GEM

Punjab National Bank Vault Door Tender IS 11188 Baleswar Odisha 2025

Bid Publish Date

29-Nov-2025, 10:49 am

Bid End Date

09-Dec-2025, 4:00 pm

Progress

Issue29-Nov-2025, 10:49 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

5

Bid Type

Two Packet Bid

Key Highlights

  • BIS testing required for vault doors
  • IS 11188 compliance is a core specification
  • Option clause allows up to 25% quantity variation during and after award
  • Delivery terms tied to extended period calculations with minimum 30 days
  • Odisha installation location; regional supply scope
  • No BOQ items available; indicates design-and-supply scope or site adaptation
  • Warranty period specified but not the exact duration
  • Bidders should anticipate BIS/ISI-related certification requirements

Tender Overview

Punjab National Bank in BALESWAR, ODISHA invites bids for a Vault (Strong Room) Door conforming to IS 11188. The scope centers on securing strongroom access with BIS testing and an optional time lock. The procurement appears to target a single door with BIS-approved certification, and terms allow quantity adjustments up to 25% during and after award. Location-specific requirements imply regional supply, installation, and post-installation support within Odisha. The BOQ shows no line items, suggesting a potentially design-and-supply-only contract or a combined specification with site adaptation. AUSTERE but precise specifications emphasize robust protection features and standard-compliant construction suitable for banking infrastructure. Unique differentiators include BIS testing and the option clause for fluctuating order quantity. A key decision driver will be adherence to IS 11188 and BIS-approved components, along with delivery timelines defined by contract extension logic. This tender targets suppliers experienced in security hardware, with emphasis on form-factor compliance and security performance.

Technical Specifications & Requirements

  • Type of Vault (Strong Room) Door and Classification as per IS 11188
  • Dimensions: door height/width (max/min), inside clear opening at 180º swing, frame thickness (single plate fabrication vs. channels), grill gate dimensions, door slab thickness over rebates/lock, and wall thickness
  • Construction & Security: compression mechanism, optional time lock, number and arrangement of shooting bolts on hinge/top/bottom, cross-section area and engagement depth of bolts, drill/oxy torch resistance layer
  • Certifications: BIS testing approval; door to be BIS-certified and ISI/BIS related compliance may be implied
  • Warranty: warranty period defined in terms; post-delivery support unspecified but implied
  • Delivery & Installation: delivery period governed by option clause; regional installation in Odisha is expected
  • Vendor Scope: likely design and supply with compliance checks; OEM/brand requirements not explicit

Terms, Conditions & Eligibility

  • EMD: not disclosed in available data
  • Delivery: delivery period linked to option clause, with potential 25% quantity variation; base delivery period remains undefined
  • Payment Terms: not specified in available data
  • Eligibility: bidders must comply with option clause and BIS-integration requirements; no explicit experience/ turnover figures provided
  • Documents: typical GST, PAN, experience certificates, financials, and OEM authorizations are likely required, though not explicitly enumerated here
  • Warranty/Penalties: warranty period mentioned; penalties or LD not detailed
  • Other Clauses: quantity variation up to 25% at contract and currency extensions; extensions calculated as (additional/original) × original period with minimum 30 days

Key Specifications

  • Vault type: Strong Room Door

  • Classification: IS 11188 compliant

  • Dimensions: height/width max/min; inside clear opening at 180º; door frame thickness (single plate vs channels); grill gate dimensions

  • Shooting bolts: number on hinge side, opposite hinge side, top, bottom; cross-section area; depth of engagement

  • Door slab thickness over rebates/lock; drill/oxy torch resistance layer; door wall and actual wall thickness

  • Construction: compression mechanism; optional time lock

  • Certification: BIS-tested doors; warranty period

Terms & Conditions

  • Quantity can be increased or decreased up to 25% at contract award and during currency

  • Delivery period logic ties to original and extended periods with minimum 30 days

  • Bidders must comply with option clause and BIS/IS 11188 requirements

Important Clauses

Payment Terms

Not explicitly stated; bidders should expect standard government banking procurement terms and BIS compliance cost considerations

Delivery Schedule

Delivery starts from the last date of the original delivery order; extended durations calculated by the option clause with a 30-day minimum

Penalties/Liquidated Damages

Not specified; likely to be aligned with bank procurement norms and BIS compliance penalties

Bidder Eligibility

  • Experience in supplying bank-grade vault doors or equivalent security hardware

  • Demonstrated BIS/IS 11188 compliant products

  • Ability to manage quantity variations up to 25% during contract term

Past Similar Tenders (Historical Results)

5 found

Vault (Strong Room) Door as per IS 11188

State Bank Of India (sbi)

KANGRA, HIMACHAL PRADESH

Posted: 2 April 2025
Closed: 19 April 2025
GEM

Vault (Strong Room) Door as per IS 11188

Bank Of Maharashtra

MUMBAI, MAHARASHTRA

Posted: 17 March 2025
Closed: 20 March 2025
GEM

Vault (Strong Room) Door as per IS 11188

State Bank Of India (sbi)

COIMBATORE, TAMIL NADU

Posted: 19 November 2025
Closed: 22 November 2025
GEM

Vault (Strong Room) Door as per IS 11188

Union Bank Of India (ubi)

NIZAMABAD, TELANGANA

Posted: 13 November 2025
Closed: 17 November 2025
GEM

Vault (Strong Room) Door as per IS 11188

Union Bank Of India (ubi)

CHITTOOR, ANDHRA PRADESH

Posted: 16 October 2025
Closed: 6 November 2025
GEM

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
Generic Type of Vault (Strong Room) Door Vault Main Doors
Generic Classification of Vault (Strong Room) Door B Class - TRTL 30, FR 30
Dimensions Height of Door (Maximum) in mm 2300
Dimensions Height of Door (Minimum) in mm 2100
Dimensions Width of Door (Maximum) in mm 1400
Dimensions Width of Door (Minimum) in mm 1250
Dimensions Inside Height or clear opening of Door, when the shutter swings 180º in mm 1950
Dimensions Inside Width or Clear Opening of Door, when the shutter swings 180º in mm 900
Dimensions Minimum Thickness of door frame in mm if the door frame is made by single plate which is multi bended to form the door frame 10
Dimensions Minimum Thickness of door frame in mm if the door frame is made by fabricating angle or any channel NA
Dimensions Thickness of Angles for Grill Gate 5.0 Or higher
Dimensions Diameter of Grill Gate Road 19.0 Or higher
Dimensions Minimum Pitch of Grill Gate Road 100.0 Or lower
Dimensions Thickness of Door Slabs over Rebates in mm ≥29
Dimensions Thickness of Door Slabs over Lock in mm ≥50
Dimensions Thickness of drill and oxyacetylene torch resisting layer (excluding mild steel plates) ≥20
Dimensions Door Wall Thickness in mm 305~380
Dimensions Actual Wall Thickness in mm 300.0 Or higher
Dimensions Number of Shooting Bolts on Hinge Side 6
Dimensions Number of Shooting Bolts on Opposite Hinge Side 6
Dimensions Number of Shooting Bolts on Top NA
Dimensions Number of Shooting Bolts on Bottom Side NA
Dimensions Cross section Area of Single Shooting Bolt 1134.0 Or higher
Dimensions Depth of Engagement of Shooting Bolt in mm ≥15
Construction Compression Mechanism A continuous resilient packing is incorporated in the frame for compression mechanism for clenching the door tight against this packing in doors, this helps liquids or gases to pass through
Construction Time Lock (Optional) NA
Certification Doors are Tested as approved by BIS Class B Burglary resistance as per IS 11188 Part 2, Fire Endurance 11188 Part 3, Fire Hose Stream Reheat 11188 Part 4
Certification Warranty Period 1.0

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for bank-grade vault door supply

4

Financial statements or turnover proof

5

EMD/Security deposit documents (amount not disclosed)

6

Technical bid documents demonstrating IS 11188 compliance

7

OEM authorization or manufacturer’s certificate (if required)

Frequently Asked Questions

Key insights about ODISHA tender market

How to bid on vault door IS 11188 tender in Odisha?

Bidders should prepare BIS-compliant vault door documentation, OEM authorizations, GST, PAN, and financial statements. Ensure IS 11188 conformity, submit procurement plan for supply and installation in Odisha, and provide EMD details once disclosed. Adhere to option-quantity clauses and regional delivery constraints.

What documents are required for Odisha vault door tender participation?

Submit GST certificate, PAN card, bank-grade experience certificates, financial statements, EMD document, technical bid demonstrating BIS/IS 11188 compliance, and OEM authorization if required. Include installation capability details and warranty terms as per typical banking equipment procurements.

What are the technical standards for vault doors in this bid?

Doors must be BIS-tested and IS 11188 compliant; include mounting, bolt configuration, thickness specifications, and resistance to drilling/oxy torch. Ensure compression mechanism and optional time lock are addressed; provide dimensions including max/min height and width per the tender's data.

When is the delivery timeline for the Odisha vault door procurement?

Delivery terms follow the option clause: quantity variations up to 25%; base delivery period set by contract with a minimum extension period of 30 days. Exact delivery dates are determined at contract award and subsequent orders.

What is the role of BIS certification in this vault door tender?

BIS certification is mandatory for the door; the product must pass BIS testing and IS 11188 requirements. Bidders should provide BIS-compliant documentation and ensure ongoing compliance for installation in banking premises.

What are the minimum scalability terms for quantity changes in this bid?

The purchaser can adjust quantity by up to 25% at the time of contract and during currency. Adjustments trigger extended delivery time calculated as (increased/original quantity) × original delivery period, with a minimum of 30 days.

Similar Tenders

5 found
Urgent

Bank Of Baroda Safe Deposit Locker Cabinet Procurement Chennai Tamil Nadu 2014 IS 5244 BIS Marked

Bank Of Baroda

📍 CHENNAI, TAMIL NADU

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

Bank Of Baroda Safe Deposit Locker Cabinet Tender Chennai Tamil Nadu IS 5244 2014 BIS 2025

Bank Of Baroda

📍 CHENNAI, TAMIL NADU

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

Safe Deposit Locker Cabinets (V2) as per IS 5244

State Bank Of India (sbi)

📍 Raigarh, CHHATTISGARH

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

Safe Deposit Locker Cabinets (V2) as per IS 5244

State Bank Of India (sbi)

📍 Raigarh, CHHATTISGARH

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

Punjab National Bank Safe Deposit Locker Cabinets tender Saharanpur UP 5244 V2 IS 5244 2025

Punjab National Bank

📍 SAHARANPUR, UTTAR PRADESH

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM