This government tender offers a unique opportunity for electrical contractors and infrastructure companies to participate in the erection and stringing of a 66KV transmission line in Himatnagar, Gujarat. Managed by Gujarat Energy Transmission Corporation Limited (GETCO), this project aims to strengthen regional power transmission capacity, ensuring reliable electricity supply. The tender involves installation on existing towers with high safety and technical standards, covering approximately 6.250 km of overhead line. Bidders must meet strict eligibility criteria, including technical experience, financial stability, and valid licenses. The project has an estimated value of INR 26,10,468, with a bid security of INR 26,105. The process includes detailed technical and financial evaluation, with deadlines clearly specified. This is an excellent opportunity for companies specializing in power infrastructure, electrical engineering, and construction services to showcase their expertise and contribute to regional development. Ensure compliance with all tender conditions and submit your bid before the deadline to participate in this significant power transmission project in Gujarat.
Government Tender for Erection & Stringing of 66KV Transmission Line in Himatnagar
Posted
28 Oct 2025, 12:30 pm
Deadline
18 Nov 2025, 10:30 am
EMD
₹26,105
Value
₹26,10,468
Location
Progress
Tender Type
Open
Sector
Power and Energy
Tender Fee
₹1,180
Contract Form
Works
Completion Period
150 Days
Currency Type
Single
Scope Of Work
The scope of work includes:
- Erection and stringing of 66KV transmission line from Motiadraj to Valol substation.
- LILO connection at 66KV Uvarsad substation on existing D/C Panther tower.
- Installation of Panther conductor in HOT LINE condition.
- Ensuring proper tensioning and alignment of conductors.
- Testing and commissioning of the transmission line.
The key deliverables are:
- Complete erection of the transmission line within the stipulated completion period.
- Proper installation and connection at Uvarsad substation.
- Documentation of all activities including test reports.
Sequential Process:
- Site preparation and foundation work.
- Erection of towers and conductors.
- Stringing of conductors and connection at substations.
- Testing and commissioning.
- Final handover with documentation.
| Specification | Details | 
|---|---|
| Line Length | Approx. 6.250 km | 
| Voltage Level | 66KV | 
| Tower Type | Panther D/C towers | 
| Conductor | Panther conductor | 
| Condition | HOT LINE | 
Bidder must ensure compliance with all technical and safety standards as per project specifications.
Technical Specifications
The technical specifications include:
| Parameter | Requirement | 
|---|---|
| Tower Material | Steel towers conforming to IS standards | 
| Conductor Type | Panther conductor with specified diameter and insulation | 
| Line Length | Approx. 6.250 km | 
| Insulation Level | 66KV standard | 
| Installation Method | Erection on pre-constructed foundations | 
| Testing | Insulation resistance, continuity, and tension tests | 
Sequential Procedures:
- Site survey and foundation work.
- Tower erection and alignment.
- Conductor stringing with tensioning.
- Connection and commissioning.
Bidder must adhere to safety standards and quality norms specified by GETCO.
Financial Requirements
The estimated project cost is approximately INR 26,10,468. Bidders must submit a bid security (EMD) of INR 26,105 along with their proposal. The bid offer must be valid for 180 days from the bid submission deadline. Payment terms include:
- 10% advance against work order.
- Remaining payments linked to project milestones.
- Final payment after successful commissioning.
Cost breakdown:
| Item | Estimated Cost | 
|---|---|
| Material | INR 12,00,000 | 
| Labour | INR 8,00,000 | 
| Equipment | INR 4,00,000 | 
| Miscellaneous | INR 2,10,468 | 
All payments are subject to submission of valid invoices and completion certificates as per contract terms.
AI-Powered Bidder Prediction
Companies most likely to bid
Unlock Bidder Insights
AI predictions on likely bidders
   
Eligibility Criteria
 - ✓ Must have valid GETCO registration.
- ✓ Must possess GST registration and PAN card.
- ✓ Financial stability with minimum turnover as specified.
- ✓ Experience in similar transmission line projects.
- ✓ Valid electrical license.
- ✓ Submission of Bank Solvency Certificate.
- ✓ Submission of Work Completion Certificates for relevant projects.
| Criterion | Minimum Requirement | 
|---|---|
| Annual Turnover | INR 10,00,000 (for last 3 years) | 
| Experience | At least 1 similar project completed in last 5 years | 
| Financial Assets | Liquid assets as per CA certificate | 
| Certification | Valid electrical license and NCLT certificate | 
| Documentation | Complete technical and financial documents as per tender guidelines | 
   
Bidding Process
  Process Timeline
18-11-2025 16:05
18-11-2025 16:10
Required Forms
TECHNICAL
i Agree
User Defined Template-Standard
FIRM DETAILS
User Defined Template-Standard
EXPERIENCE DETAILS
User Defined Template-Standard
TECHNICAL BID
User Defined Template-Standard
TENDER FEE & EMD DETAILS
User Defined Template-Secured
COMMERCIAL
Percentage Rate
Library-Secured
Required Documents
Stage - TECHNICAL STAGE
GETCO REGISTRATION Document
RequiredGST Registration Number Documents
RequiredProvident Fund Code Number Documents
RequiredPAN Number Document
RequiredBank Solvency Certificate
RequiredScan of Tender Fee Amount Online payment receipt
RequiredScan of EMD Amount Online payment receipt
RequiredDuly Signed and Attested Integrity Pact.
RequiredIncome Tax Return of Last Three Financial Years
RequiredProfit Loss Accounts of Last Three Financial Years
RequiredBalance sheet of Last Three Financial Years
RequiredPartnership deed and Proprietorship deed and Power of Atternoy
RequiredDuly Filled and signed of Annexure 1 to 8
RequiredDuly Filled Signed of Annexure 14
RequiredWork Oder Copy with Schedule B
RequiredWork completion certificate in Form No 3 A only as Per Qualification Requirement
RequiredElectrical License Documents
RequiredMinimum Average Annual Turnover (MAAT) of best 3 years out of last 5 Years > Estimated Tender Amount (CA Certificate required)
RequiredLiquid Asset (CA Certificate required)
RequiredPositive Net worth of last 3 years (CA Certificate required)
RequiredNCLT Certificate
RequiredIf bidder having experience in Sub-Contract, please furnish the authorization letter form principal order placing authority)
RequiredFrequently Asked Questions
What is the scope of this government tender?
This tender involves erection and stringing of a 66KV transmission line from Motiadraj to Valol substation, including LILO connection at Uvarsad substation on existing D/C Panther towers, with a length of approximately 6.250 km. The scope covers tower erection, conductor installation, testing, and commissioning, aimed at enhancing regional power transmission infrastructure.
What are the key eligibility criteria for bidders?
Bidders must possess valid GETCO registration, GST registration, and electrical license. They should demonstrate financial stability with a minimum turnover of INR 10,00,000 for the last 3 years, and have experience in similar projects. Submission of bank solvency certificates, work completion certificates, and comprehensive technical and financial documents is mandatory.
How can I participate in the bidding process?
Participants should download the tender document online, prepare technical and financial bids, and submit electronically before the deadline. Bidders must attend the bid opening scheduled on 18-11-2025 at 4:00 PM. Ensure all mandatory documents are uploaded as per the checklist, and adhere to the specified timelines.
What is the estimated value of this project?
The approximate estimated cost of the project is INR 26,10,468, with an earnest money deposit (EMD) of INR 26,105. The project budget includes material, labor, equipment, and miscellaneous expenses. Payment terms include advance, milestone-based payments, and final settlement post successful completion.
What technical standards must the project meet?
The project requires steel towers conforming to IS standards, Panther conductors, and installation in HOT LINE conditions. All equipment and installation procedures must adhere to industry safety norms and GETCO specifications. Testing includes insulation resistance, tension, and continuity checks to ensure reliable power transmission.
Download FREE!
Access all tender documents at no cost
    Documents  1  
 2025-26 HTC 79 Tech Bid.pdf
TENDER_DOCUMENT
2025-26 HTC 79 Tech Bid.pdf
TENDER_DOCUMENT