Tender Overview
Revenue and Forest Department Maharashtra invites bids for a comprehensive Disaster Management Kit package comprising a 36-item First Aid Kit, floatable and foldable multi-stretchers (virus-resistant, adult and medium variants), lifejackets (multipurpose), safety helmets (3 per kit), hand safety gloves, gumboots (2 pairs per kit), safety nets (3 x 10 m), rappelling rope (30 m) and a dedicated kit storage box. The project lists an EMD of ₹4,700,000 and includes a Buyer Clause enabling up to a 25% quantity variation at contracted rates. Location is Maharashtra; intent is disaster management readiness equipment procurement. The BOQ shows 10 items but exact quantities are not disclosed, highlighting bulk deployment potential and phased delivery aligned to option period. Unique terms require bidders to comply with the option clause and agreed delivery timelines starting from the last order date. The ATC document has been uploaded by the buyer for detailed compliance.
Technical Specifications & Requirements
- Product scope: 36-item first aid kit, floatable foldable stretchers (adult size, medium size), virus-resistant variants, lifejackets, safety helmets (3 per kit), gloves, gumboots (2 pairs per kit), safety net 3 x 10 m, 30 m rappelling rope, storage box.
- EMD: ₹4,700,000 (required with bid).
- Bundle characteristics: 10-item BOQ framework with unspecified item quantities; bulk deployment implied.
- Standards/Compliance: No explicit standards listed in the data; bidder must inspect ATC for exact certification requirements.
- Delivery scope: Clause allowing quantity variation up to ±25%; delivery timeline linked to the original delivery period with proportional adjustments.
- Documentation access: ATC document uploaded for additional compliance details.
Terms, Conditions & Eligibility
- EMD: ₹4,700,000 to be deposited as per instructions in tender terms.
- Option clause: Purchaser may increase/decrease quantity by up to 25% at contract; extended delivery time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
- Delivery & acceptance: Delivery period starts from the last date of the original delivery order; extension rules apply under option clause.
- ATC availability: Buyer-uploaded ATC document governs additional compliance requirements; bidders must review prior to submission.
- Other terms: Bidders must comply with option clause and delivery calculations; end-to-end bid submission should include all required ATC references.