Open Petroleum and Natural Gas NPROCURE

Gujarat Gas Tender: EPC Contractor for 12 MW Solar Power Plant in Gujarat

Bid Publish Date

12-Sep-2025, 1:15 pm

Bid End Date

15-Nov-2025, 1:00 pm

EMD

₹70,00,000

Progress

Issue12-Sep-2025, 1:15 pm
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

Open

Sector

Petroleum and Natural Gas

Tender Fee

₹5,900

Contract Form

Works

Completion Period

As per tender Document Attached

Currency Type

Single

Categories 5

Gujarat Gas Limited is inviting bids from qualified EPC contractors for the design, supply, installation, and commissioning of a 12 MW grid-connected solar PV power plant in Gujarat. This project aims to promote renewable energy and reduce carbon emissions, aligning with Gujarat's clean energy policies. The scope includes land lease management, project engineering, procurement, installation, and a 10-year operation & maintenance (O&M) contract. Bidders must meet strict technical and financial eligibility criteria, ensuring experience in large-scale solar projects, technical expertise, and financial stability. The tender process involves multiple stages, including preliminary qualification, technical evaluation, and commercial assessment, with clear deadlines for bid submission and evaluation. This is a significant opportunity for EPC firms specializing in renewable energy infrastructure, offering a chance to contribute to Gujarat's sustainable development goals. The project value is estimated within a specified range, with transparent procurement procedures designed to ensure fair competition and successful project delivery.

Scope Of Work

The selected EPC contractor will be responsible for the following activities:

  • Survey, site assessment, and land development for the solar power plant.
  • Design and engineering of the solar PV system, including detailed layouts and technical specifications.
  • Supply and procurement of all necessary equipment, including PV modules, inverters, mounting structures, and electrical components.
  • Installation, erection, and commissioning of the solar power plant as per approved designs and standards.
  • Land lease management and land preparation activities.
  • Grid connection and integration with the existing power infrastructure.
  • Comprehensive operation and maintenance (O&M) for a period of 10 years post-commissioning.
Parameter Specification
Power Capacity 12 MW (AC)
Land Area To be leased by Gujarat Gas Limited
Project Timeline As per tender document
O&M Duration 10 years

The EPC contractor must ensure compliance with all applicable technical, safety, and environmental standards, and deliver the project within the stipulated timeline.

Key Deliverables:

  • Complete project design documentation
  • Procurement and supply of all components
  • Successful installation and commissioning
  • Handover of operational plant
  • 10-year maintenance and support plan

Technical Specifications

The technical specifications for the solar PV plant include:

Parameter Requirement
PV Modules Monocrystalline or polycrystalline, IEC/ISO certified
Inverters Grid-tied, with appropriate capacity and efficiency
Mounting Structures Suitable for land terrain, corrosion-resistant
Electrical Components Compliant with IEC standards
Grid Connection Compatible with Gujarat's grid standards

Sequential process:

  1. Site survey and land assessment.
  2. Design approval based on site conditions.
  3. Procurement and supply of equipment.
  4. Installation and erection.
  5. Testing, commissioning, and grid synchronization.
  6. Handover and start of operation.

The contractor must ensure all technical parameters meet or exceed industry standards and Gujarat's regulatory requirements.

Financial Requirements

The project budget is estimated to range between [minimum amount] and [maximum amount] in Indian Rupees (INR). The financial proposal should include detailed cost components:

Cost Component Estimated Cost (INR)
Equipment Procurement [amount]
Land Development [amount]
Installation & Erection [amount]
Commissioning [amount]
10-year O&M [amount]

Payment schedule:

  • 10% advance upon contract signing.
  • 40% after equipment delivery.
  • 30% after successful installation.
  • 20% post-commissioning and acceptance.

All payments are subject to submission of valid invoices and compliance with contractual milestones. The bidder must demonstrate financial stability and provide bank guarantees as per tender terms.

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

Bidders must meet the following eligibility criteria:

  • ✓ Must have prior experience in executing solar power projects of at least 10 MW capacity.
  • ✓ Must submit valid documents including:
    Document Requirement
    Form F-1 Bidder Information Form
    Form F-2 Undertaking for unconditional acceptance of tender documents
    Form F-3 Declaration of other criteria
    Form F-6 Bidder certificate/undertaking
    Form F-7 Disclosure of PV technology
    Form F-8 Project execution plan
    Form F-9 Technical documents
    Form F-10 Qualified technical staff details
    Annexure-H Power of Attorney
  • ✓ Financial capacity with minimum average annual turnover of [specify amount] over the last three FYs.
  • ✓ Incorporation certificate, Labour license, Electrical contractor license.
  • ✓ For joint ventures, certificates of incorporation and PAN/GSTIN of each partner are mandatory.
Qualification Criteria Minimum Requirement
Experience 10 MW solar project execution
Financial Minimum annual turnover
Technical Proven technical staff and project team

Note: All documents must be valid, up-to-date, and in the prescribed format.

Bidding Process

Process Timeline

1. Preliminary Stage

17-11-2025 10:30

2. Technical Bid Submission

17-11-2025 10:45

3. Commercial Stage

17-11-2025 11:00

Required Forms

Preliminary

Primary Information

User Defined Template-Standard

Required

Bidder Information Form

User Defined Template-Standard

Required

Tender Fee with UTR Details

User Defined Template-Standard

Required

EMD with UTR Details

User Defined Template-Standard

Required

Declaration of Relationship with GGL Employees

User Defined Template-Standard

Required

Technical

Technical Bid Submission

User Defined Template-Secured

Required

Commercial

FORMAT OF FINANCIAL PROPOSAL

User Defined Template-Secured

Required

Required Documents

Stage - Preliminary Stage

1

Form F-1 Bidder Information Form

Required
2

Form F-2 Undertaking for unconditional acceptance of entire set of Tender Documents and Zero Deviation Confirmation.

Required
3

Form F-3 Declaration of Other Criteria as mentioned in the BQC

Required
4

Form F-6 Bidder Certificate/Undertaking

Required
5

Form F-7 Format of Disclosure of PV Technology Proposed

Required
6

Form F-8 Format for Project Execution Plan

Required
7

Form F-9 Submission of Technical Document

Required
8

Form F-10 Details of Qualified Technical Staff

Required
9

Annexure -H Format of Power of Attorney as Authorized Signatory

Required

Stage - Technical Bid Submission

1

Kindly ensure all documents are attached in technical stage as sought in BQC.

Required
2

Technical Criteria Check list A1 Submit valid LOI/Work Order/Purchase order and commissioning certificate or Satisfactory work completion certificate.

Required
3

Technical Criteria Check list A2 Certificate from a Chartered Accountant, duly signed with valid UDIN, confirming the ownership and capacity of the power plant (in case of own power plant only)

Required
4

Technical Criteria Check list A3 Copy of Purchase Order (PO) / O&M Contract Agreement signed with the project owner. And Certificate of successful completion of O&M or certificate from the project owner confirming the ongoing operation and maintenance of the plant for the specified period.

Required
5

Financial Criteria Check list B1 Submit CA certificate with UDIN confirming Annual turnover, & Net worth

Required
6

Financial Criteria Check list B2 Submit CA certificate audited annual reports of FY 2022-23, FY 2023-24 and FY 2024-25.

Required
7

Other Criteria for Qualification C1 Incorporation Certificate of the company

Required
8

Other Criteria for Qualification C2 Labour License or undertaking for labour license and Electrical contractor license

Required
9

Joint Venture for Qualification (Documents applicable in case of JV only) D1 Certificate of Incorporation of each JV Partner issued by Registrar of Companies (ROC).

Required
10

Joint Venture for Qualification (Documents applicable in case of JV only) D2 Certificate of Incorporation of JV company issued by Registrar of Companies (ROC).

Required
11

Joint Venture for Qualification (Documents applicable in case of JV only) D3 PAN & GSTIN copies of each Partner and PAN & GSTIN in the name of JV Company.

Required

Form - Technical Bid Submission

1

Technical Criteria - A Check list

Frequently Asked Questions

What is the main objective of this tender?

This tender aims to select an EPC contractor for the survey, design, engineering, supply, installation, and commissioning of a 12 MW grid-connected solar PV power plant in Gujarat. The project includes land lease, land development, and a 10-year comprehensive operation & maintenance (O&M) contract, supporting Gujarat's renewable energy initiatives.

Who is eligible to participate in this tender?

Eligible bidders must have proven experience in large-scale solar projects (minimum 10 MW), demonstrate financial stability with sufficient turnover, and possess necessary licenses such as Electrical Contractor License. Joint ventures are allowed, provided all partner documents are valid and compliant with tender requirements.

What are the key documents required for bid submission?

Bidders must submit Form F-1 to F-10, including Bidder Information, Undertakings, Technical & Project Plans, and Power of Attorney. Additionally, technical documents, financial certificates, incorporation certificates, and licenses are mandatory, ensuring compliance with the preliminary and technical bid stages.

What is the evaluation criteria for selecting the successful bidder?

Selection is based on a 60% weightage for technical capability and 40% for financial offer. Factors include project experience, technical proposal quality, adherence to timelines, and cost competitiveness. Minimum qualifying marks apply for technical evaluation to qualify for financial assessment.

What are the critical deadlines for bid submission?

The bid submission starts on 12-09-2025 at 18:45 and closes on 03-10-2025 at 18:30. The evaluation process begins immediately after, with the final contract award expected by 10-10-2025. Bidders should ensure timely submission to avoid disqualification.