Chest Press - Outdoor Gym Equipments,Air Walker / Stroller - Outdoor Gym Equipment,Shoulder Builde
Rural Development Department
MUZAFFARPUR, BIHAR
Progress
Quantity
16
Category
Chest Press - Outdoor Gym Equipments
Bid Type
Two Packet Bid
The Urban Development And Housing Department Bihar invites bids for the supply, installation, testing and commissioning of outdoor gym equipment at Khagaria, Bihar 851201, including Chest Press, Air Walker, Shoulder Builder, Leg Press, Twister, Sit Up Board, Surf Board, and Multi Adjustable Bench (Q3). The scope includes GI pipe-based frames with ISI marking, IS 1239 class components, installation at consignee site, and a 1-year warranty. Key differentiators include ISI certification for all GI pipes and a requirement for OEM service support and local service centers. The purchaser reserves quantity adjustment up to 25% during contract and extended delivery periods with a minimum 30-day cushion. The bid covers supply, installation, testing and commissioning with dedicated service support. Location-specific procurement context: government gym equipment for public use under Bihar urban development initiative.
Outdoor gym equipment set including Chest Press, Air Walker, Shoulder Builder, Leg Press, Twister, Sit Up Board, Surf Board, Multi Adjustable Bench
Frame material: GI pipes; ISI marked; main central pipe and fittings with IS 1239 class
Foundation: MS foundation plate thickness; foundation pipes with anchoring; nominal bore per IS 1239
Bearings, connecting links, foot rest pipes, seat/back rest materials with specified class
Warranty: 1 year; OEM warranty certificates; service network in India
Option clause allows ±25% quantity variation during contract and currency
Delivery includes SITC; installation & commissioning if in scope
Dedicated service support with toll-free number required
Safety & quality certifications must be demonstrated; ISI & IS 1239 compliance
Warranty: 1 year with post-warranty service support
Not specified in provided terms; verify in ATC and during bid submission
Delivery period adjustable with option clause; minimum 30 days; extended periods align with quantity changes
Not clearly specified; confirm LD terms in ATC and contract documents
Experience in supplying and installing outdoor gym equipment (SITC) in public sector
Demonstrated service network and post-sales support within India
Compliance with ISI/IS 1239 standards for GI pipe-based frames
Rural Development Department
MUZAFFARPUR, BIHAR
Panchayati Raj Department
SAMASTIPUR, BIHAR
Panchayati Raj Department
SAMASTIPUR, BIHAR
Rural Development Department
SAMASTIPUR, BIHAR
Muzaffarpur District Panchayats
MUZAFFARPUR, BIHAR
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| TYPE | Type | Chest Press Double |
| CAPACITY | Maximum User Weight ( Kg ) | 120.0 |
| MATERIAL | Governing Specification for GI Pipes | BIS specification No IS 1239 ( Part 1 )- 2004, latest, BIS specification No IS 1161:2014, latest |
| MATERIAL | All the GI Pipes are ISI marked | Yes, No |
| MATERIAL | Main Central Pipe | 80mm Nominal Bore G.I. Pipe, 100mm Nominal Bore G.I. Pipe |
| MATERIAL | Main Central Pipe, Class as per IS 1239 | Medium, Not applicable for pipe as per IS 1161 |
| MATERIAL | Handle Frame | 32mm Nominal bore G.I. pipe |
| MATERIAL | Handle Frame Pipe, Class as per IS 1239 | Heavy |
| MATERIAL | Seat Frame | 32mm Nominal Bore G.I. Pipe |
| MATERIAL | Seat Frame Pipe, Class as per IS 1239 | Heavy |
| MATERIAL | Connecting Links | 25mm Nominal Bore G.I. Pipe |
| MATERIAL | Connecting Links Pipe, Class as per IS 1239 | Not applicable for M.S. Plates and Pipes as per IS 1161 |
| MATERIAL | Foot Rest Pipe | 25mm Nominal Bore G.I. Pipe |
| MATERIAL | Foot Rest Pipe, Class as per IS 1239 | Heavy |
| MATERIAL | MS Foundation Plate Thickness | 12.0, 10.0 |
| MATERIAL | Foundation Pipes with anchoring | 750mm deep GI Pipe, supported with M.S. Angle 25 X 25 X 4mm, 500mm deep GI Pipe, supported with M.S. Angle 25 X 25 X 4mm |
| MATERIAL | Nominal Bore of Foundation Pipe | 80mm, 100mm |
| MATERIAL | Foundation Pipe, Class as per IS 1239 | Medium |
| MATERIAL | Seat and Back Rest | 2mm Thick G.I. Seat with uniform bending radius to avoid sharp edges |
| MATERIAL | Bearings | Ball Bearing |
| OTHER REQUIREMENTS | Installation | Included |
| CERTIFICATION | Certfication ( Safety and Quality Requirements ) | No |
| WARRANTY | Warranty ( years ) | 3.0, 2.0 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar SITC of outdoor gym equipment
Financial statements (last 2 years) or turn-over proof
EMD/Security deposit details per ATC
Technical bid documents confirming ISI GI pipes and IS 1239 compliance
OEM authorizations or OEM supply commitments
Warranty certificates and post-sales service proof
Proof of service centers near consignee locations
Key insights about BIHAR tender market
Bidders must submit GST, PAN, experience certificates, financial statements, EMD details, OEM authorizations, and technical bid documents. Ensure ISI GI pipe marks and IS 1239 compliance, with OEM service capabilities and local service centers. The scope includes SITC and installation; confirm delivery terms and option quantity adjustments in ATC.
Required documents include GST certificate, PAN, last two years financials, experience certificates of SITC projects, EMD payment proof, OEM authorization, safety/quality certifications, and a detailed technical bid demonstrating ISI GI pipe conformity and IS 1239 class compliance for all components.
All GI pipes must be ISI marked and conform to IS 1239 class specifications for main central pipe, frame pipes, seat/back rest, and connection links. The project requires safety and quality certifications; manufacturers should provide ISI certification and traceability for all pipe components.
Delivery terms allow a ±25% quantity variation at contract award and during the currency, calculated as (increased quantity/original quantity) × original delivery period with a minimum 30 days. Delivery and commissioning occur at consignee premises per ATC; confirm final dates during bid submission.
The warranty is 1 year from final acceptance or post-installation completion. OEM warranties must be submitted at delivery. The seller guarantees rectification of breakdowns during the guarantee period and must have a nationwide service network for installation, commissioning, training, and maintenance.
Bid must include dedicated toll-free service support and details of service centers near consignee locations. OEM and authorized service partners should provide installation, commissioning, training, troubleshooting, and maintenance services within India, with uptime support and spare parts access during the warranty period.
Scope includes supply of outdoor gym equipment, installation, testing, and commissioning. The bid price must cover all cost components for SITC, along with necessary safety certifications and on-site validation. Ensure installation work aligns with foundation requirements and ISI/IS 1239 standards.
Request OEM ISI certificates and IS 1239 conformance documents for all components, including frame pipes, foundation pipes, and connectors. Verify manufacturing traceability, batch numbers, and quality test reports. Include these certificates in the bid submission with the technical bid.
Access all tender documents at no cost
Main Document
CATALOG Specification
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
CATALOG Specification
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS