PT, 110V, 3.3KV, 1PH,MULTI METER,KIT CABLE JOINTER,ADHESIVE TAPE SCOTCH,CABLE, 1.1 KV, 2CORE COPPER
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Bid Publish Date
18-Oct-2025, 11:28 am
Bid End Date
08-Nov-2025, 9:00 am
Location
Progress
Quantity
428
Category
PT, 110V, 3.3KV, 1PH
Bid Type
Two Packet Bid
Eastern Coalfields Limited invites bidders for a bundled procurement of electrical items including PT, 110V, 3.3KV, 1PH devices, multi meters, kit cables, 1.1 kV cables (2 core copper), LED flood lights, timer relays (550V AC, 0-5 min), bolts, wrenches, coil accessories and contractor hardware. Estimated value and quantities are not disclosed; however, the scope covers 12 items with delivery across the Bardhaman region, West Bengal. The contract allows up to a 25% quantity variation during placement and currency as per option clause, with minimum 30 days extra delivery time when triggered. Provisions emphasize data sheet alignment and pre/post inspection processes, ensuring BOM and product conformity.
Electrical items including 110V/3.3KV/1PH units, multi meters, 1.1 kV cables (2 core copper)
LED flood lights (240V 50W) and timer relays (550V AC, 0-5 min)
CSA/IS standards not disclosed; data sheet alignment required
Coil and bolt accessories (110V DC, 16 mm to 150 mm with nut)
Delivery quantity variation up to 25% with extended period minimum 30 days
Data sheet alignment mandatory; mismatch leads to rejection
Post-receipt inspection at Area Engineer (E&M); pre-dispatch not applicable
EFT-based payments as per PSU norms; bank-certified EFT mandate required
Delivery period starts from last date of original delivery order; extended period if quantity increases
Not specified in data; general PSU guidelines to apply
Experience in supplying electrical components to PSUs or government departments within last five years
Valid PAN and GSTIN; bank EFT mandate
Ability to provide Data Sheet matching BOM and post-receipt inspection readiness
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
PT, 110V, 3.3KV, 1PH , MULTI METER , KIT CABLE JOINTER , ADHESIVE TAPE SCOTCH , CABLE, 1.1 KV, 2CORE COPPER , FLOOD LIGHT ELEC, LED, 240V 50W , TIMER RELAY 550V AC,0-5 MIN , BOLT, HEX, CS,HT HALF , WRENCH, SE 46 MM , COIL, 110V DC, OPERATING , BOLT, HEX CS HT HALF, 16 MM, 150 MM WITH NUT , CONTRACTOR, 150U
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Eastern Coalfields Limited
BARDHAMAN, WEST BENGAL
Tender Results
Loading results...
PT, 110V, 3.3KV, 1PH
As Per Technical Specification Sheet
MULTI METER
As Per Technical Specification Sheet
KIT CABLE JOINTER
As Per Technical Specification Sheet
ADHESIVE TAPE SCOTCH
As Per Technical Specification Sheet
CABLE, 1.1 KV, 2CORE COPPER
As Per Technical Specification Sheet
FLOOD LIGHT ELEC, LED, 240V 50W
As Per Technical Specification Sheet
TIMER RELAY 550V AC,0-5 MIN
As Per Technical Specification Sheet
BOLT, HEX, CS,HT HALF
As Per Technical Specification Sheet
WRENCH, SE 46 MM
As Per Technical Specification Sheet
COIL, 110V DC, OPERATING
As Per Technical Specification Sheet
BOLT, HEX CS HT HALF, 16 MM, 150 MM WITH NUT
As Per Technical Specification Sheet
CONTRACTOR, 150U
As Per Technical Specification Sheet
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | PT, 110V, 3.3KV, 1PH | As Per Technical Specification Sheet | 2 | pieces | [email protected] | 15 | |
| 2 | MULTI METER | As Per Technical Specification Sheet | 2 | pieces | [email protected] | 15 | |
| 3 | KIT CABLE JOINTER | As Per Technical Specification Sheet | 5 | pieces | [email protected] | 15 | |
| 4 | ADHESIVE TAPE SCOTCH | As Per Technical Specification Sheet | 12 | pieces | [email protected] | 15 | |
| 5 | CABLE, 1.1 KV, 2CORE COPPER | As Per Technical Specification Sheet | 300 | meters | [email protected] | 15 | |
| 6 | FLOOD LIGHT ELEC, LED, 240V 50W | As Per Technical Specification Sheet | 10 | pieces | [email protected] | 15 | |
| 7 | TIMER RELAY 550V AC,0-5 MIN | As Per Technical Specification Sheet | 6 | pieces | [email protected] | 15 | |
| 8 | BOLT, HEX, CS,HT HALF | As Per Technical Specification Sheet | 40 | pieces | [email protected] | 15 | |
| 9 | WRENCH, SE 46 MM | As Per Technical Specification Sheet | 2 | pieces | [email protected] | 15 | |
| 10 | COIL, 110V DC, OPERATING | As Per Technical Specification Sheet | 3 | pieces | [email protected] | 15 | |
| 11 | BOLT, HEX CS HT HALF, 16 MM, 150 MM WITH NUT | As Per Technical Specification Sheet | 40 | pieces | [email protected] | 15 | |
| 12 | CONTRACTOR, 150U | As Per Technical Specification Sheet | 6 | pieces | [email protected] | 15 |
Discover companies most likely to bid on this tender
PAN Card Copy
GSTIN Copy
Cancelled Cheque Copy
EFT Mandate Certified by Bank
Data Sheet of offered products
Past supply orders to CI L or subsidiaries (proven-ness)
Self-certified proof of supply against orders
OEM authorization or data on product certifications
Key insights about WEST BENGAL tender market
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and a detailed Data Sheet. Ensure BOM alignment with offered items and provide proven-ness documents from past five years to CI L or subsidiaries. Delivery terms follow the option clause with up to 25% quantity variation.
Submit the product Data Sheet alongside the bid, ensuring it exactly matches the BOM. Include proof of supply for similar items in the last five years and any OEM authorizations. Incomplete data sheets or mismatches risk bid rejection.
The purchaser may increase quantity up to 25% of bid quantity at contract award and during currency. Additional delivery time is calculated as (Increased quantity / Original quantity) × Original delivery period, with a minimum of 30 days.
Post receipt inspection will be conducted at the Area Engineer (E&M) site before acceptance. Pre-dispatch inspection is not applicable. Suppliers must ensure stores comply with the post-check parameters to avoid rejection.
Mandatory certificates include PAN, GSTIN, EFT mandate, and Data Sheet alignment. Proven-ness evidence requires self-certified supply orders from the last five years to CI L or allied organizations; missing certificates will lead to bid rejection.
Payments follow PSU EFT norms; expect processing after acceptance and verification of supplied items, with bank-certified EFT mandates. Exact payment timeline aligns with organization-specific terms, typically within standard government procurement cycles.
Items include electrical components such as PT, 110V, 3.3KV, 1PH devices, 2-core copper cables, LED 240V 50W flood lights, timer relays 550V AC 0-5 min, bolts, wrenches, coil hardware, and contractor equipment.
Bidders must ensure the Data Sheet is ISI or equivalent standard-aligned and matches the BOM exactly; any mismatch risks bid rejection. Cross-check item specifications before submission to ensure compliance.
Hqids
Andrew Yule Company Limited
📍 KANCHIPURAM, TAMIL NADU
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Indian Army
📍 JHANSI, UTTAR PRADESH
Bangalore Metro Rail Corporation Limited
📍 BANGALORE, KARNATAKA
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS