Hiring of Consultants - Milestone/Deliverable Based - Subject Matter Experts, Soil Investigation; S
Indian Army
JODHPUR, RAJASTHAN
Progress
Quantity
1
Bid Type
Two Packet Bid
NTPC Limited invites consultancy services for a Detailed Feasibility Study (FSR/FR) aimed at augmentation of railway siding infrastructure, including Over Head Electrification and S&T systems for the Bong project, located in KOKRAJHAR, ASSAM (PIN 783332). The engagement is milestone/deliverable-based and targets Subject Matter Experts to deliver feasibility deliverables within the railway infrastructure expansion context. Key control is the mandatory pre-approval from Northeast Frontier Railway (NFR); only bidders with NFR approval may participate, with documentary evidence required at bid submission. The absence of a formal BOQ and undefined estimated value means bidders must prepare for scope-driven deliverables and responsive FR/FSR outputs.
Consultancy type: Detailed Feasibility Study (FSR/FR) for railway siding augmentation
Scope includes Over Head Electrification (OHE) and S&T systems integration
Location: Bong project corridor, KOKRAJHAR, ASSAM 783332
Delivery model: milestone/deliverable-based consultancy
No explicit BOQ; emphasis on feasibility deliverables and regulatory approvals
NFR approval is a non-negotiable eligibility criterion
Delivery framework is milestone-based with deliverables tied to feasibility outputs
Submission requires documentary evidence of NFR approval; unsolicited bids rejected
Bids must be from consultants/firms approved by Northeast Frontier Railway (NFR); documentary evidence to be included with bid
Participation subject to uploaded ATC terms; non-compliance may render bid invalid
Feasibility study milestones to be defined within the consultancy contract framework; details not provided in data
Must be approved by Northeast Frontier Railway (NFR) to undertake feasibility reports for railway siding projects
Submission must include documentary evidence of NFR approval
Experience in railway feasibility studies or related consultancy domains is expected per standard practice
Main Document
SCOPE_OF_WORK
PAYMENT
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
JODHPUR, RAJASTHAN
Bharat Sanchar Nigam Limited Portal(bsnl)
CENTRAL DELHI, DELHI
Cochin Port Trust
ERNAKULAM, KERALA
Bharat Petroleum Corporation Ltd
MUMBAI, MAHARASHTRA
North Eastern Electric Power Corporation Limited
KAMRUP, ASSAM
Tender Results
Loading results...
Documentary evidence proving approval by Northeast Frontier Railway (NFR) to undertake feasibility report work
Bid submission must include evidence of NFR approval; other standard bidder documents may be required per terms
Any OEM authorizations or technical qualifications typical for railway feasibility consultants are not explicitly listed but commonly expected
Extended Deadline
27-Nov-2025, 3:00 pm
Opening Date
27-Nov-2025, 3:30 pm
Extended Deadline
17-Nov-2025, 3:00 pm
Opening Date
17-Nov-2025, 3:30 pm
Extended Deadline
13-Nov-2025, 3:00 pm
Opening Date
13-Nov-2025, 3:30 pm
| S.No | Seller | Date | Status |
|---|---|---|---|
| 1 | PIR PROJECTS & CONSULTANCY PRIVATE LIMITED Under PMA | 25-11-2025 13:51:49 | Qualified |
| 2 | RCC (INFRASTRUCTURE) CONSULTANTS PRIVATE LIMITED Under PMA | 08-11-2025 15:26:25 | Qualified |
| 3 | RITES LIMITED Under PMA | 16-11-2025 13:11:12 | Qualified |
| 4 | YOLAX INFRANERGY PRIVATE LIMITED Under PMA | 25-11-2025 12:04:45 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | PIR PROJECTS & CONSULTANCY PRIVATE LIMITED( MSE Social Category:General ) Under PMA | ₹55,46,000 | Item Categories : Hiring of Consultants - Milestone/Deliverable Based - Subject Matter Experts; Consultancy Package f |
| L2 | YOLAX INFRANERGY PRIVATE LIMITED Under PMA | ₹57,77,777 | Item Categories : Hiring of Consultants - Milestone/Deliverable Based - Subject Matter Experts; Consultancy Package f |
| L3 | RCC (INFRASTRUCTURE) CONSULTANTS PRIVATE LIMITED( MSE Social Category:General ) Under PMA | ₹88,50,000 | Item Categories : Hiring of Consultants - Milestone/Deliverable Based - Subject Matter Experts; Consultancy Package f |
| L4 | RITES LIMITED Under PMA | ₹2,36,00,000 | Item Categories : Hiring of Consultants - Milestone/Deliverable Based - Subject Matter Experts; Consultancy Package f |
Key insights about ASSAM tender market
Bidders must obtain NFR approval before submission and attach documentary evidence of approval. The tender seeks a milestone-based feasibility study (FSR/FR) for Bong siding, including OHE and S&T. Ensure your organization is NFR-approved and prepare standard consultancy documents, technical approach, and delivery milestones for submission.
Required documents include documentary evidence of NFR approval to perform feasibility studies, corporate credentials, past experience in railway feasibility or related consultancies, and typical bidder certifications. Precise EMD or financials are not specified here; follow standard NTPC tender submission practices and ATC terms.
The scope covers Detailed Feasibility Study for siding augmentation, with inclusion of Over Head Electrification and S&T systems. Specific technical standards are not listed; bidders should apply applicable railway engineering methodologies and NFR guidelines, delivering FSR/FR reports with integration considerations.
Exact submission deadlines are not provided in the data. Bidders should monitor NTPC procurement communications for the NFR-approved eligibility criteria and ATC terms, ensure documentary evidence is prepared, and align with standard bid submission timelines once published.
Eligibility hinges on NFR approval to undertake feasibility work; bidders must submit documentary proof of approval. Additional criteria typically include prior railway feasibility experience and compliance with procurement documentation, though exact years or turnover requirements are not stated in the provided data.
NFR approval is mandatory to participate; without it bids will be treated as unsolicited. Submit clear documentary evidence of approval with your bid and ensure your team has demonstrated capacity for railway siding feasibility studies, including OHE/S&T considerations.
Prepare a comprehensive milestones plan covering scoping, methodology, data collection, preliminary design inputs, risk assessment, and final FSR/FR deliverables. Although milestones are not numerically defined in data, align with typical railway feasibility milestones and ensure acceptance criteria are clear in the contract terms.
Specific standards are not listed; bidders should apply general railway feasibility practices and any applicable NFR guidelines. Ensure the approach demonstrates regulatory compliance, safety considerations for siding augmentation, and integration with OHE and S&T components in the Bong corridor.
Hindustan Petroleum Corporation Ltd
📍 MUMBAI, MAHARASHTRA
N/a
📍 GANDHI NAGAR, GUJARAT
Rural Electrification Corporation Limited
📍 GURGAON, HARYANA
Rural Electrification Corporation Limited
📍 SOUTH DELHI, DELHI
Rural Electrification Corporation Limited
📍 SOUTH DELHI, DELHI
Sign up now to access all documents
Main Document
SCOPE_OF_WORK
PAYMENT
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS