RO PLANT WITH WATER COOLER (CAPACITY 150 LPH)
Indian Army
LUCKNOW, UTTAR PRADESH
Bid Publish Date
04-Jun-2026, 8:25 am
Bid End Date
25-Jun-2026, 4:00 pm
Location
Progress
Quantity
2
Bid Type
Two Packet Bid
Bharat Heavy Electricals Limited (BHEL) invites bids for an Automatic Soft Water Plant with a capacity of 2x10 M3/HR to be installed at BHEL Haridwar, Uttarakhand. The scope includes installation, commissioning, testing, operator training, and related services as part of the purchase. The contract contemplates a flexible quantity option of up to 25% more than bid quantity, with terms governing delivery extension. The project requires adherence to BHEL’s SUVIDHA portal documentation and acceptance criteria post-installation. The vendor must provide credible performance documentation and a Performance Bank Guarantee (PBG) equal to 10% of total PO value. The payment schedule bifurcates into an advance and milestone phases tied to material receipt and I&C completion, with a total payment window extending up to 90 days for Non-MSE suppliers. Unique is the explicit linkage of I&C value to installation and commissioning efficiency.
Product/Service: Automatic Soft Water Plant
Capacity: 2x10 M3/HR
Location/Site: BHEL Haridwar, Uttarakhand
I&C Value: ~10% of total material cost
Delivery Time for I&C: 45 days from first intimation
Payment Terms: 80% within 45/60/90 days; 20% + 100% I&C against PBG
PBG: 27 months validity from commissioning
Option Clause: Quantity variation up to 25% during contract period
Delivery and extension as per option clause with minimum 30 days
I&C period fixed at 45 days from first notification
PBG of 10% of PO value, valid for 27 months
80% payment within 45/60/90 days per vendor type; 20% plus 100% of I&C value against I&C certificate and 27-month PBG.
Delivery period to commence from last date of original delivery order; option clause allows 25% quantity variation with extended periods as described.
LDs applicable for delay in supply and I&C as per contract terms; timeframes align with I&C and delivery milestones.
Demonstrated experience delivering water treatment plants of similar scale
Financial stability evidenced by recent statements
Compliance with GeM SUVIDHA portal submission requirements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Automatic Soft Water Plant having Capacity 2x10 M3/HR.
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
LUCKNOW, UTTAR PRADESH
Dg Armed Forces Medical Service
PUNE, MAHARASHTRA
National Institute Of Food Technology Entrepreneurship And Management (niftem) New Delhi
SONIPAT, HARYANA
National Fertilizers Limited (nfl)
ROHTAK, HARYANA
Indian Army
ALLAHABAD, UTTAR PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST Registration certificate
PAN card
Experience certificates of similar water treatment plant deliveries
Financial statements for the last 2-3 years
EMD/Security deposit documentation
Technical bid documents specifying plant capacity 2x10 M3/HR
OEM authorizations or authorized distributor letters
Proof of installation capabilities and service network
Bidders must submit all required documents via BHEL SUVIDHA portal, attach OEM authorizations and demonstrate 2x10 M3/HR capacity; provide PBG of 10% of PO value, and follow 27-month PBG validity post-installation with I&C obligations and the 25% quantity option terms.
Submit GST, PAN, last 2-3 years’ financials, experience certificates for water treatment plant deliveries, EMD/Security, technical bid detailing 2x10 M3/HR plant, OEM authorizations, and site readiness proof for Haridwar installation.
I&C must be completed within 45 days from first intimation; installation scope includes tests and operator training; total project requires a 27-month PBG to cover warranty and liability.
Non-MSE suppliers receive 90 days for supply value payment from material receipt date, subject to non-discrepant documents and SUVIDHA upload; balance 20% after I&C certificate with 27-month PBG.
The purchaser may increase quantity up to 25% of bid quantity at contracted rates; delivery extension is calculated as (Increased quantity/Original quantity) × Original delivery period with a minimum of 30 days.
Bidders should provide ISI/ISI-marked components if specified, ensure compliance with relevant industry standards for water treatment plants, and maintain OEM authorization as part of technical bid.
Submit financial statements, experience certificates for similar water plants, EMD documentation, technical compliance, OEM authorizations, and proof of installation capability for Haridwar site readiness.
Bharat Heavy Electricals Limited (bhel)
📍 HARIDWAR, UTTARAKHAND
Directorate Of Purchase And Stores
Sail Refractory Unit
📍 BOKARO, JHARKHAND
Indian Army
Council of Scientific and Industrial Research
📍 WEST, DELHI
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS