GEM

Procurement Opportunity: Power Factor Meter - Digital in WEST KAMENG, ARUNACHAL PRADESH

Posted

15 Jul 2025, 06:06 pm

Deadline

14 Aug 2025, 06:00 pm

Value

₹2,43,980

Progress

Issue15 Jul 2025, 06:06 pm
Corrigendum29 Jul 2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

20

Bid Type

Two Packet Bid

Categories 4

North Eastern Electric Power Corporation Limited has released a public tender for Power Factor Meter - Digital (Q3) in WEST KAMENG, ARUNACHAL PRADESH. Quantity: 20. Submission Deadline: 14-08-2025 18: 00: 00. Download documents and apply online.

AI-Powered Bidder Prediction

Companies most likely to bid

Unlock Bidder Insights

AI predictions on likely bidders

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

29 Jul 2025

Frequently Asked Questions

# SEO-Optimized FAQs

# SEO-Optimized FAQs

Q1: How to register as a bidder for the Power Factor Meter tender issued by NEEPCO in 2025?
A: To participate in this power factor meter procurement tender, you need to complete your GeM registration process. This involves creating a comprehensive profile, uploading relevant business documents, and verifying your credentials. For seamless registration and expert assistance, you can visit TenderAI GeM Registration. Once registered, you can access the tender, upload required documents, and submit your bid online. Ensure your profile has validated MSME or startup status if you wish to avail specific benefits or preferences. Proper registration is crucial for smooth participation and helps in tracking your bid status easily.

Q2: What are the eligibility criteria for small scale enterprises in the NEEPCO power factor meter tender?
A: Micro and Small Enterprises (MSEs) intending to bid for this tender must possess valid Udyam registration or DPIIT startup certification. These benefits include exemption from certain experience and turnover criteria, provided they adhere to the quality and technical specifications outlined. MSEs need to upload supporting documentation such as registration certificates, past performance certificates, and turnover proof. The government encourages MSE participation to boost local manufacturing and promote Make in India. For assistance in verifying your eligibility and preparing documentation, visit TenderAI MSE Support.

Q3: What documents are required to participate in the government tender for digital power factor meters?
A: Bidders must upload several key documents:

  • Past supply performance certificates demonstrating the supply of similar equipment
  • Certified financial turnover statements for the last three years
  • OEM authorization and relevant CE and EMC compliance certificates
  • Udyam or DPIIT startup registration certificates (if claiming MSE or startup benefits)
  • Local content certificates, if applicable
  • Any technical datasheets or specifications conformity reports
    Failure to upload mandatory documents can result in disqualification. Preparing these documents in advance and verifying their validity will streamline your bid submission process.

Q4: How to ensure compliance with technical specifications for Power Factor Meters as per this tender?
A: To meet the technical requirements, your product must conform to the specifications listed, including:

  • 3 Phase, 4 Wire configuration with 440 V input
  • Input current range: 0 to 5A AC
  • Accuracy class: 0.5
  • Size: 96 x 96 mm
  • IP54 protection class
  • CE Certification and EMC compliance
  • Display features: 3-phase, 3-wire with 7-segment LED, resolution 0.001 PF
    Precise adherence to these specifications is critical for acceptance. Prepare accurate datasheets, testing certificates, and conformity documents to demonstrate product compliance during bid evaluation. Consulting with technical experts can enhance your product’s conformity.

Q5: What are the benefits of participating as an MSE or startup in this government tender?
A: MSEs and startups can avail multiple benefits:

  • Exemption from certain experience and turnover criteria—reducing entry barriers
  • Purchase preference of up to 25% on the total bid quantity if bidders meet prescribed price margins (within 15% of L1)
  • Faster approval and facilitation processes
  • Opportunities to showcase indigenous manufacturing capabilities under Make in India initiatives
    To maximize benefits, ensure your Udyam or DPIIT registration is valid and updated. Upload supporting certificates during bid submission, and leverage government policies to enhance your competitiveness.

Q6: How do I prepare my bid documents for the NE power project tender?
A: Begin with verifying all technical specifications and compliance certificates. Gather your supply performance records, turnover documents, OEM authorization certificates, and local content certificates if applicable. Ensure quality certifications like CE and EMC are valid.
Create a comprehensive bid file with clear, legible copies of all documents. Use checklists to confirm all mandatory items are included: certificates, past performance proofs, technical datasheets, and registration proof. Upload these documents via the GeM portal before the deadline of August 14, 2025. Double-check for completeness and accuracy, and consider consulting a bid preparation expert if necessary.

Q7: What are the logistics and delivery considerations for supplying power factor meters to Arunachal Pradesh?
A: The delivery location is Kameng Hydro Power Station, Arunachal Pradesh, which involves challenging terrain and potentially adverse weather conditions. To ensure timely delivery:

  • Plan for transportation via appropriate routes, possibly involving special permits or escorts
  • Schedule deliveries considering weather forecasts and access windows
  • Arrange for secure packaging to prevent damage in transit
  • Coordinate with local authorities for customs and clearance if applicable
    Proactive logistics planning will mitigate delays and ensure compliance with delivery timelines specified in the tender.

Q8: What steps should I take after submitting my bid for the NEPPCO power factor meter tender?
A: After bid submission:

  • Track your bid status via the GeM portal regularly
  • Be prepared to submit any clarifications or additional documents if requested during evaluation
  • Analyze competitors’ bids and prepare for negotiations or follow-up discussions
  • Use tools like TenderAI's Company Insights to evaluate your success rate and identify areas for bid improvement
  • Stay updated on the official notification for award results and further contractual formalities
    Successfully managing post-bid actions will enhance your chances of winning the contract and establishing a long-term supplier relationship.

End of FAQs