Tender Overview
National Aluminium Company Limited, Bhubaneswar invites bids for the procurement of MAJOR PM KIT WITH PROBE TIP and ROLLER TUBE FOR AU-480 along with PHOTOMETER LAMP, 12 V, 20W FOR AU-480. Scope is limited to the supply of goods; no BOQ items listed. Bidders must be registered with ALUMINA REFINERY NALCO, DAMANJODI and ensure GST-compliant invoicing to the consignee. Data Sheet alignment is mandatory to avoid bid rejection. The vendor should also submit a filled SA8000 questionnaire to demonstrate social accountability. The tender emphasizes that GST will be reimbursed per actuals or applicable rates, within quoted % limits. Unique compliance includes TDS considerations under 194Q and standard GEM terms. Location unspecified beyond Bhubaneswar, Odisha. Key differentiator is mandatory pre-registration and SA8000 compliance as part of eligibility. This procurement emphasizes supplier eligibility and detailed documentation rather than volume-based scope.
Technical Specifications & Requirements
- Product names from title: MAJOR PM KIT WITH PROBE TIP, ROLLER TUBE FOR AU-480, PHOTOMETER LAMP 12 V 20W FOR AU-480
- Delivery scope: Supply of goods only; all costs included in bid price (GST, freight, insurance, etc.)
- Data Sheet requirement: Upload with bid; ensure parameter match; mismatches may lead to rejection
- Pre-qualification: Registration/empanelment with ALUMINA REFINERY NALCO, DAMANJODI required at bid opening
- Invoices: Must be raised in consignee name with consignee GSTIN; GST portal payment proof required
- SA8000: Complete SA8000 questionnaire; certification if available
- Tax: Compliance with 194Q TDS provisions from 01-Jul-2021; relevant to payment processing
- ATC: Align terms with GEM general terms and atc clauses; GST and other charges included in bid price
Terms, Conditions & Eligibility
- EMD/DSA: Not specified in data; bidders should verify on bid portal
- Registration: Must be registered with ALUMINA REFINERY NALCO, DAMANJODI as of bid opening date
- GST: GST impact as per actuals or applicable rates, not to exceed quoted GST percentage
- Documentation: Data Sheet, GST invoice proof, SA8000 questionnaire, vendor registration proof
- Invoicing: GSTIN of consignee must appear on invoice; GST portal screenshot required
- SA8000: Not optional; submit completely filled questionnaire or valid SA8000 certificate
- Tax compliance: TDS under 194Q applicable; ensure compliance in financials
- Delivery & payment: Scope is for supply only; ensure terms align with GEM general terms
- Compliance risk: Mismatch between data sheet and offered product can cause rejection
- General terms: Adhere to GEM terms, terms and conditions, and any attachments