Tender Overview
The Indian Coast Guard invites bids for the fabrication and fitment of office work stations or cubicles in South Andaman, Andaman & Nicobar 744101. The scope includes supply, installation, testing and commissioning of office cubicles. The buyer reserves a 25% quantity adjustment at contract award and during the contract period at contracted rates. A Service Centre is required in the consignee state, with setup within 30 days of award if not pre-existing. This procurement emphasizes on-site deployment and post-installation support, with delivery timelines linked to the original delivery period. The bid seeks turnkey delivery, ensuring compatibility with office workspace standards and on-site installation feasibility. Unique aspects include flexible quantity adjustments and mandatory service capability in the destination state.
Technical Specifications & Requirements
- Scope: Supply, Installation, Testing and Commissioning (SITC) of office cubicles/work stations
- Delivery model: On-site installation at South Andaman location; integration with existing office layouts
- Service requirement: Functional Service Centre in the consignee state or establishment within 30 days post-award
- Quantity flexibility: Up to 25% increase/decrease at bid and during contract at contracted rates
- Documentation: PAN, GSTIN, Cancelled Cheque, EFT Mandate (bank certified)
- Terms: Delivery period governed by original delivery period; option time calculated per clause, minimum 30 days
- Scope inclusions: All cost components embedded in bid price (TRANS, VAT/IST, installation)
Terms, Conditions & Eligibility
- EMD: Not specified in data; bidders must comply with standard procurement norms and provide required bid security as applicable
- Service centre: Required in state of consignee; establish within 30 days of award if absent
- Payment terms: As per contract; ensure submission of EFT mandate and bank details
- Documentation: PAN, GSTIN, Cancelled cheque, EFT mandate with bid submission
- Delivery: Delivery period linked to original delivery timeline; extended time follows option clause calculations
- Scope: Turnkey SITC of office cubicles with warranty/after-sales as per contract
- Compliance: Bidders must satisfy all terms and supply chain prerequisites