GEM Active

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Transmission Line;

Value

₹3,24,500

Deadline

26 Sept 2025

Location

NORTH CACHAR HILLS, ASSAM

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Transmission Line;

Tender Key Details

Organization

Power Grid Corporation Of India Limited

Department

POWER GRID Corporation OF INDIA Limited

Quantity

1

Bid Validity

180 (Days)

Bid Type

Two Packet Bid

Tender Overview

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Transmission Line;

Important Timeline

Start: 27 Aug 2025

End: 26 Sept 2025

AI-Powered Bidder Prediction

Discover which companies are most likely to bid

Live Analysis

Unlock Bidder Insights

Get AI-powered predictions about which companies are most likely to bid on this tender

Additional Information

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Transmission Line;

Item Category

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Transmission Line; Transmission line towers; Buyer

Organization Details

Authority

Organization

Power Grid Corporation Of India Limited

Department

POWER GRID Corporation OF INDIA Limited

Ministry

Ministry of Power

Contact

State

ASSAM

Documents & Downloads

GeM-Bidding-8162527.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

Scope Of Work Document

SCOPE_OF_WORK

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents from Seller

Certificate (Requested in ATC),Additional Doc 1 (Requested in ATC),Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Additional Info

Evaluation Method

Total value wise evaluation

Arbitration

Yes (Arbitration clause document) as per DoE OM No.F.1/2/2024-PPD dated 03.06.2024 Arbitration should not be routinely included in contracts

Bid to RA

No