GEM

Uranium Corporation Of India Limited Tyre Size 6.50x10 PR Tender East Singhbhum Jharkhand 2025

Bid Publish Date

08-Nov-2025, 9:56 am

Bid End Date

29-Nov-2025, 3:00 pm

Bid Opening Date

29-Nov-2025, 3:30 pm

Progress

Issue08-Nov-2025, 9:56 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

18

Category

Tyre Size 6.50 X 10 10 PR

Bid Type

Two Packet Bid

Key Highlights

  • CRITICAL brand/OEM context: none specified; ensure tyre/tube/flap sizes match 6.50 X 10 PR standards
  • Technical standards or certifications: not specified; bid requires certificate uploads per ATC/Corrigendum
  • Special clauses: option clause allows ±25% quantity adjustment; extended delivery time formula
  • Eligibility: supply-of-goods only; delivery within extended periods; no subcontracting without buyer consent
  • Warranty/AMC: not specified
  • Penalties/LD: termination rights for non-delivery or breach; conditions listed in terms
  • Delivery/install: delivery period starts after original order; time extensions defined
  • Submission: GST responsibility on bidder; actual reimbursement rules stated

Categories 2

Tender Overview

Uranium Corporation Of India Limited invites bids for the supply of tyre size 6.50 X 10 PR, tube size 6.50 X 10 PR, and flap size 6.50 X 10 PR in the eastern Jharkhand region (East Singhbhum). The procurement scope is limited to supply of goods with no BOQ items published. The tender includes an option clause allowing up to 25% quantity adjustment and extension of delivery time with a defined calculation rule. GST applicability is bidder’s responsibility and reimbursement will follow actuals or statutory rates.

Unique terms emphasize certificate uploads for bid acceptance and non-supply-sub-contract restrictions, ensuring compliance with buyer’s risk controls.

Technical Specifications & Requirements

  • Product category: tyres, tubes, and flaps for 6.50 X 10 size vehicles; no detailed technical specs published.
  • Scope: supply-only; price must cover all cost components.
  • Delivery terms: delivery period linked to original delivery order, with potential extension based on option clause; minimum time guidance and extended duration formula provided in contract.
  • GST: bidders must determine applicability; reimbursement limited to actuals or applicable rate with a cap at quoted GST %.
  • Compliance: upload of required certificates/documents is mandatory; non-submission leads to rejection under ATC/Corrigendum terms.
  • Contract realities: no BoQ items; termination rights exist for non-performance, delivery failure, insolvency, or assignment to third parties without consent.

Terms & Eligibility

  • Quantity flexibility: purchaser may increase/decrease up to 25% of bid quantity at contract placement and during currency at contracted rates.
  • Delivery start: counts from the last date of the original delivery order; additional time follows the defined formula, with a minimum of 30 days.
  • Supply scope: strictly Only supply of Goods; no manufacturing or installation tasks.
  • GST handling: bidder bears GST; reimbursement as per actuals or applicable rates (whichever lower) up to quoted GST.
  • Certifications: failure to upload required certificates will render bid non-responsive; compliance with ATC/Corrigendum included.
  • Liability: seller remains liable jointly with any assignee/sub-contractor for contract performance; subcontracting requires prior written consent.

Key Specifications

  • Product/service names: tyre size 6.50 X 10 PR, tube size 6.50 X 10 PR, flap size 6.50 X 10 PR

  • Quantities: not specified (scope is 'Only supply of Goods')

  • Estimated value: not provided

  • Experience: not explicitly stated; refer to eligibility in terms

  • Quality/compliance: mandatory certificate uploads as per ATC/Corrigendum

Terms & Conditions

  • Quantity adjustment: up to 25% increase/decrease at contract and during currency

  • Delivery: start from last date of original delivery order; extended time calculated with formula

  • GST: bidder bears GST; reimbursement as actuals or lower of applicable rate and quoted GST

Important Clauses

Payment Terms

GST reimbursement as actuals or as per applicable rates (whichever lower); no specific payment milestone provided

Delivery Schedule

Delivery period commences from the last date of original delivery order; option clause allows extended time with a defined calculation

Penalties/Liquidated Damages

Contract termination possible for non-delivery, breach, insolvency, or assignment without consent

