The Indian Army, Department Of Military Affairs, invites bids for a multi-item supply package including epoxy putty, iron sheets, foam sheets (including 1.5 inch foam), square and round steel sections, cutting wheels, grinders, self-tapping screws, plywood, SR screws, silicon elastomer gum, red oxide and related hardware. The scope covers Supply, Installation, Testing, Commissioning of goods, and operator training, with potential unit-level delivery to Batote, Ramban, Jammu & Kashmir. The contract allows quantity variation up to 25% at bid/contracted rates and requires delivery following the original and extended timelines. Turnover criteria apply for the last three financial years and must be evidenced via audited statements or CA certification. The address for delivery/installation is 16/18 840 (I) FD WKSP COY EME, PIN 906840, C/o 56 APO. This procurement emphasizes end-to-end supply chain, installation, commissioning, and statutory clearances if any. Unique aspects include a flexible quantity clause and mandatory bidder proof of financial stability.
Technical Specifications & Requirements
- Product categories: Epoxy putty, galvanized iron/steel sheets, foam sheets (2 sizes: 1.5 inch and standard), square/rectangular steel sections (1 inch, 1.5 inch, 3x3 angle), cutting wheels (4, 5, 14 inch), grinder wheels, self screws (1, 2 inch), plywood 5 mm, SR 98 screws, black screws, nozzles, silicon elastomer gum, red oxide, welding rods.
- Delivery/installation: Supply, installation, testing, commissioning, operator training, and statutory clearances if required; delivery address as above; option clause governs up to 25% quantity variation per contract and during currency.
- Financials: Minimum average annual turnover as per bid document; evidence via audited statements or CA certificate; if company is under 3 years, turnover is calculated on post-incorporation years.
- Scope of supply: All-inclusive bid price, including installation and commissioning.
Terms, Conditions & Eligibility
- EMD: Not explicitly specified in provided data; bidders must refer to bid document for exact amount.
- Delivery timeline: As per option clause and original delivery order dates; additional time formula provided with minimum 30 days.
- Documents: PAN, GSTIN, cancelled cheque, EFT mandate; turnover evidence via audited statements or CA certificate; vendor code creation documents as per ATC.
- Eligibility: Three-year turnover requirements; experience in similar supply; capacity to install and commission; stability and financial health demonstrated via financial documents.
- Payment: Terms not fully specified here; refer to ATC for detailed payment schedule and milestones; scope includes training and statutory clearances if required.