GEM

Dr BR Ambedkar Polytechnic College Online UPS 10KVA with Battery IS 16242 Tender 2025 East Godavari Andhra Pradesh

Bid Publish Date

21-Nov-2025, 11:37 am

Bid End Date

01-Dec-2025, 12:00 pm

Bid Opening Date

01-Dec-2025, 12:30 pm

Progress

Issue21-Nov-2025, 11:37 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 4

Tender Overview

Dr B R Ambedkar Polytechnic College in partnership with the Higher And Technical Education Department Puducherry invites bids for an Online UPS (10 KVA) with battery conforming to IS 16242 (Part 1) under PAC criteria. Estimated value and exact quantity are not disclosed; the scope includes Supply, Installation, Testing and Commissioning. Location emphasis is on the East Godavari district (Andhra Pradesh) and the procurement targets reliable, IS 16242-compliant UPS units with standard warranty and after-sales support. The unique conditions include a 25% quantity option during contract, firm delivery periods, and guaranteed service centre presence, enabling smooth deployment at consignee sites.

Technical Specifications & Requirements

  • Product: Online UPS 10 KVA with battery conforming to IS 16242 (Part 1), PAC only
  • Delivery scope: Supply, Installation, Testing and Commissioning included in bid price
  • Service support: must have a functional service centre in the state of each consignee location or establish one within 30 days of award; dedicated toll-free support and escalation matrix required
  • Warranty: 1 year warranty from final acceptance or after installation; OEM warranty certificates to be submitted at delivery; after-sales service network in India required
  • Standards and compliance: IS 16242 conformance; installation, testing and commissioning competence
  • Delivery terms: option to increase quantity up to 25% during contract with proportional extension of delivery period; minimum extension rule defined

Terms, Conditions & Eligibility

  • EMD: amount not disclosed in data; bidders must note option clause allowing up to 25% quantity variation with adjusted delivery timeline
  • Payment and performance: bid to include cost of supply, installation, testing, commissioning; service readiness as part of bid
  • Warranty & penalties: 1 year warranty; ensure presence of service centres and escalation procedures; OEM warranties to be provided
  • Documentation: bidders must supply OEM authorisations, service centre details, and installation/commissioning plan; compliance with PAC requirements
  • Delivery: delivery period tied to original schedule with possible extensions per option clause; ensure readiness to commence from last delivery order date
  • Eligibility: capability to install and service UPS systems of 10 KVA with IS 16242 compliance; proof of prior similar deployments encouraged
  • Additional: ensure dedicated service line and quick-response support for maintenance

Key Specifications

  • Product: Online UPS 10 KVA with battery

  • Standard: IS 16242 (Part 1) compliance

  • Scope: Supply, Installation, Testing and Commissioning

  • Warranty: 1 year from final acceptance/installation

  • Service: Functional service centre in state or establishment within 30 days

  • Support: Dedicated toll-free number and escalation matrix

  • Delivery clause: 25% quantity variation; extended delivery period rules

Terms & Conditions

  • EMD amount not disclosed; bidders must prepare to meet standard security deposit requirements

  • Option clause allows quantity variation up to 25% during and after award with adjusted delivery timelines

  • One-year OEM warranty; provide warranty certificates at delivery and ensure local service capability

Important Clauses

Payment Terms

Bid price must cover Supply, Installation, Testing and Commissioning; payment terms not specified in data; ensure compliance with PAC delivery and warranty requirements

Delivery Schedule

Delivery period anchored to last date of original delivery order; extended periods allowed proportionally for increased quantity, minimum 30 days

Penalties/Liquidated Damages

No explicit LD details provided; ensure compliance with standard government procurement penalties and timely delivery to avoid penalties

Bidder Eligibility

  • Experience in Supply, Installation, Testing and Commissioning of UPS systems

  • Evidence of IS 16242 (Part 1) UPS conformity

  • Functional or plan to establish service centre in the state of consignee location within 30 days of award

Past Similar Tenders (Historical Results)

5 found

Indian Air Force Online UPS (10 KVA) with Battery Tender India 2025 IS 16242 Part 1

Indian Air Force

Posted: 6 November 2025
Closed: 17 November 2025
GEM

Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1)

Chief Engineer Pwd R And B Ladakh

LEH, JAMMU & KASHMIR

Posted: 16 October 2025
Closed: 27 October 2025
GEM

Diesel Loco Modernisation Works Online UPS 10 KVA IS 16242 Part 1 Procurement 2025 India

Diesel Loco Modernisation Works

PATIALA, PUNJAB

Posted: 20 November 2025
Closed: 24 November 2025
GEM

South Western Railway Online UPS (10 KVA) with Battery IS 16242 Part 1 Tender 2025

South Western Railway

Posted: 23 October 2025
Closed: 3 November 2025
GEM

East Central Railway Online UPS 10 KVA with Battery Tender IS 16242 Part 1 2025

East Central Railway

Posted: 24 October 2025
Closed: 4 November 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates for similar UPS installations

4

Financial statements (audited, if available)

5

EMD submission documents (amount not specified in data; follow tender guidance)

6

Technical bid documents showing IS 16242 conformity

7

OEM authorization certificates

8

Service centre proof or plan to establish within 30 days of award

9

Warranty certificates from OEM

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

How to bid for East Godavari UPS tender in Andhra Pradesh 2025?

Bidders should prepare IS 16242 compliant UPS units, provide OEM authorisations, establish or prove service centres in the consignee state, and submit documents including GST, PAN, experience certificates, and OEM warranties. The bid must include Supply, Installation, Testing and Commissioning charges and ensure 25% quantity variation readiness.

What documents are required for UPS tender submission in Andhra Pradesh?

Submit GST certificate, PAN card, company financials, UPS experience certificates, IS 16242 conformity proof, OEM authorization, service centre evidence or plan, and OEM warranty certificates. Include installation and commissioning methodology and a dedicated service contact matrix for support.

What are the technical specifications for the UPS under IS 16242?

The unit must be Online UPS of 10 KVA with battery, conforming to IS 16242 (Part 1). The scope includes Supply, Installation, Testing and Commissioning. Ensure compatible with PAC procurement requirements and provide a one-year OEM warranty with validated installation testing outcomes.

When is the delivery timeline for the UPS tender in East Godavari?

The delivery period aligns with the last date of the original delivery order; if quantity increases by up to 25%, extended delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.

What are the warranty and after-sales requirements for this UPS tender?

A 1-year warranty is mandatory from final acceptance or after installation. OEM warranty certificates must be provided at delivery. The bidder must demonstrate a well-established service network in India and provide installation, commissioning, training, and troubleshooting support.

What is required for service centres and support in this procurement?

Bidders must have a functional service centre in the consignee state or establish one within 30 days of award. A dedicated toll-free service line and an escalation matrix must be provided to ensure rapid issue resolution and preventive maintenance.

What does the option clause mean for quantity variations in this UPS bid?

The purchaser may increase or decrease quantity up to 25% of bid quantity at contract placement and during the contract. Delivery timelines adjust proportionally, computed as (Increased/Original) × Original delivery period, with a minimum 30 days extension.

Similar Tenders

5 found
Urgent

Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1)

Office Of The District Collector Kottayam

📍 KOTTAYAM, KERALA

⏰ Deadline: 1 day left
🛒 Type: Goods
View GEM
Urgent

Department Of Ex-Servicemen Welfare UPS 10 KVA with Battery IS 16242 Part 1 Tender Jhunjhunu Rajasthan 2025

Department Of Ex Sevicemen Welfare

📍 JHUNJHUNU, RAJASTHAN

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM

Jammu and Kashmir Police Online UPS Tender 10 KVA Battery IS 16242 Part 1 2025

Jammu And Kashmir Police

📍 JAMMU, JAMMU & KASHMIR

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1)

Centre For Development Of Advanced Computing (c-dac)

📍 THIRUVANANTHAPURAM, KERALA

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1)

North Western Railway

📍 UDAIPUR, RAJASTHAN

EMD: ₹34,640
⏰ Deadline: 4 weeks left
🛒 Type: Goods
View GEM