Bidder Eligibility

  • Supply of Goods only; no installation or manufacturing scope presumed

  • Ability to upload mandatory certificates as per bid terms

  • Compliance with GST and standard procurement norms; no subcontracting without consent

Past Similar Tenders (Historical Results)

5 found

1300008648 TYRE W/ TUBE W/ FLAPS, SIZE: 10.00-20 FRONT,1300008649 - TYRE W/ TUBE W/ FLAPS, SIZE: 10

Mangalore Refinery And Petrochemicals Limited

Posted: 25 June 2025
Closed: 11 July 2025
GEM

Tyre with Tube and flap size 10.00 x20 semi lug 16 PR,Tyre with Tube and flap size 10.00 x20 semi R

Indo Tibetan Border Police (itbp)

SONITPUR, ASSAM

Posted: 17 May 2025
Closed: 7 June 2025
GEM

TYRE TUBE- 4.50 X 10 8PR,TYRE -TUBE 145/80 R12

Hindustan Aeronautics Limited (hal)

NASHIK, MAHARASHTRA

Posted: 8 May 2025
Closed: 29 May 2025
GEM

Tyre size 14.00 25,Tube size 14.00 25,Flap Rust for 14.00 25,Tyre size 13.00x24,Tube size 13.00x24,

Border Road Organisation

PUNE, MAHARASHTRA

Posted: 13 September 2025
Closed: 29 September 2025
GEM

Tyre with Tube and Flap, Size: 10.00 x 20

Oil India Limited

DIBRUGARH, ASSAM

Posted: 16 May 2025
Closed: 6 June 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates (if any in similar supply)

4

Financial statements (as applicable)

5

EMD/Security deposit documentation (if required per ATC)

6

Technical bid documents confirming compliance with bid terms

7

OEM authorizations or certificates (if supplier is not OEM)

8

Certificates referenced in Buyer Added Terms and Conditions

Frequently Asked Questions

Key insights about JHARKHAND tender market

How to bid for the tyre 6.50x10 PR tender in East Singhbhum?

Bidders must upload mandatory certificates per ATC, provide tyres sized 6.50 X 10 PR (tyre, tube, flap), and submit the bid with price including all costs. The bid includes an option clause for up to 25% quantity adjustments and delivery-time calculations. GST must be calculated by the bidder with reimbursement rules as stated.

What documents are required for the tender in Jharkhand?

Required documents include GST certificate, PAN, experience certificates, financial statements, EMD documentation if applicable, technical bid, and any OEM authorizations. Certificates must align with terms; missing documents lead to bid rejection under ATC/Corrigendum terms.

What is the delivery timeline for the 6.50x10 PR tyres tender?

Delivery starts from the last date of the original delivery order; the option clause allows up to 25% additional quantity with extended delivery time calculated as (Increase/Original) × Original delivery period, minimum 30 days, and may extend up to the original delivery period.

What are the GST implications for this procurement in Jharkhand?

Bidders must determine GST applicability; the purchaser will reimburse either actual GST or the applicable rate, whichever is lower, up to the quoted GST percentage. Bid prices should reflect these nuances.

What happens if the supplier breaches contract terms for this tender?

The buyer may terminate the contract in cases of material breach, inability to deliver, non-delivery/defective goods, insolvency, or assignment without consent. Termination is in writing and may trigger additional remedies per contract terms.

Can the order quantity be increased beyond 25% during the contract?

Yes, the purchaser reserves the right to increase the ordered quantity up to 25% during the currency of the contract at the contracted rates, starting from the last date of the original delivery order.

Are subcontracting or assignment allowed for this tyre supply tender?

Sub-contracting requires prior written consent of the buyer; assignment of the contract is not allowed without explicit consent. Regardless, the original seller remains jointly liable for performance.

What is the scope of supply for this procurement in Jharkhand?

Scope is strictly 'Only supply of Goods' for tyres, tubes, and flaps sized 6.50 X 10 PR; no fabrication, installation, or commissioning activities are included in this tender.

Similar Tenders

1 found
Urgent

TYRE, 1800X25-32PR F/DUMPER, MM: LW-3,TUBE, 1800X25 F/DUMPER, MM: LW-35, BEML,FLAP, 18X25 F/DUMPER,

Rourkela Steel Plant

📍 SUNDERGARH, ODISHA

⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM