | wkspoffr870 | 15 |
| 6 | PARTS SET SEAL KI | F002 D11 367-4AR | 1 | nos | wkspoffr870 | 15 |
| 7 | ROLLER BEARING | 2463-100-002-30C | 5 | nos | wkspoffr870 | 15 |
| 8 | CLUTCH PLATE | 22400M83060 | 2 | nos | wkspoffr870 | 15 |
| 9 | WHEEL BEARING REAR | 09269-35009 | 2 | nos | wkspoffr870 | 15 |
| 10 | FUEL PUMP ASSY | 15100M830A1 | 1 | nos | wkspoffr870 | 15 |
| 11 | TIMING BELT | 2789-0511-6303 | 1 | nos | wkspoffr870 | 15 |
| 12 | ASSY FUEL FILTER | 2534-0911-0117 | 1 | nos | wkspoffr870 | 15 |
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate duly certified by Bank
Certificates and documents as per Bid Document, ATC and Corrigendum (if any)
Vendor Code Creation documents
Key insights about PUNJAB tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT Mandate alongside certificates per Bid Document/ATC. Ensure 25% quantity variation readiness and submit required vendor code documents. Review the 12-item BOQ and align with delivery terms based on the last delivery order date.
Submit PAN Card, GSTIN, Cancelled Cheque, EFT Mandate, and all certificates requested in the Bid Document/ATC. Include OEM authorizations if applicable and ensure GST and tax registrations are current. Vendor code creation is mandatory for participation.
Delivery starts from the last date of the original delivery order. Quantity may be increased/decreased up to 25% with contracted rates. If extended, the extra time is calculated as (increased quantity/original quantity) × original days, with a minimum 30 days.
The scope includes steering vane pump, hydraulic head, vane pump, roller pin set, weather strip windshield glass, seal kit, roller bearing, clutch plate, rear wheel bearing, fuel pump assembly, timing belt, and fuel filter, totaling 12 listed items with unspecified quantities.
No explicit ISI/ISO standards are listed in provided data. Bidders should verify standards in the Bid Document and ensure compliance with any referenced IS 550 or other defense procurement standards during final submission.
Submit PAN, GSTIN, Cancelled Cheque, and EFT Mandate certified by bank as part of the vendor code creation process. Failure to provide these may result in bid rejection per terms under the Buyer Added Terms.
The purchaser may alter order quantity by ±25% at placement and during contract currency. Delivery periods adjust using the specified formula, ensuring minimum 30 days for additional time, enabling supply flexibility while maintaining contracted rates.
Eligibility requires submission of mandatory vendor-code documents (PAN, GSTIN, cancelled cheque, EFT Mandate) plus all certificates referenced in the Bid Document/ATC. Ensure all 12 BOQ items are covered by compliant suppliers and align with delivery terms.
Indian Army
📍 KARGIL, JAMMU & KASHMIR
Access all tender documents at no cost
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS