GEM

Uttar Pradesh Urban Development LED Luminaire Tender Basti UP 2025 IS 10322 Part 5 3 Q3

Bid Publish Date

26-Nov-2025, 10:25 pm

Bid End Date

08-Dec-2025, 12:00 pm

Value

₹3,77,072

Progress

Issue26-Nov-2025, 10:25 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

12

Category

LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5 / Section 3)

Bid Type

Two Packet Bid

Key Highlights

  • IS 10322 compliance (Part 5 / Section 3) for LED street luminaires
  • V2 octagonal pole with single or double arm brackets specification
  • ISO 9001 certification requirement for bidder or OEM
  • Material Test Certificate mandatory with supply & lab-based acceptance
  • BIS licence and type test/approval certificates required
  • Bidder and OEM three-year turnover criteria with documentary evidence
  • Option clause permitting up to 25% quantity variation during contract
  • Delivery period mechanics tied to original and extended delivery timelines

Categories 8

Tender Overview

The Uttar Pradesh Urban Development Department invites bids for LED Luminaire systems for road and street lighting in Basti, Uttar Pradesh. Estimated value is ₹377,072. Tender focuses on LED luminaires conforming to IS 10322 (Part 5 / Section 3) and supports installation on octagonal poles with single or double arm brackets (V2, Q3). No BOQ items are listed, highlighting a compact, standards-driven procurement. The opportunity requires bidders to demonstrate ISO 9001 certification, BIS-type approvals, and material test documentation. The contract includes an option clause allowing up to 25% quantity variation and flexible delivery time linked to original and extended delivery periods. Emphasizing quality assurance, the buyer will conduct material testing in their lab with results as sole acceptance criteria. Delivery and handover depend on the extended delivery framework, keeping bidders prepared for potential quantity adjustments during contract execution.

Technical Specifications & Requirements

  • Product category: LED road luminaires, IS 10322 compliance (Part 5 / Section 3) for Q3 luminaires, compatible with octagonal poles and single/double arm brackets (V2).
  • Standards & certifications: ISO 9001 certification for bidder or OEM; BIS licence; type test and approval certificates to be uploaded.
  • Documentation: Material Test Certificate required with supply; certificates uploaded with bid; OEM authorizations if applicable.
  • Delivery scope: 25% quantity variation allowed; delivery period aligned with original and extended periods; tests to determine acceptance.
  • Financials: Minimum average annual turnover criteria for bidder and OEM as specified in bid document; audited statements or CA certificates required for turnover verification.
  • Counterparty requirements: OEM turnover criteria, and bidder eligibility must align with the stated terms.

Terms, Conditions & Eligibility

  • EMD: Not disclosed in data; bidders must refer to bid document for exact requirement.
  • Delivery: Delivery term follows option clause and extended period mechanics; minimum 30 days baseline if applicable.
  • Payment terms: Not specified in the provided data; refer to tender terms for schedule.
  • Documents: Upload ISO 9001 certificate, BIS licences, type test certificates, material test reports, OEM authorizations, and audited turnover proofs.
  • Warranty/Quality: Material tested in buyer’s lab; acceptance solely on lab results; ensure compliance with IS 10322 standards.
  • Turnover criteria: Must meet both bidder and OEM three-year average turnover as per bid document; provide certified balance sheets or CA certificates.

Key Specifications

  • LED road luminaire conforming to IS 10322 (Part 5 / Section 3) for Q3

  • Compatible with octagonal poles, single Arm or double Arm brackets (V2)

  • Material Test Certificate to be submitted and lab-tested for acceptance

  • ISO 9001 certified bidder or OEM

  • BIS licence and type test certificates required

  • Three-year turnover requirement for bidder and OEM with supporting documents

Terms & Conditions

  • Up to 25% quantity variation during contract with updated delivery time

  • Delivery period based on original and extended periods; minimum 30 days

  • Lab-based material acceptance and IS 10322 compliance must be met

  • Mandatory ISO 9001, BIS licences, and type test certificates

  • Turnover criteria for both bidder and OEM with documentary evidence

Important Clauses

Payment Terms

Not specified in provided data; refer to bid document for schedule and milestone-based payments

Delivery Schedule

Delivery starts from last delivery order date; option quantity affects extended period; minimum 30 days extension rule

Penalties/Liquidated Damages

Not specified in data; check tender terms for LD or penalties if any

Bidder Eligibility

  • Must hold ISO 9001 certification (bidder or OEM)

  • Must provide BIS licence and type test/approval certificates

  • Three-year average turnover evidence for bidder and OEM

  • Material Test Certificate to accompany supply

  • Compliance with IS 10322 Part 5 Section 3 for LED luminaires

Past Similar Tenders (Historical Results)

5 found

LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5 / Section 3),Octagonal

N/a

BASTI, UTTAR PRADESH

Posted: 10 September 2025
Closed: 22 September 2025
GEM

LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5 / Section 3),Octagonal

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

HARDOI, UTTAR PRADESH

Posted: 12 September 2025
Closed: 22 September 2025
GEM

LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5 / Section 3),Octagonal

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

HARDOI, UTTAR PRADESH

Posted: 12 September 2025
Closed: 22 September 2025
GEM

LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5 / Section 3),Octagonal

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

HARDOI, UTTAR PRADESH

Posted: 12 September 2025
Closed: 22 September 2025
GEM

LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5 / Section 3),Octagonal

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

HARDOI, UTTAR PRADESH

Posted: 12 September 2025
Closed: 22 September 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Audited financial statements or CA certificate showing turnover (last 3 years)

4

ISO 9001 certificate (bidder or OEM)

5

BIS licence and type test certificates

6

Material Test Certificate with supply

7

OEM authorization letter (if applicable)

8

Technical bid document and any ATC/Corrigendum certificates

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What documents are required for LED luminaire tender in Basti UP?

Bid submissions must include GST and PAN, ISO 9001 certificate (bidder or OEM), BIS licence, type test certificates, Material Test Certificate, audited turnover proofs for last 3 years, and OEM authorizations if applicable. Upload ATC certificates if provided.

How is quantity variation handled in the UP LED tender?

The purchaser may increase or decrease quantity up to 25% of bid quantity at contract placement and during currency at contracted rates. Delivery timing adjusts based on the extra quantity relative to the original period, with a minimum 30 days added time.

What standards govern the LED luminaire specifications in this tender?

Luminaires must conform to IS 10322 (Part 5 / Section 3) for Q3 category, and suppliers must prove IS 10322 compatibility through lab tests and approvals in line with BIS requirements.

What certifications are mandatory for bidders and OEMs?

Bidders must provide ISO 9001 certification (bidder or OEM) and BIS licence plus type test certificates. Material Test Certificate must accompany delivery; non-compliance leads to bid rejection.

When is the delivery window for the LED luminaires in UP?

Delivery timeline aligns with the original delivery order date, with possible extensions under the option clause. If extended, the additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What is required to demonstrate bidder and OEM turnover?

Submit audited Balance Sheets or CA/CMA certificates indicating average annual turnover for the last three financial years ending 31st March. If the company is under 3 years, turnover considers completed years post-incorporation.

How to verify IS 10322 conformance for the LED luminaires?

Provide product literature and type test reports showing compliance with IS 10322 Part 5 Section 3 Q3, plus lab or third-party certification results. Ensure the product matches octagonal pole mounting and single/double arm bracket configurations.

What documents constitute the material acceptance for delivery?

Submit a Material Test Certificate; the buyer’s lab will evaluate the results, and acceptance hinges on these lab outcomes. Ensure all material meets IS 10322 and BIS standards before shipment.

Similar Tenders

2 found
Urgent

Uttar Pradesh Urban Development Department LED Luminaire & Octagonal Pole Tender 2025 – IS 10322, ISO 9001/45001, ₹43.77 Lakh

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

📍 BAHRAICH, UTTAR PRADESH

EMD: ₹87,000
Est: ₹43.8 L
⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

E-municipalities Uttar Pradesh LED Luminaire and Octagonal Pole Tender Bahraich 2025

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

📍 BAHRAICH, UTTAR PRADESH

EMD: ₹41,000
Est: ₹21.6 L
⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM