GEM

Tender Notice for Copper Alloy Gate Valve for Waterworks Purpose as per IS 778,Cable Joint Kit (V2),Cable Joint Kit (

Bid Publish Date

18-Nov-2025, 4:54 pm

Bid End Date

28-Nov-2025, 5:00 pm

Bid Opening Date

28-Nov-2025, 5:30 pm

Progress

Issue18-Nov-2025, 4:54 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

73

Category

Floor Drain Traps

Bid Type

Two Packet Bid

Categories 24

Indian Army has released a public tender for Copper Alloy Gate Valve for Waterworks Purpose as per IS 778 (Q3), Cable Joint Kit (V2) (Q3), LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5 / Section 3) (Q3), Floor Drain Traps (Q3). Quantity: 73. Submission Deadline: 28-11-2025 17: 00: 00. Download documents and apply online.

Past Similar Tenders (Historical Results)

5 found

Copper Alloy Gate Valve for Waterworks Purpose as per IS 778

Munitions India Limited

Posted: 7 December 2024
Closed: 17 December 2024
GEM

Copper Alloy Gate Valve for Waterworks Purpose as per IS 778

Rashtriya Ispat Nigam Limited

VISAKHAPATNAM, ANDHRA PRADESH

Posted: 17 January 2025
Closed: 5 February 2025
GEM

Copper Alloy Gate Valve for Waterworks Purpose as per IS 778

Cattle And Dairy Development Division

Posted: 19 December 2024
Closed: 30 December 2024
GEM

Copper Alloy Gate Valve for Waterworks Purpose as per IS 778

Ntpc Limited

Raigarh, CHHATTISGARH

Posted: 7 February 2025
Closed: 10 February 2025
GEM

Copper Alloy Gate Valve for Waterworks Purpose as per IS 778

Munitions India Limited

HOSHANGABAD, MADHYA PRADESH

Posted: 30 January 2025
Closed: 8 February 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC)

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer