GEM

UP Urban Development Department Self-Contained Drinking Water Coolers Tender 2025 IS 1475 V3 Q2 UP procurement

Bid Publish Date

29-Nov-2025, 4:43 pm

Bid End Date

09-Dec-2025, 5:00 pm

EMD

₹22,000

Progress

Issue29-Nov-2025, 4:43 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

9

Bid Type

Two Packet Bid

Tender Overview

Organization: Urban Development Department Uttar Pradesh (E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh). Product: Self-Contained Drinking Water Coolers (V3) as per IS 1475 (Q2). Quantity/Value: Not specified; EMD: ₹22,000. Location: Uttar Pradesh, India. The tender targets purchase of drinking water coolers for municipal deployments, with scope limited to the supply of goods. The buyer reserves flexibility to adjust quantities by up to 25% and may extend delivery times proportionally as per option clause. Unspecified start/end dates; ATC terms accompany the bid. The unique clause emphasizes delivery timing linked to the last original/extended delivery order dates and a minimum 30-day increment rule. This tender requires compliance with the IS 1475 standard for V3 coolers and includes a clear focus on supply-only procurement.

Technical Specifications & Requirements

  • Product category: Self-Contained Drinking Water Coolers (V3) under IS 1475 (Q2).
  • Standard reference: IS 1475 for drinking water coolers; V3 configuration implied by tender category.
  • Quantity notes: No BOQ items listed; scope explicitly states “Only supply of Goods.”
  • EMD details: ₹22,000 required as bid security.
  • ATC/terms: Buyer-added terms include quantity variation up to 25% and extended delivery period logic; delivery starts from the last date of the original order.
  • Activation criteria: ATC file uploaded by buyer contains additional clauses (viewable by bidders).
  • Location context: Tender pertains to Uttar Pradesh municipal provisioning and urban local bodies.
  • Special clauses: Option clause and delivery-extension mechanics to be strictly observed.
  • Delivery scope: Pure supply contract; no installation or commissioning specified in current data.

Terms, Conditions & Eligibility

  • EMD: ₹22,000 required; payment terms not specified in available data.
  • Delivery: Delivery timeline linked to original/extended orders; additional time formula: (increased quantity ÷ original quantity) × original delivery period, min 30 days.
  • Quantity flexibility: Up to 25% increase/decrease permitted.
  • Scope: Only supply of goods; no service/installation included per current terms.
  • Documentation: Bidder must comply with ATC terms uploaded by buyer; GST/PAN and other standard bid docs likely required though not detailed here.
  • Eligibility signals: IS 1475 compliance presumed; no explicit experience criteria disclosed in available data.
  • Contractual posture: Clauses are Buyer Added Terms; bidders must align with provided ATC and option clause.

Key Specifications

  • Product/service names: Self-Contained Drinking Water Coolers (V3)

  • Standards: IS 1475 (V3) reference

  • Quantity/Scope: Supply of Goods only (no BOQ items available)

  • EMD: ₹22,000

  • Delivery terms: base delivery period with option for 25% quantity variation

  • ATC: Buyer-uploaded terms accompanying tender

  • Location: Uttar Pradesh municipal deployments

  • Brand/OEM requirements: Not explicitly specified in data

Terms & Conditions

  • EMD of ₹22,000 is mandatory for bid submission

  • Quantity may be adjusted up to 25% by purchaser

  • Delivery period linked to original/extended orders with minimum 30 days increment

  • Scope limited to supply of drinking water coolers; no installation

  • IS 1475 (V3) compliance expected; ATC governs bidder obligations

Important Clauses

Payment Terms

Not specified in data; ATC may define terms in uploaded document

Delivery Schedule

Delivery starts from last date of original delivery order; extended period follows option formula

Penalties/Liquidated Damages

Not specified in data; refer to ATC for any LD provisions

Bidder Eligibility

  • Must meet IS 1475 V3 standard for drinking water coolers

  • Submit ₹22,000 EMD as bid security

  • Supply-only contract for drinking water coolers in Uttar Pradesh

Past Similar Tenders (Historical Results)

5 found

Self - Contained Drinking Water Coolers (V3) as per IS 1475

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

BAHRAICH, UTTAR PRADESH

Posted: 23 September 2025
Closed: 3 October 2025
GEM

Self - Contained Drinking Water Coolers (V3) as per IS 1475

N/a

RAIPUR, CHHATTISGARH

Posted: 15 October 2025
Closed: 29 October 2025
GEM

Self - Contained Drinking Water Coolers (V3) as per IS 1475

Dang Collectorate

THE DANGS, GUJARAT

Posted: 10 September 2025
Closed: 20 September 2025
GEM

Self - Contained Drinking Water Coolers (V3) as per IS 1475

Rail Coach Factory Kapurthala

KAPURTHALA, PUNJAB

Posted: 12 August 2025
Closed: 3 September 2025
GEM

Odisha Power Generation Corporation Limited Self-Contained Drinking Water Coolers IS 1475 UV-based Aqua guard Pro Pure chill 80PSS Tender 2025

Odisha Power Generation Corporation Limited

JHARSUGUDA, ODISHA

Posted: 4 November 2025
Closed: 14 November 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

EMD payment receipt or proof

4

Technical bid documents demonstrating IS 1475 compliance (V3)

5

OEM authorization if applicable

6

Experience certificates or past supply proof (if required by ATC)

7

Financial statements or turnover evidence (if requested elsewhere in T&C)

8

Any qualification certificates referenced in ATC

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What documents are required for the drinking water cooler tender in UP 2025?

Bidders must submit GST certificate, PAN, EMD ₹22,000, and technical bid documents demonstrating IS 1475 V3 compliance. OEM authorizations and experience certificates should be provided if requested by ATC. Ensure the ATC file is viewed for any additional requirements before submission.

How is quantity variation managed in the UP IS 1475 cooler tender 2025?

The purchaser may increase or decrease the bid quantity by up to 25% at contract placement and during currency at contracted rates. Delivery timing shifts follow the formula with a minimum 30 days; ensure readiness to handle variable order volumes.

What is the EMD amount for the UP drinking water cooler procurement?

The EMD amount is ₹22,000. Submit payment as specified in the tender documents (DD/online per ATC). Ensure the EMD is valid for the bid validity period and accompanied by the corresponding bid reference.

Which standard applies to the water cooler specification in UP tender?

The tender requires compliance with IS 1475 for drinking water coolers, specifically the V3 variant (Q2). Bid documents should demonstrate conformity to this standard, including safety and performance aspects.

When is the delivery schedule activated for the UP cooler tender?

Delivery starts from the last date of the original delivery order. If extended, the added time is calculated by the given formula, with a minimum extension of 30 days to accommodate increased quantity or extended orders.

What is the scope of supply for this UP cooler tender?

Scope explicitly states Only supply of Goods. There is no installation or commissioning included in the stated terms; bidders should plan for delivery and handover to the purchasing agency.

Where can bidders view the ATC terms for this UP procurement?

The ATC document uploaded by the buyer contains all non-standard clauses. Bidders must click the ATC link in the tender portal to review specific terms, conditions, and any additional compliance requirements.

What is the organization and location for this IS 1475 tender?

The procurement is led by the Urban Development Department Uttar Pradesh for E-municipalities across Uttar Pradesh. This is a municipal equipment supply tender, focusing on self-contained drinking water coolers compliant with IS 1475.

Similar Tenders

5 found

Self - Contained Drinking Water Coolers (V3) as per IS 1475

Rail Coach Factory Kapurthala

📍 KAPURTHALA, PUNJAB

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

Self - Contained Drinking Water Coolers (V3) as per IS 1475

Rail Coach Factory Kapurthala

📍 KAPURTHALA, PUNJAB

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

Rourkela Steel Plant Self-Contained Drinking Water Coolers Tender Odisha ISI 150L RO+UV 2025

Rourkela Steel Plant

📍 SUNDERGARH, ODISHA

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Rural Development Department Bihar Self-Contained Drinking Water Coolers Tender IS 1475 V3 2025

Rural Development Department

📍 SAMASTIPUR, BIHAR

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Self - Contained Drinking Water Coolers (V3) as per IS 1475

Kamdhenu University

📍 NAVSARI, GUJARAT

Est: ₹3.8 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM