Tender Overview
The procurement is an Annual Maintenance Contract (AMC) for 12 online stack dust monitoring systems to be installed and serviced inside Rourkela Steel Plant (SAIL), located in Sundargarh, Odisha (769001). This tender, issued by the Rourkela Steel Plant, seeks continuous maintenance support for dust monitoring units, ensuring reliability, calibration, and fault resolution. The scope centers on post-installation AMC rather than initial supply, with a clear emphasis on upkeep, uptime, and service delivery within the plant environment. The unique aspect is the consolidation of 12 monitoring units under a single AMC for streamlined oversight and standardised service levels across all stacks. Bidders should prepare to demonstrate capability to manage multiple units within a single contract framework while adhering to internal RSP maintenance protocols.
Technical Specifications & Requirements
- Product/Service: AMC of 12 online stack dust monitoring systems installed inside Rourkela Steel Plant premises, Sundargarh, Odisha.
- Quantity: 12 units under a unified maintenance contract.
- Location/Scope: Within RSP facilities; ongoing maintenance, calibration, fault diagnostics, and replacement of worn components.
- Specifications Status: No explicit technical specs provided in tender data; bidders should assume standard online dust monitoring performance metrics and calibration routines per industry practice and any plant-specific SOPs.
- EMD/Value: Not disclosed in available data; bidders should monitor tender portal for updates and ATC document terms.
- ATC/Documentation: An ATC document has been uploaded; bidders must review for site-specific terms and compliance.
Terms, Conditions & Eligibility
- EMD: Not specified in the data available; verify on the tender portal and ATC document.
- Experience: No explicit years or turnover mentioned in data; bidders should review ATC for eligibility criteria and align with SAIL procurement norms.
- Delivery/Timeline: No delivery schedule provided; AMC implies ongoing service post-award with standard maintenance cycles.
- Payment Terms: Not specified in data; refer to ATC for payment cadence and invoicing requirements.
- Documents: Refer to ATC for required documents (GST, PAN, experience records, financial statements, OEM authorizations if applicable).
- Penalties/Warranty: No explicit LD or warranty terms in data; ATC may contain performance penalties or service levels.