GEM

Tender Notice for Continuous Cardiac Output Monitor in LUCKNOW, UTTAR PRADESH

Bid Publish Date

15-Oct-2025, 12:11 pm

Bid End Date

05-Nov-2025, 12:00 pm

Bid Opening Date

05-Nov-2025, 12:30 pm

EMD

₹35,000

Value

₹35,00,000

Progress

Issue15-Oct-2025, 12:11 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

N/a invites bids for Continuous Cardiac Output Monitor (Q2) in LUCKNOW, UTTAR PRADESH. Quantity: 1. Submission Deadline: 05-11-2025 12: 00: 00. Submit your proposal before the deadline.

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
PRODUCT INFORMATION Method of Measurement Non invasive Bioreactance, Minimally Invasive
PRODUCT INFORMATION Device Compatible with Swan Ganz Catheter or Dedicated Oximetry Catheter, Arterial line sensor, Bioreactance Sensor
PRODUCT INFORMATION Parameters Measured Cardiac Output, Cardiac Index, Stroke volume, Systemic Vascular Resistance or Total Peripheral Resistance, Total Peripheral Resistance Index, Stroke Volume Variation, Cardiac Power, Oxygen delivery Index, Total thoracic fluid content, Continuous arterial pressure, Continuous Right Ventricular Ejection Fraction (RVEF), Continuous Right Ventricular End Diastolic Volume (RVEDV, RVEDVI), Systemic Vascular Resistance and index (SVR, SVRI), Pulmonary Vascular Resistance (PVR)
PRODUCT INFORMATION Protocol Wizards Passive Leg-Raise wizard, Bolus Protocol wizard
PRODUCT INFORMATION Data Trend storage > 48 Hours, > 72 Hours
PRODUCT INFORMATION Minimum Battery Back Up (in Hours) 1 Hour, 2 Hour, 3 Hour Or higher
WARRANTY Warranty in years (Option of comprehensive warranty is available through bidding only, which if opted will supersede normal warranty in the catalogue) 2, 3, 5 Or higher

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer