Tender Overview
The Organization is the Indian Army under the Department of Military Affairs, inviting bids for an assortment of propulsion and mechanical seal components, including GASKETs, HOSE assemblies, BOOTS, SEALING RINGS, and related packing materials, located in KANGRA, HIMACHAL PRADESH. The procurement includes 32 itemized categories with diverse gasket and boot parts, potentially triggering a bundled supply contract with an estimated volume implied by multiple line items. A key differentiator is the option to extend orders by up to 25% of initial quantity and the possibility of repeat orders up to 50% within six months of completion, maintaining contracted rates. This tender emphasizes detailed design alignment and post-award drawing approvals to ensure fabrication conforms to buyer feedback. Unique clauses include a minimum extension rule and a requirement for drawings approval before fabrication. This tender targets vendors capable of rapid adaptation to buyer-approved modifications and scalable quantities.
Technical Specifications & Requirements
- No technical specifications are listed in the public data; the BoQ shows 32 items labeled with varied gasket, boot, hose, ring, and cover references without explicit dimensions. Estimated value and EMD are not disclosed in the provided data. The buyer requires Detailed Design Drawings within 5 days of award, with acceptance or modification lists provided by the buyer within 5 days. A delivery timeline aligns with extended delivery periods tied to option quantities; the calculation is (extra qty/original qty) × original delivery period, min 30 days. Rework is allowed to reflect approved drawings.
Terms, Conditions & Eligibility
- Option Clause: Purchaser may modify quantity by up to 25% at contract placement and during currency at contracted rates.
- Design Drawings: Submit Detailed Design Drawings within 5 days of award; buyer responds with approval or modification list within 5 days; delay in buyer approval extends delivery without LD.
- Repeat Order: Up to 50% of current contract quantity can be placed within six months post-supply completion, at same terms. Failure to upload required certificates may lead to rejection.
- Mandatory submissions: Certificates and documents specified in the bid document/ATC; non-compliance risks disqualification.
