Mazagon Dock Shipbuilders Limited invites bids for a pressure hull penetration with acceptance tests under the Department Of Defence Production in Mumbai, Maharashtra. The tender outlines an option-based quantity framework up to 50% additional quantity at contracted rates, with delivery timelines linked to the original and extended delivery periods. Online EMD submission via RTGS/IB is permitted to Mazagon Dock Shipbuilders Limited, with proof required. The arrangement emphasizes flexibility in order quantity and delivery sequencing, reflecting defence procurement dynamics and the need for compliant suppliers to adapt to fluctuating demand while meeting delivery schedules. The absence of BOQ items and explicit start/end dates indicates a focused, capability-driven selection for high-integrity marine structural components.
Technical Specifications & Requirements
- Product category: Pressure hull penetration components with acceptance testing.
- Delivery framework: Option to increase quantity up to 50% of bid/contracted quantity; delivery period adjustments calculated as (Increase quantity / Original quantity) × Original delivery period, minimum 30 days.
- Documentation: Online EMD payment to Mazagon Dock Shipbuilders Limited; scanned proof of RTGS/online transfer must be uploaded with bid.
- Financial mechanics: Contract may extend delivery time during option exercise, within the constraints of the extended period.
- ATC: Refer to uploaded ATC document for additional bidder obligations; exact technical standards not specified in the available data.
- BoQ: No items listed in the BOQ data provided, suggesting a specifications-driven evaluation.
Terms, Conditions & Eligibility
- EMD/Payment: EMD to be paid online via RTGS/IB; account details provided (SBIN 10005255246, IFSC SBIN0009054).
- Delivery: Original delivery period governs timing; option-driven extensions require calculations with a minimum 30 days.
- Prices: Bid quantities may be adjusted by up to 50% during and after contract execution.
- Compliance: Bidders must upload proof of online payment and comply with all ATC terms; no explicit start date is listed.
- Documentation: Bid submission must include RTGS proof and any additional ATC documents; OEM authorizations may be required per ATC.
- Warranty/Penalty: Not specified in the available data; ATC document may contain penalties or performance terms.
- Eligibility: Suppliers with capability to supply defence-grade hull penetration components and adherence to defence procurement standards are expected to participate.