CPU fan,canon Maintenance Box,Pressure Roller 1007,Brother Fuser Assy,Gear Epson,Logic Card Kyocera
Indian Army
Bid Publish Date
18-Nov-2025, 8:02 pm
Bid End Date
29-Nov-2025, 9:00 pm
Bid Opening Date
29-Nov-2025, 9:30 pm
Location
Progress
Quantity
5
Category
Imaging Unit HP 438 NDA
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, seeks supply of imaging-related equipment and assemblies including Imaging Unit HP 438 NDA, Imaging Unit M 438 DN, Fuser Unit Assembly 438 NDA, Logic Card M 305 Front Panel, and Scanner Unit Assembly Epson for deployment in KARGIL, Jammu & Kashmir (PIN 194102). Estimated contract value is not disclosed; scope limited to supply of goods with a 25% option quantity increase/decrease during contract and extension rules. The procurement emphasizes conformity to buyer-specified samples, pre-dispatch and post-receipt inspection, and advance sample approval within 5 days of award. Timely delivery and adherence to contract sample approvals are critical differentiators.
Product categories: Imaging Unit HP 438 NDA, Imaging Unit M 438 DN, Fuser Unit Assembly 438 NDA, Logic Card M 305 Front Panel, Scanner Unit Assembly Epson
Inspection regime: Pre-dispatch at seller premises (if selected), Post-receipt inspection at consignee site
Sample process: 5-day sample approval window; one advance sample required; modification cycle within 5 days
Delivery variation: Option clause up to 25%; delivery period scaled to order quantity with minimum 30 days
Scope: Only supply of goods; no services included unless specified later
Quality criteria: Major deviations may trigger fresh samples or contract termination
Option quantity clause allowing ±25% variation during and after contract
Advance sample approval required within 5 days of contract award
Pre-dispatch and post-receipt inspections to be conducted by nominated agencies
Due to data gaps, payment terms are not explicitly stated; bidders should anticipate standard government terms aligned with supply of goods contracts and advance sample approvals
Delivery commences from the last date of original delivery order; option-based extensions use the formula (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days
Not specified; contract allows modifications based on sample approval and may terminate for major deviations
Experience in supplying imaging equipment or related hardware to government entities
Ability to meet advance sample process and post-dispatch inspection requirements
Compliance with OEM authorizations and applicable certifications for imaging components
Indian Army
Indian Army
SRINAGAR, JAMMU & KASHMIR
Indian Army
WEST KAMENG, ARUNACHAL PRADESH
Indian Army
IMPHAL WEST, MANIPUR
Indian Army
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Imaging Unit HP 438 NDA | IT | 1 | nos | wkspoffr_i@852 | 15 |
| 2 | Imaging Unit M 438 DN | IT | 1 | nos | wkspoffr_i@852 | 15 |
| 3 | Fuser Unit Assembly 438 NDA | IT | 1 | nos | wkspoffr_i@852 | 15 |
| 4 | Logic Card M 305 Front Pannel | IT | 1 | nos | wkspoffr_i@852 | 15 |
| 5 | Scaanner Unit Assembly Epson | IT | 1 | nos | wkspoffr_i@852 | 15 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates for similar imaging equipment supply
Financial statements demonstrating financial stability
EMD/Security deposit documentation
Technical bid documents demonstrating compliance with requested product categories
OEM authorizations or valid vendor certifications if applicable
Key insights about JAMMU AND KASHMIR tender market
Bidders must submit GST and PAN, experience certificates, financials, EMD, technical bid, and OEM authorizations. Prepare advance sample within 5 days of award, comply with pre/post inspection, and be ready for 25% quantity variation per the option clause.
Submit GST registration, PAN, company financial statements, experience certificates for similar imaging hardware, EMD, technical bid, and OEM authorization letters if required by the supplier terms; ensure bid pack includes all requested documents.
Delivery begins after the last date of the original delivery order; 25% quantity variation permitted; extension calculation is (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days.
Standards and certifications are not explicitly listed; bidders should provide OEM authorizations and ensure hardware complies with buyer-specified compliance, including conformity to advance sample approvals and inspection processes.
Advance sample must be submitted within 5 days of contract award; buyer provides approval or modification list within 5 days; bulk supply must follow approved sample to avoid delays.
Pre-dispatch inspection at seller premises if selected, and post-receipt inspection at consignee site; a nominated inspection agency may conduct acceptance testing before stores are issued.
If major deviations are found, the buyer may require fresh samples or terminate the contract after notifying deviations; supplier must supply test samples at no cost and ensure bulk supply conforms to approved specifications.
Yes, the purchaser may increase/decrease quantity up to 25% during contract and currency; delivery time adjusts accordingly with minimum 30 days extension, ensuring continuity of supply.
Access all tender documents at no cost
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS