Tender Overview
The procurement is for a PRESS BOARD FOR Z-MILL 40 MM THICK to be supplied to Salem Steel Plant, a unit of Steel Authority of India Limited located in SALEM, TAMIL NADU 636001. Scope: Only supply of goods with delivery terms aligned to the GeM portal, FOB Salem Steel Plant and inclusive of all freight, packing, and insurance charges. The contract allows a 25% quantity variation during both initial and extended delivery periods, ensuring flexibility for volume fluctuations. A data sheet must accompany bids to verify technical parameters, with deviations clearly indicated in Form 2. The bid must reflect GST applicability and the option to adjust GST on actuals up to the quoted rate. The emphasis is on timely delivery and accurate documentation to match drawings and specifications.
Technical Specifications & Requirements
- Product: PRESS BOARD FOR Z-MILL 40 MM THICK (no explicit technical spec provided in tender data).
- Data Sheet: mandatory upload; cross-check with offered product to avoid mismatch.
- Scope: strictly supply of goods; no service component.
- Delivery basis: F.O.R Salem Steel Plant; price to include all costs (P&F, freight, insurance) and applicable taxes.
- Payment: 100% within 30 days after receipt and acceptance at Salem Steel Plant Stores.
- ATC: deviations, if any, to be specified in Form 2; ensure drawings/specs alignment.
- Data verification: OEM/product life claimed must not be end-of-life within 1 year residual market life.
Terms, Conditions & Eligibility
- Quantity: up to +25% during contract; additional time calculated as (increase/original quantity) × original delivery period, with a 30-day minimum.
- Governance: bidder must not be in liquidation or bankruptcy; provide undertaking to this effect.
- Documentation: submit PAN, GSTIN, cancelled cheque, EFT mandate; data sheet and vendor code creation documents.
- GST: bidder should verify GST applicability; reimbursement as actuals or at the lower quoted rate.
- ATC: items must conform to specification and drawing; deviations allowed only in Form 2.
- Acceptance: material acceptance subject to matching data sheet and drawing.