Tender Overview
The opportunity is with the Indian Army (Department Of Military Affairs) for procurement of multiple engine spare parts including TIMING OIL SEAL, HALF PACKING KIT, OVER FLOW PIPE, PISTON, PISTON RING SET, OIL FILTER, FUEL FILTER, VALVE SET, and BIG AND BRG SET. Located in LEH, JAMMU & KASHMIR – 194101, the estimated value is ₹17,155.00. Suppliers should anticipate a 9-item scope of parts with a single procurement envelope and potentially sample submission for required items. The tender emphasizes OEM participation and post‑sales service readiness, with a unique field requirement to demonstrate installation and maintenance capabilities in-country. Notable differentiators include the option clause allowing up to 25% quantity variation and a mandatory one‑year warranty from final acceptance. This is a government procurement by a defense entity, with a focus on timely delivery and robust service support.
Technical Specifications & Requirements
- Item categories: timing seal, packing kit, flow pipe, piston, piston ring, oil/filter, fuel filter, valve set, big and bearing set.
- Location: Leh, Jammu & Kashmir.
- Estimated value: ₹17,155.00.
- Warranty: 1 year from final acceptance or post-installation; OEM warranty certificates required at delivery.
- Delivery terms: delivery period governed by option clause; minimum extension rule adds up to 30 days if required.
- OEM turnover: minimum average annual turnover for OEM over last 3 years as per bid document; audited statements or CA certificate required.
- Service capability: installation, commissioning, training, troubleshooting, and after‑sales service presence in India with local service centers.
- Sample submission: bidders advised to submit samples of required items.
Terms, Conditions & Eligibility
- EMD: not specified in data; bidders must check terms for security deposit requirements.
- Turnover eligibility: OEMs must meet minimum average annual turnover for the past 3 years; provide audited balance sheets or CA certificate.
- Warranty: 1 year warranty; provide OEM warranty certificates at delivery.
- Delivery timeline: delivery period linked to original delivery order; extension rules apply with minimum 30 days.
- Post‑sales support: established installation and maintenance network in India; upload service center details at bid submission.
- Sample clause: submit item samples with bid as advised by buyer.
