GEM

Mazagon Dock Shipbuilders Limited pressure hull penetration tender Mumbai Maharashtra 2025

Posted

29 Oct 2025, 03:34 pm

Deadline

08 Nov 2025, 04:00 pm

Progress

Issue29 Oct 2025, 03:34 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Single Packet Bid

Key Highlights

  • Mandatory online EMD payment to Mazagon Dock Shipbuilders Limited via RTGS/Online Banking
  • Option clause allowing quantity variation up to 50% of bid quantity at contracted rates
  • Delivery period adjustments computed as (Increase quantity / Original quantity) × Original delivery period, min 30 days
  • ATC document uploaded by Buyer; bidders must review and comply with additional terms
  • SBIN bank details provided for EMD: Account 10005255246, IFSC SBIN0009054, Mazagon Dock Branch
  • No BOQ items listed; procurement hinges on technical capability and acceptance testing for pressure hull penetrations

Tender Overview

Mazagon Dock Shipbuilders Limited invites bids for a pressure hull penetration with acceptance tests under the Department Of Defence Production in Mumbai, Maharashtra. The tender outlines an option-based quantity framework up to 50% additional quantity at contracted rates, with delivery timelines linked to the original and extended delivery periods. Online EMD submission via RTGS/IB is permitted to Mazagon Dock Shipbuilders Limited, with proof required. The arrangement emphasizes flexibility in order quantity and delivery sequencing, reflecting defence procurement dynamics and the need for compliant suppliers to adapt to fluctuating demand while meeting delivery schedules. The absence of BOQ items and explicit start/end dates indicates a focused, capability-driven selection for high-integrity marine structural components.

Technical Specifications & Requirements

  • Product category: Pressure hull penetration components with acceptance testing.
  • Delivery framework: Option to increase quantity up to 50% of bid/contracted quantity; delivery period adjustments calculated as (Increase quantity / Original quantity) × Original delivery period, minimum 30 days.
  • Documentation: Online EMD payment to Mazagon Dock Shipbuilders Limited; scanned proof of RTGS/online transfer must be uploaded with bid.
  • Financial mechanics: Contract may extend delivery time during option exercise, within the constraints of the extended period.
  • ATC: Refer to uploaded ATC document for additional bidder obligations; exact technical standards not specified in the available data.
  • BoQ: No items listed in the BOQ data provided, suggesting a specifications-driven evaluation.

Terms, Conditions & Eligibility

  • EMD/Payment: EMD to be paid online via RTGS/IB; account details provided (SBIN 10005255246, IFSC SBIN0009054).
  • Delivery: Original delivery period governs timing; option-driven extensions require calculations with a minimum 30 days.
  • Prices: Bid quantities may be adjusted by up to 50% during and after contract execution.
  • Compliance: Bidders must upload proof of online payment and comply with all ATC terms; no explicit start date is listed.
  • Documentation: Bid submission must include RTGS proof and any additional ATC documents; OEM authorizations may be required per ATC.
  • Warranty/Penalty: Not specified in the available data; ATC document may contain penalties or performance terms.
  • Eligibility: Suppliers with capability to supply defence-grade hull penetration components and adherence to defence procurement standards are expected to participate.

Key Specifications

  • Product/service names: pressure hull penetration components with acceptance tests

  • Quantity/Value: up to 50% quantity increase; exact values not specified in data

  • EMD/Value: Online payment via RTGS; account details provided

  • Standards/Certifications: Not specified in available data; ATC may define requirements

  • Delivery/Installation: Original delivery period governs; extended period follows option clause; minimum 30 days

  • Experience: Defence marine component capability implied by department and procurement context

Terms & Conditions

  • Option-based quantity variation up to 50% at contracted rates

  • Online EMD payment to Mazagon Dock Shipbuilders Limited via RTGS

  • Delivery period adjustments based on original and extended periods with minimum 30 days

  • ATC document governs additional bidder obligations

  • No BOQ items in provided data; emphasis on technical/compliance evaluation

Important Clauses

Payment Terms

EMD must be paid online via RTGS/IB, with proof uploaded; beneficiary Mazagon Dock Shipbuilders Limited. Use bid number and entity name in transaction details.

Delivery Schedule

Delivery period starts from the last date of the original delivery order; upon exercising the option, additional time = (Increase quantity / Original quantity) × Original delivery period, minimum 30 days.

Penalties/Liquidated Damages

Penalties not specified in available data; ATC may contain LD provisions; bidders should review ATC document for penalties.

Bidder Eligibility

  • Capability to supply defence-grade pressure hull penetration components

  • Compliance with ATC terms and any OEM authorizations as required by ATC

  • Demonstrable experience in similar defence/marine procurement projects

AI-Powered Bidder Prediction

Companies most likely to bid

Unlock Bidder Insights

AI predictions on likely bidders

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN) Card

3

Experience certificates for similar defence marine components

4

Financial statements or turnover documents

5

Online EMD payment receipt / proof of RTGS transfer

6

Technical bid documents and compliance certificates

7

OEM authorizations (if applicable) per ATC

8

Any ATC-specific documents uploaded by the buyer

Frequently Asked Questions

How to bid for the pressure hull penetration tender in Mumbai 2025?

Bidders must submit online EMD via RTGS to Mazagon Dock Shipbuilders Limited (SBIN0009054), upload proof with the bid, and comply with the ATC terms. Ensure capability in defence marine components and review the supplier acceptance testing requirements for hull penetrations.

What documents are required for the Mazagon Dock tender in Maharashtra?

Required documents include GST registration, PAN, experience certificates for similar components, financial statements, EMD payment proof, technical bid and compliance certificates, and OEM authorizations if specified in ATC. Ensure the online transfer receipt clearly shows bid reference details.

What is the delivery extension mechanism for quantity increases?

If quantity increases up to 50%, the extension is calculated as (Increase quantity / Original quantity) × Original delivery period, with a minimum extension of 30 days, and may extend within the original delivery window dictated by the contract.

What are the EMD submission details for this Mumbai tender?

EMD is payable online via RTGS to Mazagon Dock Shipbuilders Limited; use account number 10005255246 and IFSC SBIN0009054. Upload scanned proof of online payment with the bid and indicate the bid number and bidding entity during transfer.

Where can I find the ATC requirements for this procurement in Mumbai?

The buyer has uploaded an ATC document containing additional terms beyond the base tender. Bidders should view the ATC to confirm specific obligations, penalties, and any brand/OEM requirements associated with pressure hull penetrations.

What is the expected scope for the pressure hull penetration items?

The available data specifies pressure hull penetration with acceptance testing. Exact quantities, dimensions, and material specs are defined in the ATC and any OEM approvals; bidders must ensure compliance with defence-grade marine components and relevant acceptance criteria.

Are BOQ items provided for this Mazagon Dock procurement?

No BOQ items are listed in the provided data. Bid evaluation will rely on technical capability, compliance with ATC terms, and readiness to deliver defence-grade hull penetrations rather than a predefined bill of quantities.