Advanced Weapons And Equipment India Limited, under the Department Of Defence Production, seeks a high performance unitised wheel for polishing with a 6” DIA x 1” thickness and a 1/4” centre hole (U-3). Inspection is at Rifle Factory Ishapore. The contract anticipates flexible quantities via an option clause up to 25% and a delivery timeline aligned to original delivery periods. Payment terms specify 100% payment within 30 days after delivery and acceptance. GST handling is bidder-borne with reimbursement as actuals or applicable rates, subject to the quoted GST percentage. Vendors must conform to bid submission with PAN, GSTIN, cancelled cheque, and EFT mandate. Confidential documentation uploaded during tendering remains restricted. The absence of a BOQ implies item-specific compliance is essential, and delivery schedules will be governed by purchase orders with potential quantity adjustments.
- Organisation: Advanced Weapons And Equipment India Limited
- Location: Rifle Factory Ishapore, Ishapore, West Bengal (inspection site)
- Product category: Polishing wheel, 6” diameter, 1” thick, 1/4” centre dia
- Estimated value: not disclosed; EMD: not disclosed
- Key differentiator: option-based quantity adjustment and on-site inspection at RFI
Technical Specifications & Requirements
- Item: High performance unitised wheel for polishing
- Size: 6” DIA x 1” THICK x 1/4” CENTRE DIA
- Inspection: at Rifle Factory Ishapore by CGM/RFI authorized inspector
- Payment: 100% within 30 days after delivery and acceptance
- Liquidated Damage: 0.5% per week on undelivered stores, max 10% of delayed value
- Delivery & GT/ATC: 25% variation allowed; GST handling per actuals or quoted rate
- Documentation: PAN, GSTIN, cancelled cheque, EFT mandate; GST invoice upload required
- Confidentiality: online documents treated confidentially; anti-corruption measures
Terms, Conditions & Eligibility
- EMD: not disclosed in terms; verify at bid stage
- Delivery: governed by original delivery schedule; extended time via option clause
- Inspection: mandatory at RFI Ishapore; CGM/RFI to sign off
- Payment: full invoicing upon delivery; 30 days later
- Penalties: LD applies up to 10% of delayed store value
- GST: bidders to determine GST applicability; reimbursement as actuals or applicable rates, whichever is lower
- Documentation: PAN, GSTIN, cancelled cheque, EFT mandate; GST invoice verification