Tender Overview
Dg Of Defence Estate invites bids for a range of bulk biogas and related structural components, including metal biogas moulds (10 Cu.M), concrete structure fittings, fiber domes (3 feet height), biogas dome fittings, sulfur filters, cylinder tanks, compressor units for biogas storage, mounting plates, stands, NRV, moisture and carbon dioxide filters, 5 HP motor assemblies, starters, pushbuttons, relief piping, and rubber balloons (20 Cu.M). Estimated value and EMD are not disclosed. Quantity variation up to 25% is allowed by the Purchaser at contract award and during currency with rates unchanged. Delivery timelines will adjust per the extended period logic; minimum extension is 30 days. Procurement location and start dates are not specified. Bidders must align with the Purchaserβs option clause and submit compliant bids.
Technical Specifications & Requirements
- Product scope includes: metal biogas moulds, concrete structures, fiber domes, biogas storage components, filtration units (sulfur, moisture, CO2), 5 HP motor and starter assemblies, NRV, valves, and related piping.
- Key deliverables: biogas storage solutions and associated mounting hardware; rubber balloon storage capacity 20 Cu.M.
- Standards/quality: not specified; bidders should assume standard fabrication and safety compliance for biogas equipment and heavy-duty metal/FRP components; no explicit IS/ISO references provided.
- BoQ: 12 items listed with N/A quantities; no unit measurements provided; emphasis on comprehensive product coverage and supplier capability to meet end-to-end pack.
- Experience: no explicit experience criteria given; bidders should prepare technical capability across gas storage, filtration, and mechanical mounting assemblies.
- Delivery: terms reference option clause; actual schedule to be determined at contract stage; ensure readiness to scale up to 25% more quantity.
- Documentation: ATC uploaded; verify terms and conditions for mandatory technical compliance documents.
Terms, Conditions & Eligibility
- EMD and exact estimated value are not disclosed; bidders must seek clarity or bid with provisional compliance assumptions.
- Option Clause: Purchaser may increase/decrease quantity up to 25% at contract rates; delivery time extensions calculated as (increase/original) Γ original days with a minimum 30 days.
- Delivery timeline: defined by last delivery order date; extended delivery allowances apply during currency.
- Compliance: bidders must adhere to the at-puyer terms and submit required documents per Terms and Conditions.
