Tender Overview
The Nuclear Power Corporation of India Limited (NPCIL), Department of Atomic Energy, invites bids for a Chemical Storage Cabinet (Q3 category) under a goods-only supply contract. The bid targets MSME-reserved status with OEM/manufacturer eligibility, and a commercial framework allowing quantity adjustments up to 25% during and after contract formation. Key differentiators include the need for careful compliance with ATC-linked invoicing, GST documentation, and original supplier identification. The procurement emphasizes installation-ready storage cabinets with defined frame, height, depth, and width specifications, alongside a warranty provision. The tender emphasizes delivery timelines aligned to supply quantities and potential extended periods within the option clause, with a focus on transparent invoicing and bank detail disclosures. Unique aspects include the MSME reservation condition and ATC-compliant payment flow.
Technical Specifications & Requirements
- Product: Chemical Storage Cabinet (Q3) under construction category with emphasis on outer frame, height, depth, and width dimensions.
- Basic scope: Only supply of goods; no service component.
- Key dimensions: Height, Depth, Width to be provided by bidders; explicit values not disclosed in data.
- Warranty: unspecified duration; bidders should verify ATC for warranty terms.
- Additional ATC elements cover invoice format, GST compliance, and test certificates where applicable.
- Notable compliance cues: MSME reservation requires OEM/manufacturer eligibility; reference to ATC attachments for submission specifics.
Terms, Conditions & Eligibility
- Quantity adjustment: up to 25% increase/decrease at contract placement and during currency at contracted rates.
- Scope: Goods only; no turnkey installation or service charges.
- MSME reservation: bidder must be OEM/manufacturer of offered product to claim benefit.
- Payment/invoice: Original invoice with Bill to/Shipped to (Annexure-F); GST invoice and GST portal payment screenshot required; timely submission to Paying Authority.
- Documentation: Upload filled ATC forms and confirm compliance with additional item specifications; non-submission may affect evaluation.