GEM

Andrew Yule And Company Limited Zero Speed Switch with Controller Tender Nadia West Bengal 2240 MM Dia BAB-42 Fan 2025

Bid Publish Date

20-Nov-2025, 10:11 am

Bid End Date

04-Dec-2025, 11:00 am

Bid Opening Date

04-Dec-2025, 11:30 am

Progress

Issue20-Nov-2025, 10:11 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

3

Bid Type

Two Packet Bid

Categories 3

Tender Overview

Andrew Yule And Company Limited invites bids for a ZERO SPEED SWITCH WITH CONTROLLER, intended for a 2240 MM DIA BAB-42 COMBUSTION AIR FAN, to be delivered in NADIA, WEST BENGAL 741101. The BOQ shows no listed items, and the exact quantity/estimated value are not disclosed. The buyer reserves a +/- 25% quantity variation and extended delivery time based on the original period, with a minimum added time of 30 days. Bidders should align with the ATC terms on delivery flexibility and contract quantity adjustments. The opportunity relies on compliance with standard procurement procedures under the Department Of Heavy Industry framework.

Technical Specifications & Requirements

  • Product category: ZERO SPEED SWITCH WITH CONTROLLER for a 2240 MM DIA BAB-42 combustion air fan, to be delivered complete in all respects.
  • No explicit technical parameters or performance specs are published in the tender data.
  • The ATC imposes an option clause allowing order quantity adjustments up to 25% during contract and during the currency of the contract, with delivery period adjustments calculated as: (additional quantity/original quantity) × original delivery period, with a minimum 30 days; extension allowed up to the original delivery period.
  • No BOQ items are listed, and no start/end dates or estimated value are provided.
  • Respondents should ensure readiness to supply a complete, ready-to-install switch with controller for the specified fan, while planning for potential quantity fluctuations and extended delivery timelines.

Terms, Conditions & Eligibility

  • EMD: Not specified in the tender terms.
  • Delivery: Delivery period starts from the last date of the original delivery order; additional time formula applies with a minimum 30 days.
  • Quantity variation: Purchaser may increase or decrease quantity by up to 25% at contract placement and during currency at contracted rates.
  • ATC compliance: Bidders must comply with the stated option clause and delivery-time calculations.
  • Documents / Eligibility: Specific documentation requirements are not enumerated in the provided terms; bidders should prepare standard tender documents as per Department of Heavy Industry guidelines.

Key Specifications

  • Product/service names: ZERO SPEED SWITCH WITH CONTROLLER

  • Category: Electrical/controls for a 2240 MM diameter BAB-42 combustion air fan

  • Estimated value: Not provided

  • EMD amount: Not provided

  • Delivery: Per ATC delivery-extension formula with minimum 30 days

  • Standards: Not specified in tender data

  • Warranty/AMC: Not specified

Terms & Conditions

  • Option clause allows +/-25% quantity variation at contract and during currency

  • Delivery period adjustments follow the formula with a 30-day minimum

  • EMD and exact documents are not specified; bidders should rely on standard T&Cs

  • No BOQ items or start/end dates available in the data

Important Clauses

Payment Terms

Not specified in the tender data; standard government procurement terms apply per T&C

Delivery Schedule

Delivery starts from the last date of the original order; additional time = (additional quantity/original quantity) × original delivery period, minimum 30 days

Penalties/Liquidated Damages

Not specified in the provided data; consult ATC for any LD clauses

Bidder Eligibility

  • Eligibility aligned to Department Of Heavy Industry procurement norms

  • Experience in supplying electrical controls/switches for large-diameter fans

  • Compliance with local GST/PAN requirements and standard bid documents

Past Similar Tenders (Historical Results)

5 found

PRE PACKAGE OF FASTENERS FOR 1550 MM DIA. SI. BAB-42 FD FAN, COMPLETE IN ALL RESPECT AS PER PART LI

Andrew Yule And Company Limited

NADIA, WEST BENGAL

Posted: 28 January 2025
Closed: 7 February 2025
GEM

PRE PACKAGE OF FASTENERS FOR 1235 MM DIA. SI. BAB-42 FAN, COMPLETE IN ALL RESPECT AS PER PART LIST

Andrew Yule And Company Limited

NADIA, WEST BENGAL

Posted: 22 July 2025
Closed: 12 August 2025
GEM

PIN BUSH SPACER TYPE COUPLING FOR 1420 MM DIA. SI. BAB-65/2 FD FAN, PARAMETERS: (i) SPEED -1480 RPM

Andrew Yule And Company Limited

NADIA, WEST BENGAL

Posted: 22 August 2025
Closed: 9 September 2025
GEM

(10% FASTENERS FOR COMMISSIONING SPARE) PRE PACKAGE OF FASTENERS FOR 2455 MM DIA. SI. BAB-24 PA FAN

Andrew Yule And Company Limited

NADIA, WEST BENGAL

Posted: 27 August 2025
Closed: 10 September 2025
GEM

PRE PACKAGE OF FASTENERS FOR 1460 MM DIA. SI. BAB-92 FD FAN, COMPLETE IN ALL RESPECT AS PER PART LI

Andrew Yule And Company Limited

NADIA, WEST BENGAL

Posted: 10 July 2025
Closed: 31 July 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate (if applicable)

2

PAN card

3

Experience certificates (relevant to electrical/controls for fans)

4

Financial statements or turnover details (if requested in standard T&Cs)

5

EMD/Security deposit documentation (if specified elsewhere)

6

Technical bid documents (compliance with zero speed switch with controller)

7

OEM authorizations (if applicable to the switch/controller

Frequently Asked Questions

Key insights about WEST BENGAL tender market

How to bid on zero speed switch tender in Nadia West Bengal 2025?

Bidders should submit standard tender documents, ensure compliance with the ATC option clause, and prepare for quantity variation up to 25%. While EMD is not specified, align with typical Department of Heavy Industry protocols and provide complete controller for 2240 mm diameter BAB-42 fan.

What documents are needed for the Nadia fan controller tender 2025?

Prepare GST certificate, PAN, experience certificates, financial statements, and technical bid materials. OEM authorizations may be required if the switch/controller is sourced from an OEM. Since EMD is not specified, confirm with the tendering authority and attach standard bid documents.

What are the delivery terms for the fan switch tender in West Bengal?

Delivery begins from the last date of the original delivery order. If quantities are increased, the additional time is calculated as (additional quantity/original quantity) × original delivery period, with a minimum of 30 days and extension up to the original period.

Are there any technical standards for the zero speed switch tender 2025?

No explicit standards are published in the tender data. Bidders should rely on organization-specific internal standards and standard electrical control practice, ensuring complete installation-ready switch/controller for the 2240 mm diameter BAB-42 fan.

What is the eligibility criteria for the Nadia procurement of fan controls?

Eligibility includes experience in supplying similar electrical controls for industrial fans, valid GST/PAN, and capability to deliver complete switch assemblies. Follow standard T&Cs and ATC terms; ensure compliance with quantity variation and delivery formula.

How to verify quantity variation clauses for this tender in West Bengal?

The purchaser may increase or decrease quantity up to 25% at contract placement and during currency at contracted rates. Ensure your bid accounts for possible adjustments and plan production capacity and lead times accordingly.

What is the scope of supply for the zero speed switch with controller?

Scope is the zero speed switch with controller suitable for a 2240 mm diameter BAB-42 combustion air fan, delivered complete in all respects. No BOQ items are listed; bidders should ensure compatibility with the specified fan model and complete installation-ready equipment.