Tender Overview
Armoured Vehicles Nigam Limited (Department of Defence Production) invites bids for a water pipe item under HSN code 8409 9990. The project specifies a delivery period of 180 days from the supply order; the GST rate is 18% with GST registration considerations managed by bidders. The call emphasizes vendor eligibility, mandatory documentation for vendor code creation, and adherence to packing standards with non-returnable original packaging, ensuring proper weight accounting. The item category aligns with defense procurement requirements, with demurrage and acceptance governed by buyer inspection and MT (Material Test) certificates. The tender restricts participation to established vendors approved by AVNL/EFA/OFB, and requires compliance documentation for eligibility. A notable differentiator is the explicit insistence on original packing material and lab-tested acceptance, controlling downstream quality. Unique terms include demurrage charges of 0.5% per day for unlifted rejected items and a one-year warranty window post-acceptance.
Technical Specifications & Requirements
- HSN Code: 8409 9990; GST: 18%; Delivery: 180 Days from supply order.
- Packing: original packing; non-returnable; standardized weights; net weight only counts.
- Quality: Material Test Certificate must accompany supply; buyer lab results govern acceptance.
- Warranty: 1 year from final acceptance or installation completion.
- Documentation: PAN, GST, cancelled cheque, EFT mandate; vendor code creation requirements.
- Demurrage: 0.5% of total contract value per day for unlifted items; destruction if not lifted within a month.
- Eligibility: Bids from established AVNL/OFB/EFA vendors only; GST considerations apply.
- Requirements ensure compliance with defense sourcing and strict acceptance protocols.
Terms, Conditions & Eligibility
- EMD/Deposit details not listed; bidders must rely on ATC terms for security submissions.
- Delivery terms specify 180 days from supply order.
- Packing Material is non-returnable; weight basis uses net weight.
- Required MT Certificate and lab verification with acceptance criteria.
- Warranty: 1 year post-acceptance/installation; may influence post-sales support expectations.
- Pre-qualification: vendor code creation requires PAN, GSTIN, cancelled cheque, and EFT mandate.
- Demurrage: 0.5% daily for undischarged items; destruction after one month if not lifted.
- GST at 18% applies; GST reimbursements guided by actuals or applicable rates.