Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification
N/a
GONDIA, MAHARASHTRA
Bid Publish Date
14-Nov-2025, 8:41 am
Bid End Date
01-Dec-2025, 9:00 am
Location
Progress
Quantity
2
Bid Type
Two Packet Bid
Solapur District Panchayats, under the Department Of Panchayati Raj, invites bids for Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification. The tender contemplates supply, installation, testing and commissioning of solar pumping units with an option to modify quantity by up to 25% during and after contract. A data sheet must accompany bids to enable parameter verification against offered products. The procurement emphasizes demonstrating three years of regular manufacture and supply of similar products to government bodies, plus a minimum average annual turnover as specified in the bid document. The scope targets government solar-water pumping deployments in districts like Solapur, with emphasis on compliant, field-ready systems. Unique facets include the option clause and requirement to meet MNRE V2 specifications, ensuring compatibility with central and state government standards. The tender signals a structured evaluation of OEM capability and post-award performance.
Solar Photovoltaic Water Pumping System (V2) as per MNRE specification
Scope: Supply, Installation, Testing and Commissioning
Experience: 3 years in government or PSU supply
Turnover: 3-year average turnover as per bid document
Data Sheet: 1:1 parameter matching with product offered
Quantity flexibility: ±25% during/after contract
Quantity variation up to 25% with extended delivery time rules
Mandatory data sheet upload and parameter verification
Three-year government supply experience and OEM turnover criteria
Not explicitly stated; bidders should expect standard government terms aligned to MNRE project norms
Delivery period starts from the last date of the original delivery order; option clause may extend delivery time with minimum 30 days, proportional to increased quantity
Not specified; standard procurement penalties may apply for delays per government guidelines
Minimum 3 years of regular manufacturing/supply experience of similar PV pumping systems to government bodies
Demonstrable turnover: 3-year average turnover as per bid document
Data Sheet alignment: Product parameters must match offered goods
N/a
GONDIA, MAHARASHTRA
N/a
GONDIA, MAHARASHTRA
Parbhani District Panchayats
HINGOLI, MAHARASHTRA
Parbhani District Panchayats
HINGOLI, MAHARASHTRA
Nashik District Panchayats
NASHIK, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates showing 3 years of government/similar supply
Audited financial statements or CA/Cost Accountant turnover certificate for last 3 years
OEM authorization or reseller agreements (if applicable)
Data Sheet for the offered solar pumping system
Evidence of past contracts with Central/State Govt/PSU
Any other bid-specific technical compliance certificates
Extended Deadline
01-Dec-2025, 9:00 am
Opening Date
01-Dec-2025, 9:30 am
Key insights about MAHARASHTRA tender market
Bidders must satisfy 3-year government supply experience and OEM turnover criteria, upload a complete data sheet, provide audited turnover certificates for the last 3 years, and ensure the offered PV pumping system complies with MNRE V2 standards. The bid includes SITC scope and quantity variation up to 25%.
Required documents include GST registration, PAN, 3-year government supply experience proofs, audited financial statements or CA turnover certificate for last 3 years, OEM authorization, data sheet, and contracts showing similar work with government bodies.
The scope encompasses Supply, Installation, Testing and Commissioning of Solar PV Water Pumping Systems (V2) as per MNRE specification, including field commissioning and performance verification as part of SITC.
Purchaser may increase or decrease order quantity up to 25% of bid quantity at contract placement and during currency, with delivery time adjusted using the specified formula and a minimum of 30 days.
Systems must adhere to MNRE V2 specifications for solar pumping, with data sheet parameter alignment to offered product; ensure ISI/IS 550 not required unless stated in MNRE guidelines, and comply with government procurement norms.
Payment terms are not explicitly stated; bidders should expect standard government terms, with performance verification upon SITC completion. Confirm payment schedule during bid submission and ensure EMD and bid security per tender norms.
Data sheet verification is mandatory; mismatches between the data sheet and offered product may lead to bid rejection. Prepare a detailed data sheet matching all specifications, ratings, and MNRE V2 compliance details.
Provide contracts or work orders with government/PSU entities showing supply of similar PV pumping systems, including year-wise quantities and performance, along with reference contact details for verification.
N/a
📍 AHMEDNAGAR, MAHARASHTRA
General Administartion Department
📍 GADCHIROLI, MAHARASHTRA
Chandrapur District Panchayats
📍 CHANDRAPUR, MAHARASHTRA
Satara District Panchayats
📍 SATARA, MAHARASHTRA
N/a
📍 PUNE, MAHARASHTRA
Access all tender documents at no cost
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS